Loading...
SC-Coppell HS-LR 991123FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 23, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 CONTRACTOR: The Cortez Group TICKET NO.: 3094837 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 65.1 PLANT/TRUCK: 3/964 CONCRETE TEMP. (°F) (ASTM C-1064): 70.1 MIX ID NUMBER: L42 TIME BATCHED: 7:08 AIR (%) (ASTM C-231) '. TIME SAMPLED: 8:00 WATER ADDED (gal): 5 WEATHER CONDITION: SLUMP (in.) CASTM C-143): 5 LOCATION OF PLACEMENT: second floor at AA and A5 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 368 7 11/19/99 90000 3180 3000/28 days CHC 369 28 12/10/99 CHC 370 28 12/10/99 CHC 371 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof [~ [~ ~] ~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By: ~--~ SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: November 23, 1999 PROJECT: Coppell High School, Coppell, Texas Project NO.: 0791-2208 SAMPLE DATE: November 12, 1999 I CONTRACTOR: The Cortez Group TICKET NO.: CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 48.1 PLANT/TRUCK: 3 CONCRETE TEMP. (°F) (ASTM C-1064): 56.1 MIX ID NUMBER: L42 TIME BATCHED: 5:30 AIR (%) (ASTM C-231): 5.6 TIME SAMPLED: 6:20 WATER ADDED (gal): 0 WEATHER CONDITION: SLUMP (in.) (ASTM C-143): 5 LOCATION OF PLACEMENT: second floor at AE and A4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 364 7 11/19/99 102000 3610 3000/28 days CHC 365 28 12/10/99 CHC 366 28 12/10/99 CHC 367 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~'1 Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By: ,,~ ~ ~ SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c. Jo Dal - Mac Construction Co. Report Date: November 23, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 CONTRACTOR: The Cortez Group TICKET NO.: 3094819 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 48.1 PLANT/TRUCK: 3 CONCRETE TEMP. (°F) (ASTM C-1064): 67.1 MIX ID NUMBER: L42 TIME BATCHED: 4:35 AIR (%) (ASTM C-231): 5.6 TIME SAMPLED: 5:20 WATER ADDED (gal): 0 WEATHER CONDITION: SLUMP (in.) (AS?M C-143): 5.5 LOCATION OF PLACEMENT: second floor at AJ and A2 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 360 7 11/19/99 83000 2940 3000/28 days CHC 361 28 12/10/99 CHC 362 28 12/10/99 CHC 363 Hold ] Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~ [~ [-'1 Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. ! Reviewed By: - / SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 23, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 CONTRACTOR: The Cortez Group TICKET NO.: 3094814 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 55.1 PLANT/TRUCK: 3 CONCRETE TEMP. (°F) (ASTM C-1064): 70.1 MIX ID NUMBER: L42 TIME BATCHED: 3:48 AIR (%) (ASTM C-231) '. 5 TIME SAMPLED: 4:15 WATER ADDED (gal): 10 WEATHER CONDITION: SLUMP (in.) (ASTM C-143): 5.5 LOCATION OF PLACEMENT: second floor AH and ^9 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 356 7 11/19/99 99000 3500 3000/28 days CHC 357 28 12/10/99 CHC 358 28 12/10/99 CHC 359 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof [~ [~] 0 ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By:,,.,~ I SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 23, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 I CONTRACTOR: The Cortez Group TICKET NO.: 3094807 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 55.1 PLANT/TRUCK: 3 CONCRETE TEMP. (°F) (ASTM C-1084): 70.1 MIX ID NUMBER: L42 TIME BATCHED: 3:21 AIR (%) (ASTM C-231): 5.4 TIME SAMPLED: 4:15 WATER ADDED (gal): 10 WEATHER CONDITION: SLUMP (in.) (ASTM C-143): 5 LOCATION OF PLACEMENT: Second floor at AP and A3 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 352 7 11/19/99 118000 4140 3000/28 days CHC 353 28 12/10/99 CHC 354 28 12110/99 CHC 355 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~ [~ D Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By: -~ J SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. i 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: November 23, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: November 12, 1999 CONTRACTOR: The Cortez Group TICKET NO.: CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 55 PLANT/TRUCK: 3 CONCRETE TEMP. (°F) (ASTM C-1064): 70.1 MIX ID NUMBER: 642 TIME BATCHED: 3:00 AIR (%) (ASTM C-231): 5.~, TIME SAMPLED: 3:45 WATER ADDED (gal): 15 WEATHER CONDITION: SLUMP (in.) (ASTM C-143): 5 LOCATION OF PLACEMENT: second floor at AN and Al0 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 348 7 11/19/99 84000 2970 3000/28 days CHC 349 28 12/10/99 CHC 350 28 12/10/99 CHC 351 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f [~ [~] E~] E~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Julio Perez FUGRO SOUTH INC. Reviewed By: ~'- i _ SMH/rm Distribution: Del-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford