SC-Coppell HS-LR 991213FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: December 13, 1999
PROJECT: Coppell High School, CoppelI, Texas Project No.: 0791-2208
SAMPLE DATE: November 10, 1999
CONTRACTOR: Dal Mac
TICKET NO.: 7079736 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 87 PLANT/TRUCK: 7/959
CONCRETE TEMP. (°F) (ASTM C-10~4): 97 MIX ID NUMBER: 16
TIME BATCHED: 1:13 pm AIR (%) (ASTM C-231):
TIME SAMPLED: 1:45 pm WATER ADDED (gal): 10
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C.'143): 5
LOCATION OF PLACEMENT: Grade beams all in Area E
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square Inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 341 7 11/17/99 98000 3470 3000/28 days
CHC 342 28 12/08/99 123000 4350
CHC 343 28 12/08/99 125000 4420
CHC 344 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143. Types°f [Z] ~ ~ E~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: William Granger FUGRO SOUTH INC.
Reviewed By: ~'~1~. -~_..,,..,~...,..__
SMH/rm
Distribution: DaI-Mac Construction - Dam~n Norman
City of Coppell - Larry Davis/
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 13, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: November 10, 1999
CONTRACTOR: Dal Mac
TICKET NO.: 7079747 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 82 PLANT/TRUCK: 7/757
CONCRETE TEMP. (°F) (ASTU C-1064): 74 MIX ID NUMBER: 16
TIME BATCHED: 2:54 pm AIR (%) (As?u c.231):
TIME SAMPLED: 3:47 pm WATER ADDED (gal): 10
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 4.5
LOCATION OF PLACEMENT: Area F exterior grade beams
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 345 7 11/17/99 108000 3820 3000/28 days
CHC 346 28 12/08/99 128000 4530
CHC 347 28 12/08/99 126000 4460
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTMC-31 Testing ASTM C-143, Typesof [~] ~ ~ [~
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: William Granger FUGRO SOUTH INC.
Reviewed By: -~'
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-6301; Fax (972) 620-7328
DRILLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 13, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
DRILLING CONTRACTOR: Street Foundation Page 1
DATE PERFORMED: December 10, 1999
Location: Drilled Piers
Depth
Shaft to Plan Actual Total
Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing
Number in. Material tion ft. tion ft. ft. Alignment Present¢} Used Remarks
ff.
69 18 4.2 9.0 9.3 13.5 Yes Yes Yes
68 18 4.2 8.0 8.3 12.5 Yes Yes Yes
67 18 4.3 8.0 8.0 12.3 Yes Yes Yes
163 18 4.0 6.0 7.0 11.0 Yes Yes Yes
158 18 4.2 8.0 8.4 12.6 Yes Yes Yes
154 18 4.4 8.0 8.2 12.6 Yes Yes Yes
150 18 6.5 8.0 8.2 14.7 Yes Yes Yes
13 24 7.5 6.0 6.2 13.7 Yes Yes Yes
48 24 4.3 6.0 6.5 10.8 Yes Yes Yes
46 30 4.5 10.0 10.0 14.5 Yes Yes Yes
44 30 4.3 10.0 10.2 14.5 Yes No No
42 30 5.0 10.0 10.1 15.1 Yes No No
40 30 5.5 10.0 10.2 15.7 Yes No No
38 30 5.0 10.0 10.1 15.1 Yes No No
49 30 1.5 10.0 10.1 11.6 Yes No No
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
DRILLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 13, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
DRILLING CONTRACTOR: Street Foundation Page 2
DATE PERFORMED: December 10, 1999
Location: Drilled Piers
Depth
Shaft to Plan Actual Total
Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing
Number in. Material tion ft. tion ft. ft. Alignment Present(~) Used Remarks
fl.
127 18 2.0 4.0 4.7 6.7 Yes No No
Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Bearing Material: Gray Shale
(~) During ddlling operations; however, piers were dry prior to placement of concrete.
Thomas Cranford
Fugro Technician FUGRO SOUTH INC.
Reviewed By: '~'"~. "~.~_,~'.z-.-~ ,
SMH/bg
Distribution: Dal-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
STRUCTURAL STEEL INSPECTION REPORT
CLIENT: Coppell lSD c/o DaI-Mac Construction Co. DATE: December 13, 1999
PROJECT: Coppell High School, High School Expansion PROJECT NO: 0791-2208
REPORT NO: 8 PAGE 1
Owner: Coppell lSD
Architect: SHW Group
Engineer: SHW Group
Contractor: DaI-Mac Construction Co.
Fabricator: Alpha Industries
Location of Project: Coppell, Texas
Inspection Performed At: Job Site X Fabrication Shop
DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on (Str I Steel - Metal Deck Units) or
Ultrasonic Tasting or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project
specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI.
See attached Field Reports for $oe~iflc Items Inspected or Tested and Tv~e of Insoectlon or Testlno oerformed
Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested.
Results of Inspection: Project Complete Project Incomplete
Fabrication Is:
Erection Is: X
In Compliance X
Non Compliance ~
Note: Workmanship type deviations noted dudng Inspection. which are being corrected at time of Inspection, are not being listed on Report.
NOTE: Inspection was performed to vedfy compliance to Project specifications, Contract Documents, Drawings, and Governing
Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI
Inspected By: Doug Post, AWS/Certified Welding Inspector. ASNT/Certified Level 2 (UT, MT)
Distribution: Pal-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
Doug Post
STR-1
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
NON - COMPLIANCE REPORT
CLIENT: Coppell lSD c/o DaI-Mac Construction Co. DATE: December 13, 1999
PROJECT: Coppell High School, High School Expansion PROJECT NO: 0791-2208
REPORT NO: 8 PAGE 2
Number Description Location Deviate Corrective Action Taken
From
1 Mislocation of bolt holes Area A, 2nd level Drawings Beam connection, angles have
on beam to column been welded @ (3) places to
1 1/9/99 connection, bolts could AM @ A5, A6 column flange. (No RFI)
not be installed
2 Misiocation of anchor Area H G 10 @ Drawings Corrections have been made per
bolts on column base CH, attachment C RFI III, except bolt spacing was
11/18/99 plate on RFI III moved 1 1/2 wider due to rebar in
C.I.P floor. Depth of holes are in
compliance. New RFI has been
submitted by DaI-Mac showing a
change in bolt pattern width.
NOTE: Architect and Engineer should advise on acceptability of all noted deviations
Inspected By: Doug Post, AWS,'Certified Welding Inspector. ASNT.-"Certified Level 2 (,.,IT. MT)
STR-I
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 4848301; Fax (972) 620,7328
FIELD ERECTION - MEMBERS INSPECTED or TESTED
CLIENT: (/~'_ ,o/,~/~c-// /.,-~. _~. DATE:
REPoRTPROJECT:No: ~?~f?~¢// ~'/'CCH "~Cc'~'<°° c' PAGEPROJECT~NO:oF
of Inspection I Location In Non
Type
I
Compliance Compliance
Check s~ze an(3 Projection of Ancl~or ~olt
I
Check Anct~or Bolt Group
Check NutS on Anchor BoltS i Tight
Check Erection Procedures
Check fOr Damaged Members
Check Welders Qualification Records - I
Check Fit-Up of Welded Connections
I
Visual Quality of Welds on Structural Steel ~ /~',1~ ~ D~' ' 0/4//.~, ' /.,3 4-'
Visual Quality of Welds on Joists ." Girders
Visual Quality of Welds on Misc Steel
Visual Quatity of Welds on Pre Cast Connection
Visual Quality of Welds on Composite Deck
Visual Quality of Welds on Roof Deck
Visual Quality of Welts on Shear Studs
Check Size of Welds on Structural Steel / /
Check Size of Welds on Joists; Girders I /
Check Size of Welds on Misc Steel
Check Size of Welds on Pre Cast Connection
Chec~ Size gl: Wetds on Composite / Roof Deck
Check Size of Welcls c,n Shear Stucs
Ultrasonic Testing of Welds ~'~,
,%lag Particle Testing of Welds
P,e=ort .",an~t written at time of inspection b? Field Inspector ~' in 3ex = In compiiance
~epo.~, ~v~ll 3e submiEed as is and not ~ped X :n box = Non compt;ance .'., See NO~ :c.---;~ia~;a 'e:c-'.
Inspec".eC By: DOUg Post. AWS~Cert:~e3 We;drag :ns;ec:;r. AS;qT-'Ce~ifed .e':ei 2. :'jT. '.!-,
S-R.2
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
DRILLED PIER OBSERVATION REPORT
REVISED
CLIENT: Coppell lSD, c/o Oal - Mac Construction Co. Report Date: December 13, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
DRILLING CONTRACTOR: Street Foundation Page 1
I DATE PERFORMED: December 10, 1999 I
Location: Drilled Piers Multi Purpose Building
Depth
Shaft to Plan Actual Total
Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing
Number in. Material tion ft. tion ft. ft. Alignment Present(~) Used Remarks
ft.
69 18 4.2 9.0 9.3 13.5 Yes Yes Yes
68 18 4.2 8.0 8.3 12.5 Yes Yes Yes
67 18 4.3 8.0 8.0 12.3 Yes Yes Yes
163 18 4.0 6.0 7.0 11.0 Yes Yes Yes
158 18 4.2 8.0 8.4 12.6 Yes Yes Yes
154 18 4.4 8.0 8.2 12.6 Yes Yes Yes
150 18 6.5 8.0 8.2 14.7 Yes Yes Yes
13 24 7.5 6.0 6.2 13.7 Yes Yes Yes
48 24 4.3 6.0 6.5 10.8 Yes Yes Yes
46 30 4.5 10.0 10.0 14.5 Yes Yes Yes
I
44 30 4.3 10.0 10.2 14.5 Yes No No
42 30 5.0 10.0 10.1 15.1 Yes No No
40 30 5.5 10.0 10.2 15.7 Yes No No
38 30 5.0 10.0 10.1 15.1 Yes No No
49 30 1.5 10.0 10.1 11.6 Yes No No
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
DRILLED PIER OBSERVATION REPORT
REVISED
CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: December 13, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
DRILLING CONTRACTOR: Street Foundation Page 2
DATE PERFORMED: December 10, 1999
Location: Drilled Piers - Multi Purpose Building
Depth
Shaft to Plan Actual Total
Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing
Number in. Material tion ft. tion ft. ft. Alignment Present¢~} Used Remarks
ff.
127 18 2.0 4.0 4.7 6.7 Yes No No
Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Bearing Material: Gray Shale
m During drilling operations; however, piers were dry prior to placement of concrete.
Revised to clarify location as Multi-Purpose Building
Thomas Cranford
Fugro Technician FUGRO SOUTH INC.
Reviewed By: ~,, .~'z~,.,~.~._,
SMH/bg
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford