Loading...
SC-Coppell HS-LR 991117FUGRO SOUTH, INC. ~ 2880 Virgo Lane: Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 17, 1999 PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208 SAMPLE DATE: October 15, 1999 CONTRACTOR: Cortez Group TICKET NO.: 7078651 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 84 PLANT/TRUCK: 7/959 CONCRETE TEMP. (°F) (ASTM C-1064): 85 MIX ID NUMBER: 16 TIME BATCHED: 12:56 AIR (%) (ASTM C-231): TIME SAMPLED: 1:40 WATER ADDED (gal): 5 WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5 LOCATION OF PLACEMENT: Grade beam, Line GM at Fl, Area F CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 265 7 10/22/99 84000 2970 3000/28 days CHC 266 28 11/12/99 97000 3430 CHC 267 28 11/12/99 95000 3360 CHC 268 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof ~ ~] ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Greg Forsythe FUGRO SOUTH INC. Reviewed By: SMH/rm Distribution: DaI-Mac Construction - Damo/n Norman City of Coppell- Larry Davis/ Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 STRUCTURAL STEEL INSPECTION REPORT CLIENT: Coppell lSD c/o Dal - Mac DATE: November 17, 1999 PROJECT: Coppell High School PROJECT NO: 0791-2208 REPORT NO: 3 PAGE 1 Owner: Coppell lSD Architect: SHW Group Engineer: SHW Group Contractor: Dal - Mac Fabricator: Alpha Industries Location of Project: Coppell, Texas Inspection Performed At: Job Site X Fabrication Shop DE$CRIIVT1ON OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on (Str I Steel - Mebal Deck Units) or Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. See attached Field Re~orts for S~eclflc Items Inspected or Tested and Type of Insoection or Testin. ~erformed Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested, Results of Inspection: Project Complete Project Incomplete Fabrication Is: Erection Is: Area A / X In Compliance Area A Non Compliance Note: Workmansllip type deviations noted during Inspection, which are being con"ected at time of Inspection. are not being listed on Report. NOTE: Inspection was performed to verify compliance to Project specifications. Contract Documents, Drawings. and Governing Codes} AWS. AISC. ASTM. SJL, ASNT, ANSI Inspected By: Doug Post, AWSlCertified Welding Inspector, ASNTICertified Level 2 (UT, MT) Distribution: DaI-Mac Construction - Dam/on Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Doug Post STR-1 FUGRO SOUTH, INC. ~ 2880 virgo Lane; DalLas, Texas 75229 Ph (972) 484-8301: Fax (972) 620-7328 NON - COMPLIANCE REPORT CLIENT: Coppeil lSD c/o Dal- Mac DATE: November 17, 1999 PROJECT: Coppell High School PROJECT NO: 0791-2208 REPORT NO: 3 PAGE 2 Number Description Location Deviate Corrective Action Taken From 1 Mislocation of bolt holes Area A, 2nd level Drawings Beam connection, angles have on beam to column been welded @ (3) places to 11/9/99 connection, bolts could AM @ A5, A6 column flange. (No RFi) not be installed NOTE: Architect and Engineer should advise on acceptability of all noted deviations Inspected By: Doug Post, AWS/Certified Welding Inspector. ASNT/Certifled Level 2 (UT, MT) STR-1 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 FIELD ERECTION - MEMBERS INSPECTED or TESTED REPORT NO: ~ ~' PAOE Type of Inspection Location In Non Compliance Compliance Check size and Projection of Anchor Bolt Check Anchor Bolt Group Check NutS on Anchor Bolts / Tight Check Erection Procedures Check fOr Damaged Members Check Welders Qualification Records I Check Fit-Up of Welded Connections Visual Quality of Welds on Structural Steel Visual Quality of Welds on Joists ! Girders Visual Quality of Welds on Misc Steel Visual Quality of Welds on Pre Cast Connection '. Visual Quality of Welds on Composite Deck Visual Quality of Welds on Roof Deck . Visual Quality of Welds on Shear Studs Check Size of Welds on St~'uctural Steel Check Size of Welds on Joists I Girders Check Size of Welds on Misc Steel ~ ... Check Size of Welds on Pre Cast Connection Check Size of Welds on Composite / Roof Deck Check Size of Welds on Shear Studs Mag Pac, icle Testing of Welds Report, hand written at time of ;nspection by Field Inspector ~/' in box = In compliance Re,crt wdl ~e submitted as ~s and not typed X in box = Non compliance } See Non compliance repo~ Ir, spected By: Doug Post, AWS/Ce~ified Welding Inspector. ASNT.:Certified Level 2 (UT. MT) STR-2 Fugro Date~ ..cc 2881) Virgo Lanc: Dallas. Texas 75229 Page ~- [./ t .l Ph (972) 484-8301 Fax (972) 620-7328 ULTRASONIC .TEST REPORT Date of Testing J [ ~.1, / { X= Weld X ] X Welding Process--  ~ ~ Qu~i~ Requi~ment~S~fion- AWS DI.I (6.1 & 6.2) R~mat~we Tht ['ndenign~e~i~ that ~e ~low smtemen~ in this : -- ~th ~e mquimm~n~ otsKtion 6)n~ C Ot~h'~AWS DI.I ( 98 ) Stm~unl  ~ We~in~ C~L T~n~ucer - 2~5 MEG~ ~ ~ ~t ~SPE~ED BY Doug Post CWl / ~NT ~vel 2 LD. ~ er ~d We~ ~ MaL T~D ~DI~ ~Y. A~. ~DlC I~ · ~T. Dg~ FROM FROM DISCJ ~NGLE A B C D PATh) ~ R~LT3 F- 70 F- 70 W~. F- 70 F- 70 F=- 70 I,'- 71)