Loading...
SC-Coppell HS-LR 991229FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 752.29 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 29, 1999 PROJECT: Coppell High School, Multi Purpose Building Project No.: 0791-2208 Coppell, Texas DATE PERFORMED: December 23, 1999 I General Contractor: DaI-Mac Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the High Iow grade beam between weight room and multi- following location: purpose building - Grade beam Grid J1-J11 - Multi- Purpose Building Time placement began: 12:24 Time placement ended: 4:30 Total cubic yards placed: 120 Slump range (inches): 4.5 - 5,0 Slump required (inches): 5.0 Concrete supplier and plant: Lattimore Concrete temperature range (°F): 64 - 66°F Strength required (psi/days): 3000/28 Number of cylinders made: 8 Superplasticizer used: No William Granger Fugro South Technician FUGRO SOUTH, INC. Reviewed By: SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford