SC-Coppell HS-LR 991123FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 23, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: November 12, 1999
CONTRACTOR: The Cortez Group
TICKET NO.: 3094837 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 65.1 PLANT/TRUCK: 3/964
CONCRETE TEMP. (°F) (ASTM C-1064): 70.1 MIX ID NUMBER: L42
TIME BATCHED: 7:08 AIR (%) (ASTM C-231) '.
TIME SAMPLED: 8:00 WATER ADDED (gal): 5
WEATHER CONDITION: SLUMP (in.) CASTM C-143): 5
LOCATION OF PLACEMENT: second floor at AA and A5
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 368 7 11/19/99 90000 3180 3000/28 days
CHC 369 28 12/10/99
CHC 370 28 12/10/99
CHC 371 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof [~ [~ ~] ~
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Julio Perez FUGRO SOUTH INC.
Reviewed By: ~--~
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: November 23, 1999
PROJECT: Coppell High School, Coppell, Texas Project NO.: 0791-2208
SAMPLE DATE: November 12, 1999 I
CONTRACTOR: The Cortez Group
TICKET NO.: CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 48.1 PLANT/TRUCK: 3
CONCRETE TEMP. (°F) (ASTM C-1064): 56.1 MIX ID NUMBER: L42
TIME BATCHED: 5:30 AIR (%) (ASTM C-231): 5.6
TIME SAMPLED: 6:20 WATER ADDED (gal): 0
WEATHER CONDITION: SLUMP (in.) (ASTM C-143): 5
LOCATION OF PLACEMENT: second floor at AE and A4
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square Inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 364 7 11/19/99 102000 3610 3000/28 days
CHC 365 28 12/10/99
CHC 366 28 12/10/99
CHC 367 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~'1
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Julio Perez FUGRO SOUTH INC.
Reviewed By: ,,~ ~ ~
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c. Jo Dal - Mac Construction Co. Report Date: November 23, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: November 12, 1999
CONTRACTOR: The Cortez Group
TICKET NO.: 3094819 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 48.1 PLANT/TRUCK: 3
CONCRETE TEMP. (°F) (ASTM C-1064): 67.1 MIX ID NUMBER: L42
TIME BATCHED: 4:35 AIR (%) (ASTM C-231): 5.6
TIME SAMPLED: 5:20 WATER ADDED (gal): 0
WEATHER CONDITION: SLUMP (in.) (AS?M C-143): 5.5
LOCATION OF PLACEMENT: second floor at AJ and A2
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 360 7 11/19/99 83000 2940 3000/28 days
CHC 361 28 12/10/99
CHC 362 28 12/10/99
CHC 363 Hold ]
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~ [~ [-'1
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Julio Perez FUGRO SOUTH INC.
!
Reviewed By: - /
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 23, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: November 12, 1999
CONTRACTOR: The Cortez Group
TICKET NO.: 3094814 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 55.1 PLANT/TRUCK: 3
CONCRETE TEMP. (°F) (ASTM C-1064): 70.1 MIX ID NUMBER: L42
TIME BATCHED: 3:48 AIR (%) (ASTM C-231) '. 5
TIME SAMPLED: 4:15 WATER ADDED (gal): 10
WEATHER CONDITION: SLUMP (in.) (ASTM C-143): 5.5
LOCATION OF PLACEMENT: second floor AH and ^9
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 356 7 11/19/99 99000 3500 3000/28 days
CHC 357 28 12/10/99
CHC 358 28 12/10/99
CHC 359 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof [~ [~] 0 ~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Julio Perez FUGRO SOUTH INC.
Reviewed By:,,.,~ I
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 23, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: November 12, 1999 I
CONTRACTOR: The Cortez Group
TICKET NO.: 3094807 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 55.1 PLANT/TRUCK: 3
CONCRETE TEMP. (°F) (ASTM C-1084): 70.1 MIX ID NUMBER: L42
TIME BATCHED: 3:21 AIR (%) (ASTM C-231): 5.4
TIME SAMPLED: 4:15 WATER ADDED (gal): 10
WEATHER CONDITION: SLUMP (in.) (ASTM C-143): 5
LOCATION OF PLACEMENT: Second floor at AP and A3
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 352 7 11/19/99 118000 4140 3000/28 days
CHC 353 28 12/10/99
CHC 354 28 12110/99
CHC 355 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~ [~ D
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Julio Perez FUGRO SOUTH INC.
Reviewed By: -~ J
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. i
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: November 23, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: November 12, 1999
CONTRACTOR: The Cortez Group
TICKET NO.: CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 55 PLANT/TRUCK: 3
CONCRETE TEMP. (°F) (ASTM C-1064): 70.1 MIX ID NUMBER: 642
TIME BATCHED: 3:00 AIR (%) (ASTM C-231): 5.~,
TIME SAMPLED: 3:45 WATER ADDED (gal): 15
WEATHER CONDITION: SLUMP (in.) (ASTM C-143): 5
LOCATION OF PLACEMENT: second floor at AN and Al0
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 348 7 11/19/99 84000 2970 3000/28 days
CHC 349 28 12/10/99
CHC 350 28 12/10/99
CHC 351 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f [~ [~] E~] E~
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Julio Perez FUGRO SOUTH INC.
Reviewed By: ~'- i _
SMH/rm
Distribution: Del-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford