SC-Coppell HS-LR 991111FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
STRUCTURAL STEEL INSPECTION REPORT
CLIENT: Coppell lSD c/o Dal- Mac DATE: November 11, 1999
PROJECT: Coppell High School PROJECT NO: 0791-2208
REPORT NO: 2 PAGE 1
Owner: Coppell lSD
Architect: SHW Group
Engineer: SHW Group
Contractor: Del - Mac
Fabricator: Alpha Industries
Location of Project: Coppell, Texas
Inspection Performed At: Job Site X Fabrication Shop
DE$CRIFTION O~ INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on (5tr I Steel - Mef=,l Deck Units} or
Ultrasonic Te~dng or Magnetic Particle In~pection of Weld~ end Inspection of Bolted Connections for compliance to Project
specifications, Contract Document~, Drawings, and Governing Codes } AW$, AI~C, ASTM, SJI, ASNT, ANSI.
See at+ached Field Rsuorts for $~eciflc Iterrm Insoected or Tested and Ty~e of Irmoection or Testina aerforme~l
Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested.
Results of Inspection: Project Complete Project Incomplete
Fabrication Is:
Erection Is: Area A / X
In Compliance Area A
Non Compliance
Note: Workmanship type deviations noted dudng Inspection. wflich are being corrected at lime of Inspection. are not being listed on Report.
NOTE: Inspection was performed to vedfy compliance to Project specifications. Contract Documents. Drawings. and Governing
Codes} AWS. AISC. ASTM. SJL. ASNT. ANSI
Inspected By: Doug Post, AWS/Certified Welding Inspector. ASNT/Certified Level 2 (UT. MT)
Distribution: Del-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
STR-1
FUGRO SOUTH, INC.
2880 Vir9o Lane; [3a~las. Texas 75229
PI~ (972) 484-8301: Fax (972) 620.7328
NON - COMPLIANCE REPORT
CLIENT: Coppell ISO do Oal- Uac DATE: November 11, 1999
PROJECT: Coppell High Schoo~ PROJECT NO: 0791-2208
REPORT NO: 2 PAGE 2
Number Description Location Deviate Corrective Action Taken
From
1 Mislocation of bolt holes Area A, 2nd level Drawings Beam connection, angles have
on beam to column been welded @ (3) places to
11/9/99 connection, bolts could AM @ A5, A6 column flange. (No RFI)
not be installed
NOTE: Architect and Engineer should advise on acceptability of all noted deviations
inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT)
STR-1
FUGRO SOUTH, INC.
I=n (972) ~1: F~ (~2) ~7~e
FIELD ERECTION- MEMBERS INSPECTED or TESTED
REPORTP~OJECT:No:
~ N~ ~ ~ ~ / ~ht
~ F~ of We~
~g Pa~ Tes6ng of We~
Reg~ ~ ~ su~ml~
Inspected By: Ooug Post, Aws/~ we~ing Ifl~r. AS~l~fl~ L~ 2 (UT, MT)
STR-2
/
FUGRO SOUTH, INC.
~M0 v~go ~ne: O~l~. ?~ ?~29
FIELD ERECTION - MEMBERS INSPECTED or TESTED
PROJECT: ~*~'}"~)~'~:'~ PROJECT
~aPO~T NO: ~ t/' / PA~E ~,',,
Report hanCl wdKen ~t time of inagegliwl by Field insbec~x ,/' in box · In Gam~)llance
Re~rt will be submitted ~ LI grid not typed X In I~ox · Non compliance ) ~ Non compliance report
Inspected By: Doug Post, Aws(Ce~tl~ WMding In~e~ar. ASN?/Cediaed Lee 2 (u'r, MT)
STR-3
FUGRO SOUTH, INC. ~
2880 virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
STRUCTURAL STEEL INSPECTION REPORT
CLIENT: Coppell lSD c/o Dal- Mac DATE: November 11, 1999
PROJECT: Coppell High School PROJECT NO: 0791-2208
REPORT NO: I PAGE 1
Owner: Coppell lSD
Architect: SHW Group
Engineer: SHW Group
Contractor: Dal- Mac
Fabricator: Alpha Industries
Location of Project: Coppell, Texas
Inspection Performed At: Job Site X Fabrication Shop
DESCRIPTION OF INSPECTION: Structural Steel Inspection ) Vleual Inspection of Welds on (Str I Steel - Metal Deck Units} or
Ulbasonlc Teetlng or Magnetic Particle Inepection of Weld~ and Inepection of Bolted Connections for compliance to Project
speciflcatione, Contract Documen'm, Drawing~. and Governing Code~ } AW~, AISC, A~TM, SJI, ASNT, ANSI.
