SC-Coppell HS-LR 991215 --I; ,~....,~ FUGRO SOUTH, INC. i 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 STRUCTURAL STEEL INSPECTION REPORT CLIENT: Coppell lSD c/o DaI-Mac Construction Co. DATE: December 15, 1999 PROJECT: Coppell High School, High School Expansion PROJECT NO: 0791-2208 REPORT NO: 9 PAGE 1 Owner: Coppetl lSD Architect: SHW Group Engineer: SHW Group Contractor: DaI-Mac Construction Co. Fabricator: Alpha Industries Location of Project: Coppell, Texas Inspection Performed At: Job Site X Fabrication Shop DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on (Str I Steel - Metal Deck Units) or Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. See attached Field Reports for SDeciflc Items Insoected or Tested and T¥oe of Inspection or Teetina ~erformed Location of Inspection: See attached Figld reports for Specific Areas Inspected or Tested. Results of Inspection: Project Complete Project Incomplete Fabrication Is: Erection Is: X In Compliance X Non Compliance Note: Workmanship type deviations noted during Inspection, which are being corrected at time of Inspection. are not being listed on Report. NOTE: Inspection was performed to vedfy compliance to Project specifications, Contract Documents, Drawings, and Governing Codes} AWS. AISC, ASTM. SJL, ASNT, ANSI Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT) Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Doug Post STR-I I FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Datlas, Texas 7'5229 Ph (9'72) 4~,-8301; Fax (9?2) 620-7328 NON - COMPLIANCE REPORT CLIENT: Coppell lSD c/o Dal-Mac Construction Co. DATE: December 15, 1 ggg PROJECT: Coppell High School, High School Expansion PROJECT NO: 0791-2208 REPORT NO: 9 PAGE 2 Number Description Location Deviate Corrective Action Taken From 1 Mislocation of bolt holes Area A, 2nd level Drawings Beam connection, angles have on beam to column been welded @ (3) places to 11/9/99 connection, bolts could AM @ A5, A6 column flange. (No RFI) not be installed 2 Mislocation of anchor Area H G 10 @ Drawings Corrections have been made per bolts on column base GH, attachment C RFI III, except bolt spacing was 11/18/99 plate on RFI III moved 1 1/2 wider due to rebar C.I.P floor. Depth of holes are in compliance. New RFI has been submitted by DaI-Mac showing a change in bolt pattern width. NOTE: Architect and Engineer should advise on acceptability of all noted deviations Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT.-"Cert~fied Level 2 (UT. MT) STR-1 FUGRO :SOUTH, INC. , 2880 Virgo Lane; Dallas. Texas 75229 Ph (972)484-8301: Fax (972) 620-7328 FIELD ERECTION - MEMBERS INSPECTED or TESTED CLIENT:PROJECT: C:~/~l/ _~:<_L.1<,o* PROJECT NO: REPORT NO: PAGE ~ OF Type of Inspection Location I In Non Compliance Compliance Checx s~ze an~t P~olecaon of ~ ~lt C~ ~or Bolt Che~ Etlon ProCures Che~ for Oamag~ MemBem Check Weldem Qualifl~fion Re~s Che~ Rt-Up of Weld~ ~n~s Visual Quali~t of Welds o~ Misc S~I Vis~al Qua[i~ of We~s on Shear S~s ~ ~hec~ Si~ cf WelOS ~ S~I St~ Che~ Size of wet~s on Jmsm / Gi~em Che~ Size of Wel~s ~ Mlsc S~ Check Size of Welds on Pre Cast ~nn~on Check Size of We!ds on Composite / ~ ~ ~ C~ecx Size cf We~Cs on Shear S~ds I ;l~rascnic Testing of Weids ~ ~tag Panicle -es~ng of Welts ,~ ~ --~I ~ ~e~c~ ~anc .,/r;tte~ at ~e of ins;ecbon by Fie;d Ins~ec=cr ~ in box = I~ ccm;~ia~ca Recc~ ~11 3e sucm;t~eC as is and not ~;ed X ,n ~ox = NGn com~;~a~ce :, See Non =om;ha~ce S-~..2 Jt -:-'"" FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 !~h (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 15, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: December 7, 1999 J CONTRACTOR: Cortez Group TICKET NO.: 7080782 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 58 PLANT/TRUCK: 7 / 1045 CONCRETE TEMP. (°F) (ASTM C-1064): 71 MIX ID NUMBER: 16 TIME BATCHED: 3:30 p.m. AIR (%) {ASTM C-231): TIME SAMPLED: 4:20 p.m. WATER ADDED (gal): WEATHER CONDITION: Cool SLUMP (in.) (ASTM C-t43): 4-1/4 LOCATION OF PLACEMENT: Pier Nos. 159, 148 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 412 7 12-14-99 96000 3400 3000/28 days CHC 413 28 1-4-00 CHC 414 28 1-4-00 CHC 415 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ 0 ~-'~ r.--] curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. Reviewed By: ~. ~.g~l' ~ SMH/bg Distribution: Dal-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford