SC-Coppell HS-LR 991206FUGRO SOUTH, INC. M 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 6, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 5, 1999 CONTRACTOR: GDM Construction TICKET NO.: 7079559 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 76 PLANT/TRUCK: 7/1040 CONCRETE TEMP. (°F) (ASTM C.1064): 78 MIX ID NUMBER: TIME BATCHED: 12:40 AIR (%) (ASTM C-231) .' TIME SAMPLED: 1:30 WATER ADDED (gal): 0 WEATHER CONDITION: Partly cloudy SLUMP (in.) (ASTM C-143): co LOCATION OF PLACEMENT: Walkway between old and new building at 10 feet west, 20 feet north of southwest corner of old building, CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 337 7 11/12/99 97000 3430 3000/28 days CHC 338 28 12/03/99 120000 4240 CHC 339 28 12/03/99 118000 4170 CHC 340 Hold Fracture mode is (A) unless otheneise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ~r'~ i--/I [-'1 curing: Methods: AS'tM C-39 Fracture: A[/XJ [~ [/'~ [_JB C D REMARKS: Technician: John Gipson FUGRO SOUTH INC. Reviewed By: ,,- / -- SMH/rm Distribution: DaI-Mac Construction - Damjon Norman City of Coppell - Larry Davis-- Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 6, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 DRILLING CONTRACTOR: Street Foundation Page 2 DATE PERFORMED: December 2, 1999 Location: Drilled Piers " DePth ~: . ': " '~ Shaft '~ ..~. *Plan Actual Total' . Pier Diameter Bearing · Pe~etra- Pene~tra- ' I:~th': .-~ Proper Water Casing Number in. Mac,rial ~ tion fL tionft...' .. '~,.:'=i'~ ::'-".AUgnment .' Present{~! Used Remarks 121 24 2.5 9.0 9.0 11.5 Yes No No N-19 120 24 3.0 9.0 9.0 12.0 Yes No No L-19 118 24 2.5 10.0 10.0 12.5 Yes No No H-19 117 24 3.0 10.0 10.0 13.0 Yes No No G-19 Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Matedah Gray Shale m Dudng ddlling operations; however, piers were dry prior to placement of concrete. Thomas Cranford Fugro Technician FUGRO SOUTH INC. Reviewed By: '---'~- SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis/ Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 6, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 DRILLING CONTRACTOR: Street Foundation Page 1 DATE PERFORMED: December 2, 1999 Location: Drilled Piers Pier : ' Sh~ft '; ~ 'D~Pth'' ! ' Plan=il-'i:, '"Actual!I*'II Total. ~ ='' '" J.::.:...l~oper ' Water Casing Remarks Number D!am..'.eter : - .;to. ": ,- ..!' Pehef:ra;. .., .... ~-. Pe~- :. Depth. '~"iJ.lgnment Presentis) Used in.'-*-..: ~/~q]' Uon'fL. ~,:.tionfL.::-,.:':~: :'.:'::.--'-- 122 24 4.4 8.0 8.2 12.6 Yes No No R-19 110 24 4.7 10.0 10.0 14.7 Yes No No 1:[-18 98 24 4.0 10.0 10.3 14.3 Yes No No R-17 73 30 3.5 7.0 7.4 10.9 Yes Yes Yes R-15 72 30 4.4 5.0 6.4 10.8 Yes Yes Yes N-15 71 30 3.5 5.0 6.5 10.0 Yes Yes No M.8-15 70 30 3.5 4.0 4.3 7.8 Yes No No K-15 08 30 3.1 12.0 12.3 15.4 Yes No No J-15 07 30 2.4 9.0 9.4 11.8 Yes No No G-15 06 30 3.7 9.0 9.1 12.8 Yes No No F-15 05 30 3.0 9.0 9.3 12.3 Yes No No E-15 04 30 2.8 9.0 9.0 11.8 Yes No No D-15 03 30 3.0 9.0 9.1 12.1 Yes No No C-15 57 30 3.0 9.0 9.0 12.0 Yes No No B-15 56 30 2.7 11.0 11.1 13.8 Yes No No A-15 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 6, 1999 PROJECT: Coppeil High School, Coppell, Texas Project No.: 0791-2208 DRILLING CONTRACTOR: Street Foundation Page 1 DATE PERFORMED: December 3, 1999 Location: Drilled Piers 'Depth ' ' Shaft to Plan Actual Total · ~ Pier Diameter : Bearing :.-Penetra- penetra- · Depth . :...:.::..P!:o. per Water Casing Number · in.:i. 'Material tlon ft. -tlon ft.. ~ ...fL %N!.,..g me. ntpresent~). ' ' Used Remarks 116 24 2.5 10.0 10.0 12.5 Yes No No F-19 115 24 2.0 10.0 10.3 12.3 Yes No No E-19 114 24 2.5 10.0 10.2 12.7 Yes Yes Yes D-19 113 24 3.5 10.0 10.3 13.8 Yes No No C-19 112 24 2.5 10.0 10.3 12.8 Yes Yes Yes B-19 111 24 3.0 8.0 8.3 11.3 Yes Yes Yes A-19 109 18 3.0 8.0 8.8 11.8 Yes No No H-18 108 18 3.0 8.0 8.3 11.3 Yes No No M.8-18 107 18 3.3 8.0 8.5 11.8 Yes No No K-18 106 18 3.5 9.0 9.0 12.5 Yes No No J-18 105 18 3.8 10.0 10.2 14.0 Yes Yes Yes G-18 104 18 2.5 10.0 10.1 12.6 Yes Yes Yes F-18 103 18 2.8 10.0 10.7 13.5 Yes No No E-18 102 18 2.5 10.0 10.0 12.5 Yes Yes Yes D-18 101 18 3.0 10.0 10.4 13.4 Yes No No C-18 100 18 2.5 10.0 10.4 12.9 Yes Yes Yes B-18 99 18 2.0 11.0 11.3 13.3 Yes Yes Yes A-18 97 18 3.0 9.0 9.0 12.0 Yes No No N-17.3 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD. c/o Dal- Mac Construction Co. Report Date: December 6, 1999 PROJECT: Coppell High School, Coppell. Texas Project No.: 0791-2208 DRILLING CONTRACTOR: Street Foundation Page 2 DATE PERFORMED: December 3, 1999 Location: DH#ed Piers Shaft to Plan Actual Total Pier Diameter · Bearing ~ Penatra- Penetra- . Depth Proper Water Casing Number in, ~,' :...Material. tlonfL !- tionfL .'fL Alignment ' Present~) Used Remarks~ 96 18 3.0 6.0 7.8 10.8 Yes No No M-17.5 95 18 3.0 9.0 9.3 12.3 Yes No No M.8-17 94 18 3.0 8.0 9.3 12.3 Yes No No K-17 93 18 3.0 9.0 9.0 12.0 Yes No No J-17 Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Share (4) During drilling operations; however, piers were dry prior to placement of concrete. Thomas Cranford Fugro Technician FUGRO SOUTH INC. Reviewed By: '~'~, '~'-~.~ SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 virgo Lane; Dallas. Texas ?5229 Ph (9?2) 484-8301; Fax (972) 820-7328 DRILLED PIER OBSERVATION REPORT REVISED CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 6, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 DRILLING CONTRACTOR: Street Foundation Page 1 DATE PERFORMED: December 2, 1999 Location: Drilled Piers - Multi Purpose Building Pier Shaft Depth Plan Actual Total Proper Water Casing Remarks Number Diameter to Penetra- Penetra- Depth Alignment Present(~} Used In. Bearing tion ft. tion ft. ft. Material ff. 122 24 4.4 8.0 8.2 12.6 Yes No No R-19 110 24 4.7 10.0 10.0 14.7 Yes No No R-18 98 24 4.0 10.0 10.3 14.3 Yes No No R-17 73 30 3.5 7.0 7.4 10.9 Yes Yes Yes R-15 72 30 4.4 5.0 6.4 10.8 Yes Yes Yes N-15 71 30 3.5 5.0 6.5 10.0 Yes Yes No M.8-15 70 30 3.5 4.0 4.3 7.8 Yes No No K-15 08 30 3.1 12.0 12.3 15.4 Yes No No J-15 07 30 2.4 9.0 9.4 11.8 Yes No No G-15 06 30 3.7 9.0 9.1 12.8 Yes No No F-15 05 30 3.0 9.0 9.3 12.3 Yes No No E-15 04 30 2.8 9.0 9.0 11.8 Yes No No D-15 03 30 3.0 9.0 9.1 12.1 Yes No No C-15 57 30 3.0 9.0 9.0 12.0 Yes No No B-15 56 30 2.7 11.0 11.1 13.8 Yes No No A-15 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT REVISED CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 6, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 DRILLING CONTRACTOR: Street Foundation Page 2 I DATE PERFORMED: December 2, 1999 Location: Drilled Piers - Multi Purpose Building Depth Shaft to Plan Actual Total Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing Number in. Material tion ft. tion ft. ft. Alignment Present(~) Used Remarks ft. 121 24 2.5 9.0 9.0 11.5 Yes No No N-19 120 24 3.0 9.0 9.0 12.0 Yes No No L-19 118 24 2.5 10.0 10.0 12.5 Yes No No H-19 117 24 3.0 10.0 10.0 13.0 Yes No No G-19 Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Shale m During drilling operations; however, piers were dry prior to placement of concrete. Revised to clarify location as Multi-Purpose Building Thomas Cranford Fugro Technician FUGRO SOUTH INC. Reviewed By: -'"'~. ~-~~ SMH/bg Distribution: DaI-Mac Construction- Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT REVISED CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 6, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 DRILLING CONTRACTOR: Street Foundation Page 1 I DATE PERFORMED: December 3, 1999 Location: Drilled Piers - Multi Purpose Building Depth Shaft to Plan Actual Total Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing Number in. Material tion ft. tion ft. ft. Alignment Present(~) Used Remarks ft. 116 24 2.5 10.0 10.0 12.5 Yes No No F-19 115 24 2.0 10.0 10.3 12.3 Yes No No E-19 114 24 2.5 10.0 10.2 12.7 Yes Yes Yes D-19 113 24 3.5 10.0 10.3 13.8 Yes No No C-19 112 24 2.5 10.0 10.3 12.8 Yes Yes Yes B-19 111 24 3.0 8.0 8.3 11.3 Yes Yes Yes A-19 109 18 3.0 8.0 8.8 11.8 Yes No No H-18 108 18 3.0 8.0 8.3 11.3 Yes No No M.8-18 107 18 3.3 8.0 8.5 11.8 Yes No No K-18 106 18 3.5 9.0 9.0 12.5 Yes No No J-18 105 18 3.8 10.0 10.2 14.0 Yes Yes Yes G-18 104 18 2.5 10.0 10.1 12.6 Yes Yes Yes F-18 103 18 2.8 10.0 10.7 13.5 Yes No No E-18 102 18 2.5 10.0 10.0 12.5 Yes Yes Yes D-18 101 18 3.0 10.0 10.4 13.4 Yes No No C-18 100 18 2.5 10.0 10.4 12.9 Yes Yes Yes B-18 99 18 2.0 11.0 11.3 13.3 Yes Yes Yes A-18 97 18 3.0 9.0 9.0 12.0 Yes No No N-17.3 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT REVISED CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: December 6, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 DRILLING CONTRACTOR: Street Foundation Page 2 DATE PERFORMED: December 3, 1999 Location: Drilled Piers - Multi Purpose Building Depth Shaft to Plan Actual Total Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing Number in. Material tion ft. tion ft. ft, Alignment Present(i) Used Remarks ft. 96 18 3.0 6.0 7.8 10.8 Yes No No M-17.5 95 18 3.0 9.0 9.3 12.3 Yes No No M.8-17 94 18 3.0 8.0 9.3 12.3 Yes No No K-17 93 18 3.0 9.0 9.0 12.0 Yes No No J-17 Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Shale (~) Dudng drilling operations; however, piers were dry prior to placement of concretel Revised to clarify location as Multi-Purpose Building Thomas Cranford Fugro Technician FUGRO SOUTH INC, Reviewed By: ~1~. ,,~¢,~_ SMH/bg Distribution: DaI-Mac Construction- Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford