Loading...
SC-Coppell HS-LR 991025 (3)FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 25, 1999 PROJECT: Coppell High School, Coppeil, Texas PROJECT NO: 0791-2208 DATE PERFORMED: October 20, 1999 General Contractor: The Co~ez Group Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Grade Beam - Area C1 from D1 to C4 and on following location: DA to DB, also Area D on Building D - D-1 to D-6 on Lane DA to Db. Time placement began: 12:00 noon Time placement ended: Total cubic yards placed: 81 Slump range (inches): 4.5 to 5.0 Slump required (inches): 5.0 Concrete supplier and plant: Lattimore - Plant No. 7 Concrete temperature range (°F): 72°F Strength required (psi/days): 3000/28 Number of cylinders made: 4 Superplasticizer used: No Julio Perez Fugro South Technician FUGRO SOUTH, INC. Reviewed By: SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis, / Copl3ell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford