SC-Coppell HS-LR 991214FUGRO SOUTH, INC. ' ' 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 CONTRACTOR: The Cortez Group TICKET NO.: CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 55 PLANT/TRUCK: 3 CONCRETE TEMP. (°F) (ASTM C-10~4): 70.1 MIX ID NUMBER: 642 TIME BATCHED: 3:00 AIR (%) (ASTM C-231): 5.4 TIME SAMPLED: 3:45 WATER ADDED (gal): 15 WEATHER CONDITION: SLUMP (in.) {ASTM C-~43): 5 LOCATION OF PLACEMENT: Paved second floor at AN and Al0 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (pal) CHC 348 7 11/19/99 84000 2970 3000/28 days CHC 349 28 12/10/99 108000 3820 CHC 350 28 12/10/99 106000 3750 CHC 351 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~;~;I F~ r--~ r-] Cudng: Me{hods: ASTM C-39 Fracture: A[/XJ [/~ VI L_JB CD REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By: SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis ' Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. ' 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppetl High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 CONTRACTOR: The Cortez Group TICKET NO.: 3094807 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 55.1 PLANT/TRUCK: 3 CONCRETE TEMP. (°F) (ASTM C-1064): 70.1 MIX ID NUMBER: L42 TIME BATCHED: 3:21 AIR (%) (ASTM C-231): 5.4 TIME SAMPLED: 4:15 WATER ADDED (gal): 10 WEATHER CONDITION: SLUMP (in.) (ASTM C-143): 5 LOCATION OF PLACEMENT: Paved: Second floor at AP and A3 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYMNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 352 7 11/19/99 118000 4140 3000/28 days CHC 353 28 12/10/99 136000 4810 CHC 354 28 12/10/99 138000 4880 CHC 355 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ ~ [~] Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By: '~, ~ ~,,,~,-,,~ SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972} ,~84.8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 CONTRACTOR: The Cortez Group TICKET NO.: 3094814 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 55.1 PLANT/TRUCK: 3 CONCRETE TEMP. (°F) (ASTM C.10~4): 70.1 MIX ID NUMBER: L42 TIME BATCHED: 3:48 AIR (%) (ASTM C-23'1): 5 TIME SAMPLED: 4:15 WATER ADDED (gal): 10 WEATHER CONDITION: SLUMP (in.) (AS~ C.143): 5.5 LOCATION OF PLACEMENT: Paved second floor AH and A9 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYMNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 356 7 11/19/99 99000 3500 3000/28 days CHC 357 28 12/10/99 121000 4280 CHC 358 28 12/10/99 119000 4210 CHC 359 Hold Fracture mode is (A) unless othen~ise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By: "~, ~'~ ¢.,,~ ~.,~._... SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. ' ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) ,~84-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 CONTRACTOR: The Cortez Group TICKET NO.: 3094819 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 48.1 PLANT/TRUCK: 3 CONCRETE TEMP. (°F) (ASTM C-t064): 67.1 MIX ID NUMBER: L42 TIME BATCHED: 4:35 AIR (%) (ASTM C-231): 5.6 TIME SAMPLED: 5:20 WATER ADDED (gal): 0 WEATHER CONDITION: SLUMP (in.) (ASTM C-143): 5.5 LOCATION OF PLACEMENT: Paved second floor at AJ and A2 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYMNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 360 7 11/19/99 83000 2940 3000/28 days CHC 361 28 12/10/99 105000 3710 C HC 362 28 12/10/99 107000 3790 CHC 363 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof ~;~ r'~ ~-'~ i-"] curing: Methods: ASTM C-39 Fracture: A[/~J [~ [/~ L..JB C D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By: ~. "~ ~J~'~_..- SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 vir~;o Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 CONTRACTOR: The Cortez Group TICKET NO.: CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 48.1 PLANT/TRUCK: 3 CONCRETE TEMP. (°F) (ASTra C.10S4): 56.1 MIX ID NUMBER: L42 TIME BATCHED: 5:30 AIR (%) (ASTM C-231): 5.6 TIME SAMPLED: 6:20 WATER ADDED (gal): 0 WEATHER CONDITION: SLUMP (in.) (ASTM C.~43): 5 LOCATION OF PLACEMENT: Paved second floor at AE and A4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12', 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 364 7 11/19/99 102000 3610 3000/28 days CHC 365 28 12/10/99 123000 4350 CHC 366 28 12/10/99 121000 4280 CHC 367 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM 0-31 Testing ASTM C-143. Typesof ~;~ F'~ J-'~ [~ Curing: Methods: ASTM C-39 Fracture: A~"J [/~J ~J LaB c D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By: SMH/rm Distribution: Dal-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301' Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppell HiGh School, Coppe~l, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 CONTRACTOR: The Cortez Group TICKET NO.: 3094837 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 65.1 PLANT/TRUCK: 3/964 CONCRETE TEMP. (°F) (ASTM C.1064): 70.1 MIX ID NUMBER: L42 TIME BATCHED: 7:08 AIR (%) (ASTM C-23t): TIME SAMPLED: 8:00 WATER ADDED (gal): 5 WEATHER CONDITION: SLUMP (in.) (ASTM C-14~): 5 LOCATION OF PLACEMENT: Paved second floor at AA and A5 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 368 7 11/19/99 90000 3180 3000/28 days CHC 369 28 12/10/99 113000 3400 CHC 370 28 12/10/99 115000 4070 CHC 371 Hold Fracture mode is (A) unless otherwise noted Speciflcalions: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ~'] ~-'~ ~'--] Cudng: Methods: ASTM C-39 Fracture: A[/XJ VXJ ~_..J LiB c D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By: "'~' ~ SMH/rm Distribution: Dai-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. ~ 2880 Virgo Lane: Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 SPRAYED ON FIREPROOFING REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppell High School, HS Expansion, Coppell, Texas Project NO.: 0791-2208 DAILY ACTIVITY REPORT: December 9, 1999 Services Performed: Visual Inspection and Thickness Testing, ASTM E-605 Weather Conditions: Overcast/Cloudy Contractors on Site: Dal-Uac Remarks: Sprayed on Fireproofing Thickness Testing was performed at the above referenced project. Locations and results are listed below. Sample Type of Steel Location Measured Average Number Member Thickness Beam BM-B5 3/4 Column BM-B5 2 Beam BL-B3 7/8 Column BL-B3 1-3/4 Beam BM-AT 3/4 Column BM-AT 1-7/8 Beam BR-B4 3/4 Column BR-B4 1-3/4 SPECIFICATIONS Columns - 1-7/16 in. Beams - 5/8 in. No deficiencies were observed in the areas which had sprayed on fireproofing material applied. Test results comply with project specifications unless otherwise indicated. Mike Flute Fugro South Technician FUGRO SOUTH, INC. Reviewed By: -"~. ~ SMH/bg Distribution: DaI-Mac Construction - Dam,on Norman JRJ Paving - Jeff Williford City of Coppell - Larry Davis ~ SHW Group - Mike Elmore Coppell lSD - Mickey Harpe SHW Group - Joe Craddock FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppell High School, Coppell, Texas Project No,: 0791-2208 DATE PERFORMED: December 13, 1999 General Contractor: Beck Group Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Slab on Grade and Slab on Deck - Area "A" - Slab on following location: Grade - E.5 to F.6 Line and Line 2.5 to 3; Area "A" - Slab on Deck - RA to RB Line and Line R.1 to R.6 and R.11 to R.16; Area "D" - Slab on Deck from Col. Line F,7/9.4 to G.2/10.1 to G.3/9.8 to F.8/8.7 Time placement began: 10:00 a.m. Time placement ended: 3:30 p.m. Total cubic yards placed: 67 Slump range (inches): 4.0 - 5.0 Slump required (inches): 5.0 Concrete supplier and plant: Lattimore - Plant No. 6 Concrete temperature range (°F): 62 - 64°F Strength required (psi/days): 3000/28 Number of cylinders made: 5 Superplasticizer used: No Mark Strittmatter Fugro South Technician FUGRO SOUTH, INC. Reviewed By: SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. / 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 REINFORCING STEEL PLACEMENT OBSERVATION CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppell High School, Coppell, Texas Project NO.: 0791-2208 DATE PERFORMED: December 13, 1999 General Contractor: Beck Group Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: On the above sample date, a representative of Fugro South observed the reinforcing steel placed at the following location: · Area "A" - Slab on Grade - E.5 to F.6 Line and Line 2.5 to 3 · Area "A" - Level 2 - Slab on Deck - RA to RB Line and Line R.1 to R.6 and Line R.11 to R.16 Area "D" - Slab on Deck from Col. Line F.7/9.4 to G.2/10.1 to G.3/9.8 to F.8/8.7 The steel was checked for proper size, grade, quantity, vertical location, horizontal spacing, correctness of bends and splices, firmness and security of support and ties and clearances between reinforcement and forms. No discrepancies were noted this date. Mark Strittmatter Fugro South Technician FUGRO SOUTH, INC. Reviewed By: SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 SPRAYED ON FIREPROOFING REPORT CLIENT: Coppell lSD, cJo Dal- Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppell High School, HS Addition, Coppell, Texas Project No.: 0791-2208 Page 1 DAILY ACTIVITY REPORT: December 7,1999 Services Performed: Visual Inspection and Thickness Testing, ASTM E-605 Weather Conditions: Sunny Contractors on Site: DaI-Mac Remarks: Sprayed on Fireproofing Thickness Testing was performed at the above referenced project. Locations and results are listed below. Sample Type of Steel Location Measured Average Number Member Thickness AREA "A" Beam AB-A10 - 1st Floor 3/4 Column AB-A10 - 1st Floor 2 Beam AP-A5 - 1st Floor 5/8 Column AP-A5 - 1st Floor 1-3/4 Beam AB-A5 - 1st Floor 7/8 Column AB-A5 - 1st Floor 1-1/2 Beam AF-A5 - 1st Floor 5/8 Column AF-A5 - 1st Floor 1-1/2 Beam AP-A10 - 1st Floor 5i8 Column AP-A10 - 1st Floor 1-3/4 Beam A J-A1 - 1st Floor 3/4 Column A J-A1 - 1st Floor 1-7/8 MINIMUM REQUIREMENT Beam 5/8 Column - 1-7/16 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 SPRAYED ON FIREPROOFING REPORT CLIENT: Coppetl lSD, c/o Dal- Mac Construction Co. Report Date: December 14, 1999 PROJECT: Coppell High School, HS Addition Project No.: 0791-2208 Coppell, Texas Page 2 DAILY ACTIVITY REPORT: December 7,199e ~ Services Performed: Visual Inspection and Thickness ! Densit7 Testing, ASTM E-605 Weather Conditions: Sunny Contractors on Site: DaI-Mac Remarks: Sprayed on Fireproofing Thickness Testing was performed at the above referenced project. Locations and results are listed below. No deficiencies were observed in the areas which had sprayed on fireproofing material applied. All test results comply with project specifications unless otherwise indicated. Mike Flute Fugro South Technician FUGRO SOUTH, INC, Reviewed By: ~ · "~-~¢~, ~ SMH/bg Distribution: DaI-Mac Construction - Damon Norman JRJ Paving - Jeff Williford City of Coppell - Larry Davis SHW Group - Mike Elmore Coppell lSD - Mickey Harpe SHW Group - Joe Craddock