Loading...
SC-Coppell HS-LR 991203FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 NON - COMPLIANCE REPORT CLIENT: Coppell lSD c/o Dal - Mac DATE: December 3, 1999 PROJECT: Coppell High School PROJECT NO: 0791-2208 REPORT NO: 6 PAGE 2 Number Description Location Deviate Corrective Action Taken From I Mislocation of bolt holes Area A, 2nd level Drawings Beam connection, angles have on beam to column been welded @ (3) places to 1 1/9/99 connection, bolts could AM (t~ A5, A6 column flange. (No RFI) not be installed 2 Mislocation of anchor Area H G 10 @ Drawings Corrections have been made per bolts on column base GH, attachment C RFI III, except bolt spacing was 11/18/99 plate on RFI III moved I 1/2 wider due to rebar in C.I.P floor. Depth of holes are in compliance. New RFI has been submitted by DaI-Mac showing a ~ change in bolt pattern width. NOTE: Architect and Engineer should advise on acceptability of all noted deviations Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level :2 (UT. MT) $ TR - ~