SC-Coppell HS-LR 991118FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 18, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: November 10, 1999 I
CONTRACTOR: Dal Mac
TICKET NO.: 7079747 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 82 PLANT/TRUCK: 7/757
CONCRETE TEMP. (°F) (ASTM C-1064): 74 MIX ID NUMBER: 16
TIME BATCHED: 2:54 pm AIR (%) (ASTM C-23'1):
TIME SAMPLED: 3:47 pm WATER ADDED (gal): 10
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-'143): 4.5
LOCATION OF PLACEMENT: Area F exterior grade beams
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 345 7 11/17/99 108000 3820 3000/28 days
CHC 346 28 12/08/99
CHC 347 28 12/08/99
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM 0-31 Testing ASTM 0-143, Typesof ~ ~ ~ ~]
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: William Granger FUGRO SOUTH INC.
Reviewed By: -'- ~
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 18, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
I SAMPLE DATE: November 10, 1999 I
CONTRACTOR: Dal Mac
TICKET NO.: 7079736 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 87 PLANT/TRUCK: 7/959
CONCRETE TEMP. (°F) (ASTM C-1064): 97 MIX ID NUMBER: 16
TIME BATCHED: 1:13 pm AIR (%) (ASTM C-231):
TIME SAMPLED: 1:45 pm WATER ADDED (gal): 10
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C.143): 5
LOCATION OF PLACEMENT: Grade beams all in Area E
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYENDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 341 7 11/17/99 98000 3470 3000/28 days
CHC 342 28 12/08/99
CHC 343 28 12/08/99
CHC 344 Hold
Fracture mode is (A) unless othenvise noted
Specifications: Making & ASTM C-31 Testing ASTM C.143. Typesof [~ ~ ~
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: William Granger FUGRO SOUTH INC.
Reviewed By: ( i
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - doe Craddock
SHW Group - Mike Elmore
dRd Paving - ,Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: November 18, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: October 15, 1999
CONTRACTOR: Cortez Group
TICKET NO.: 7078654 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 87 PLANT/TRUCK: 7/955
CONCRETE TEMP. (°F) (ASTM C.t064): 85 MIX ID NUMBER: 16
TIME BATCHED: 1:37 AIR (%) (ASTM C-231) .'
TIME SAMPLED: 2:15 WATER ADDED (gal): 3
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5
LOCATION OF PLACEMENT: Grade beam, Line GK at F3, Area F
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 269 7 10/22/99 88000 3110 3000/28 days
CHC 270 28 11/12/99 109000 3860
CHC 271 28 11/12/99 112000 3960
CHC 272 Hold
Fracture mode is (A) u~less otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ D
Cudng: Me.ods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By: '~ /
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike EImore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 18, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: October 15, 1999
CONTRACTOR: Cortez Group
TICKET NO.: 7078660 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 88 PLANT/TRUCK: 7/612
CONCRETE TEMP. (°F) (ASTM C-1064): 85 MIX ID NUMBER: 16
TIME BATCHED: 2:15 AIR (%) (ASTM C.231):
TIME SAMPLED: 3:05 WATER ADDED (gal): 5
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5
LOCATION OF PLACEMENT: Grade beam, Line GG at F3, Area F
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 273 7 10/22/99 97000 3430 3000/28 days
CHC 274 28 11/12/99 113000 4000
CHC 275 28 11112/99 115000 4070
CHC 276 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 TestJng ASTM C-143. Typesof ~] ~ ~ B
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By: ~' ~
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
-~,~...,.,
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c. Jo Dal- Mac Construction Co. Report Date: November 18, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: October 20, 1999
CONTRACTOR: The Cortez Group
TICKET NO.: 7078801 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 80.1 PLANT/TRUCK: 7/755
CONCRETE TEMP. (°F) (ASTM C-1064): 72.1 MIX ID NUMBER: 16
TIME BATCHED: 1:15 AIR (%) (ASTM C-231): 5
TIME SAMPLED: 2:00 WATER ADDED (gal): 0
WEATHER CONDITION: Sunny SLUMP (in.) (ASTM C-143): 4.5
LOCATION OF PLACEMENT: Grade beam on Line DB between G5 and C6
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
C HC 277 7 10/27/99 108000 3820 3000/28 days
CHC 278 28 11/17/99 126000 4460
CHC 279 28 11/17/99 128000 4530
CHC 280 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143. Tyl~esof ~ [~ [~ D
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Julio Perez FUGRO SOUTH INC.
Reviewed By: /J
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD- Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
STRUCTURAL STEEL INSPECTION REPORT
CLIENT: Coppell lSD c/o Dal- Mac DATE: November 18, 1999
PROJECT: Coppell High School PROJECT NO.' 0791-2208
REPORT NO: 4 PAGE 1
Owner: Coppell lSD
Architect: SHW Group
Engineer: SHW Group
Contractor: Dal - Mac
Fabricator: Alpha Industries
Location of Project: Coppell, Texas
Inspection Performed At: Job Site X Fabrication Shop
DESCRIPTION OF INSPECllON: Structural Steel Inspection } Visual Inspection of Welds on (Str I Steel - Metal Deck Units) or
Ultrasonic Teeflng or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project
specifications, Contract Documents, Drawings, and Governing Code~ } AWS, AISC, ASTM, SJI, ASNT, ANSI.
See attached Field Regorts for S~ecific Items Insl~cted or Tasted and Tyae of Insoection or Testina gerformed
Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested.
Results of Inspection: Project Complete Project Incomplete
Fabrication Is:
Erection Is: Area A / X
In Compliance :. Area A
Non Compliance ~
Note: Workmanship ~ deviations noted during Insp~'tion. which are being ex~'mcted at time of Ins~:tion, are not being listed on Report.
NOTE: Inspection was performed to verify compliance to Project specifications. Conb-act Documents, Drawings. and Governing
Codes} AWS, AISC. ASTM. SJL. ASNT. ANSI
Inspected By: Doug Post, AWSICertified Welding Inspector, ASNT/Certified Level 2 (UT, MT)
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
Doug Post
STR-1
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
NON - COMPLIANCE REPORT
CLIENT: Coppell lSD c/o Dal - Mac DATE: November 18, 1999
PROJECT: Coppell High School PROJECT NO: 0791-2208
REPORT NO: 4 PAGE 2
Number Description Location Deviate Corrective Action Taken
From
1 Mislocation of bolt holes Area A, 2nd level Drawings Beam connection, angles have
on beam to column been welded @ (3) places to
11/9/99 connection, bolts could AM @ A5, A6 column flange. (No RFI)
not be installed
2 Mislocation of anchor Area H G 10 @ Drawings Corrections have been made per
bolts on column base GH, attachment C RFI Ill, except bolt spacing was
11/18/99 plate on RFI III moved I 1/2 wider due to rebar in
C.I.P floor. Depth of holes are in
compliance. New RFI has been
submitted by DaI-Mac showing a
change in bolt pattern width.
NOTE: Architect and Engineer should advise on acceptability of all noted deviations
Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT)
STR-1
FUGRO SOUTH, INC. ~ ;~I
2880 Virgo Lane: Dallas, Texas 75229
Ph (9721 ,s84-8301; Fax (972) 620-7328
FIELD ERECTION - MEMBERS INSPECTED or TESTED
REPoRTPROJECT:No: ~ .~11 ~,~ ~c ~'~I PROJECTeD:PAGE
In Non
Type of Inspe~ion Location
Compliance Compliance
Che~ s~ze anQ Proje~on of An~ Bolt
Che~ Nu~ on AnCot B~= / ~ght ~~ ~ ~p_ ~ ~,
Che~ Ere~on Pr~dures
C~eck for Oamaged Membem
Check Weldem Qualifi~fion Re~rds
Che~ Fit-Up of Welded
Visual Quali~ of Welds on Jois~ / Gi~em
Visual Quali~ of Welds on Misc Stol
visual Quali~ of Welds on Pre Cast ~nne~
Visual Quali~ of Welds on ~m~i~ ~
Visual Quali~ of Welds on R~f De~
visual Quali~ of Wel~s on Shear S~ds ,
Check Size of Welds on S~ml S~el
Che~ Size of Welds on J~s~ / Gi~em
Che~ Size of Wel~s on Misc Steel
Che~ Size of Welds on Pm ~st ~nne~on
Check Size of Welds o~1 R~f Oe~ :
C~e~ Size of Welds on Shear Studs :
Ul~asonic Testing of Welds ~/
Mag Panicle Testing of Welds
Repcm hand wdtten at time of inspection by Field Inspector ~ in ~ox = In complian~
Repo~ ~v~il be submiEed as is and not ~ X in box = Non compliance } See Non comgliance re;o~
Inspected By: Doug Post, AWS/Ce~fied Welding Inspec:or, ASNT;Ce~ified Level 2 (UT, MT)
STR-2
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
FIELD ERECTION - MEMBERS INSPECTED or TESTED
REPORT NO: PAGE
Ty~ of In~pe~on Location In Non
Compliance Compliance
Check Bolt ~gh~ning ProCure
Che~ Conne~on f~ R~ui~ No. of Bol~ ~/ I
Check B~t Tigh~ess ~ Toque Wren~
Visual Inspecaon of Tension ~n~l Bol~
8eadng B~ted ~ne~ons I Snug Tight ,~i
Check Bolted Conne~ / Turn of Nut
Che~ Ga~ on Load~ Indictor W~hem :
Che~ Size. Leng~, and No. of Shear
Che~ Gauge of ~m~site De~
Che~ Gauge of R~f
Che~ Size ~p Conn~on on Com~ite De~
~e~ Size ~ on R~f De~
Chec~ Ins~lla~on of Bddging ~ Jois~ / Oi~ers
Check Ins~llafion of ~pansion ~om ~
Repot, ",and written at time of inspection by Field Inspector ~' ~n box = In compliance
Recoc.-,v~ll ~3e submitted as is and not typed X in box = Non compliance } See Non compliance repo~
Inspec:ed By: Doug Post, AWS;CertJfied Welding Inspector, ASNT/Certified Level 2 (UT. MT)
ST.R-3