See aff=,ched Field Regorts for Soeciflc Rems In~oected or Tested and Tyoe of Insuection or Testing eerformed
Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested.
Results of Inspection: Project Complete Project Incomplete
Fabrication Is:
Erection Is: Area A / X
In Compliance Area A
Non Compliance
Note: Workmanship type deviations noted during Inspection, which are being corrected at time of Inspection. are not being listed on Report.
NOTE: Inspection was performed to vedfy compliance to Project specifications, Contract Documents. Drawings, and Governing
Codes} AWS, AISC. ASTM, SJL, ASNT, ANSI
inspected By: Doug Post, AWS/Certified Welding Inspector. ASNT/Certified Level 2 (UT, MT)
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
STR-1
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972)484-8301; Fax (972) 620-7328
NON - COMPLIANCE REPORT
CLIENT: Coppell lSD c,/o Dal - Mac DATE: November 11, 1999
PROJECT: Coppell High School PROJECT NO: 0791-2208
REPORT NO: 1 PAGE 2
Number Description Location Deviate Corrective Action Taken
From
1 Mislocation of bolt holes Area A, 2nd level Drawings Beam connection, angles have
on beam to column been welded @ (3) places to
11/9/99 connection, bolts could AM @ A5, A6 column flange. (No RFI)
not be installed
NOTE: Architect and Engineer should advise on acceptability of all noted deviations
Inspected By: Doug Post, AWS/Certifled Welding Inspector, ASNT/Certified Level 2 (UT, MT)
STR-1
FUGRO SOUTH, INC. '- ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: November 11, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: October 13, 1999
CONTRACTOR: Cortez Group
TICKET NO.: 7078528 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 72 PLANT/TRUCK: 7/785
CONCRETE TEMP. (°F) (ASTM C-'1064): 78 MIX ID NUMBER: 16
TIME BATCHED: 9:21 AIR (%) (ASTM C-231):
TIME SAMPLED: 9:45 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5
LOCATION OF PLACEMENT: Slab, lower dining area, southeast corner of slab
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 241 7 10/20/99 80000 3830 3000/28 days
CHC 242 28 11/10/99 106000 3750
CHC 243 28 11/10/99 108000 3820
CHC 244 Hold
Fracture mode is (A) unless othenvise noted
Specifications.' Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ ~ ~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By: f ./
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis/'
Coppell lSD - Mickey Harper
SHW Group - Joe Craddcck
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~.--
2880 Virgo Lane; Dallas. Texas 75229
Ph (972)484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 11, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: October 13, 1999 I
CONTRACTOR: Cortez Group
TICKET NO.: 6109790 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 75 PLANT/TRUCK: 6/804
CONCRETE TEMP. (°F) (ASTM C-1064): 79 MIX ID NUMBER: 16
TIME BATCHED: 10:10 AIR (%) (ASTM C-231):
TIME SAMPLED: 10:40 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143) .' 5
LOCATION OF PLACEMENT: Slab, lower dining area, 20 feet north from southeast corner of slab
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 245 7 10/20/99 87000 3080 3000/28 days
CHC 246 28 11/10/99 116000 4100
CHC 247 28 11/10/99 114000 4030
CHC 248 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Types of
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By:
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike EImore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972)484-8301: Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: November 11, 1999
PROJECT: Coppell High School, Coppell, Texas Project No.: 0791-2208
SAMPLE DATE: October 13, 1999 I
CONTRACTOR: Cortez Group
TICKET NO.: CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 80 PLANT/TRUCK: 3/822
CONCRETE TEMP. (°F) (ASTM C.1064): 80 MIX ID NUMBER: 16
TIME BATCHED: 11:06 AIR (%) (ASTM C-231):
TIME SAMPLED: 11:45 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5
LOCATION OF PLACEMENT: Slab, lower dining area, 2 feet east from northwest comer
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 249 7 10/20/99 85000 3010 3000/28 days
CHC 250 28 11/10/99 111000 3930
CHC 251 28 11/10/99 113000 4000
CHC 252 Hold I
Fracture mode is (A) unless otherwise noted
Sl~ecifications: Making & ASTM C-31 Testing ASTM C-143. Typesof [~ [~] ~ E]
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By: w ,~
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford