SC-Coppell HS-LR 991122FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7326 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 22, 1999 PROJECT: Coppell High School, Coppell, Texas Project NO.: 0791-2208 DATE PERFORMED: November 18, 1999 I General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Parking Area on east side of Band Hall following location: Time placement began: 9:00 a.m. Time placement ended: 3:00 p.m. Total cubic yards placed: 200 Slump range (inches): 3.0 Slump required (inches): 5.5 Concrete supplier and plant: Lattimore - Plant No. 16 Concrete temperature range (°F): 75 - 80°F Strength required (psi/days): 3000/28 Number of cylinders made: 8 Superplasticizer used: No Greg Forsythe Fugro South Technician FUGRO SOUTH, INC. Reviewed By: ~""-~. SMH/bg Distribution: Dal-Mac Construction - Damo/n Norman City of Coppell - Larry Davis [ Coppell lSD - Miokey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. : ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 REINFORCING STEEL PLACEMENT OBSERVATION CLIENT: Coppell lSD, c._Jo Dal- Mac Construction Co. Report Date: November 22, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 DATE PERFORMED: November 18, 1999 I General Contractor: Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: On the above sample date, a representative of Fugro South observed the reinforcing steel placed at the following location: · Handicap parking south of band hall and north parking row east of band hall. The steel was checked for proper size, grade, quantity, vertical location, horizontal spacing, correctness of bends and splices, firmness and security of support and ties and clearances between reinforcement and forms. The following discrepancies were noted and reported · Area of north parking row on east side of band hall had several tie-in bars bent down due to what appeared to be backhoe running over the existing paving. The above discrepancies were corrected prior to concrete placement. Mike Flute Fugro South Technician FUGRO SOUTH, INC. Reviewed By: ~--~ ~.-.~...---~ SMH/mv Distribution: Dal-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 22, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: October 22, 1999 CONTRACTOR: The Cortez Group TICKET NO.: 7078952 CONCRETE SUPPLIER: Lattimore Materials AMBIENT TEMP. (°F): 83 PI.ANT/TRUCK: 7/757 CONCRETE TEMP. (°F) (ASTM C-1064): 74 MIX ID NUMBER: 16 TIME BATCHED: 12:42 AIR (%) (ASTM C-231): 4.1 TIME SAMPLED: 1:32 WATER ADDED (gal): 0 WEATHER CONDITION: Sunny SLUMP (in.) (ASTM C-143): 5 LOCATION OF PLACEMENT: Slab on carton forms in Area Cl on Grid Lines CA and C3 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 281 7 10/29/99 96000 3400 3000/28 days CHC 282 28 11/19/99 122000 4320 CHC 283 28 11/19/99 120000 4240 CHC 284 Hold Fracture mode is (A) unless othe~vise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof ~] [~ [~ D Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. Reviewed By: '"- J SMH/rm Distribution: DaI-Mac Construction - Damon Norman / City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301' Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 22, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 I SAMPLE DATE: October 22, 1999 I CONTRACTOR: The Cortez Group TICKET NO.: 3093770 CONCRETE SUPPLIER: Lattimore Materials AMBIENT TEMP. (°F): 85 PLANT/TRUCK: 3/1024 CONCRETE TEMP. (°F) (ASTM C-1064): 76 MIX ID NUMBER: 16 TIME BATCHED: 3:58 AIR (%) (ASTM C-231): 4 TIME SAMPLED: 4:45 WATER ADDED (gal): 0 WEATHER CONDITION: Sunny SLUMP (in.) (ASTM C-143): 4.50 LOCATION OF PLACEMENT: Retaining wall in Area D on Lines DC and D2.5 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 285 7 10/29/99 99000 3500 3000~28 days CHC 286 28 11/19/99 117000 4140 CHC 287 28 11/19/99 119000 4210 CHC 288 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~;~ r'~ ~--~ ~-'"] Cudng: Methods: ASTM C-39 Fracture: AV",J L/~J V~ [JB C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. Reviewed By: -'- J SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: November 22, 1999 PROJECT: Coppell High School, Coppell. Texas Project No.: 0791-2208 DATE PERFORMED: November 19, 1999 I General Contractor: Dal Can Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Slab on raised deck on building B on grid lines BD to following location: B5 and B6 to A1 Time placement began: 3:15 Time placement ended: 10:00 Total cubic yards placed: 261 Slump range (inches): 4 3/4 - 5 1/2 Slump required (inches): 3-5 Concrete supplier and plant: Lattimore Materials / 3 Concrete temperature range (°F): 65-70°F Strength required (psi/days): 3000~28 Number of cylinders made: 20 Superplasticizer used: No Frank Daniel Fugro South Technician FUGRO SOUTH, INC, Reviewed By: ~ '~-,'~- ~ SMH/mv Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford