Loading...
SC-Coppell HS-LR 991026FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 26, 1999 PROJECT: Coppell High School, Coppeil, Texas PROJECT NO: 0791-2208 SAMPLE DATE: September 24, 1999 CONTRACTOR: The Cortez Group TICKET NO.: 7077612 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 98 PLANT/TRUCK: 7~755 CONCRETE TEMP. (°F) (ASTM C-'1064): 90 MIX ID NUMBER: (16) 3000 PSI W/R TIME BATCHED: 1:40 pm AIR (%) (ASTM C-231): TIME SAMPLED: 2:30 pm WATER ADDED (gal): 0 WEATHER CONDITION: Cloudy SLUMP (in.) (ASTM C-143): 6 LOCATION OF PLACEMENT: D Area at west side of school, Line D-6.5 between Lines DF and DG CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 169 7 10/01/99 76000 2690 3000/28 days CHC 170 28 10/22/99 104000 3680 CHC 171 28 10/22/99 102000 3610 CHC 172 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof r~ m F--~ ['-' Cudng: Methods: ASTM C-39 Fracture: AY....~ V~I VI I lB C D REMARKS: Technician: D. Gallaway, Jr. FUGRO SOUTH INC. Reviewed By: SMH/rm Distribution: Dal-Mac Construction- Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301: Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 26, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO.' 0791-2208 DATE PERFORMED: October 22, 1999 I General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Retaining Wall in Area "D" on Grid Lines D2 to D1 and following location: from DB to DH - Slab on Carter forms in Area Cl on Grid Lines C4 to D1 and from D8 to CA.1 Time placement began: 1:00 p.m. Time placement ended: 5:00 p.m. Total cubic yards placed: 84 Slump range (inches): 4.5 to 5.0 Slump required (inches): 3 - 5 Concrete supplier and plant: Lattimore - Plant No 7 and 3 Concrete temperature range (°F): 74 - 76°F Strength required (psi/days): 3000~28 Number of cylinders made: 8 Super-plasticizer used: No Frank Daniel Fugro South Technician FUGRO SOUTH, INC. Reviewed By: '~. SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 26, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 SAMPLE DATE: October 15, 1999 CONTRACTOR: Cortez Group TICKET NO.: 7078654 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 87 PLANT/TRUCK: 7/955 CONCRETE TEMP. (°F) (ASTM C-1064)-' 85 MIX ID NUMBER: 16 TIME BATCHED: 1:37 AIR (%) (ASTM C-231): TIME SAMPLED: 2:15 WATER ADDED (gal): 3 WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143) .' 5 LOCATION OF PLACEMENT: Grade beam, Line GK at F3 and F CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 269 7 10/22/99 88000 3110 3000/28 days CHC 270 28 11/12/99 CHC 271 28 11/12/99 CHC 272 Hold Fracture mode is (A) unless other, vise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof ~;~ r'['] ~-~ N Cudng: Methods: ASTM C-39 Fracture: AV~ V~ V~ L.JB C D REMARKS: Technician: Greg Forsythe FUGRO SOUTH INC. Reviewed By: *'- .Z SMH/rm Distribution: [}al-Mac Construction- Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 26, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO.' 0791-2208 SAMPLE DATE: October 15, 1999 CONTRACTOR: Cortez Group TICKET NO.: 7078651 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 84 PLANT/TRUCK: 7/959 CONCRETE TEMP. (°F) (ASTM C-10S4): 85 MIX ID NUMBER: 16 TIME BATCHED: 12:56 AIR (%) (ASTM C-231): TIME SAMPLED: 1:40 WATER ADDED (gal): 5 WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5 LOCATION OF PLACEMENT: Grade beam, Line GM at F1 Area F CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 265 7 10/22/99 84000 2970 3000/28 days CHC 266 28 11/12/99 CHC 267 28 11/12/99 CHC 268 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof ~] [~q [~ E] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Greg Forsythe FUGRO SOUTH INC. Reviewed By: ~ ~/ SMH/rm Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford _J