SC-Coppell HS-LR 991025 (3)FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 25, 1999
PROJECT: Coppell High School, Coppeil, Texas PROJECT NO: 0791-2208
DATE PERFORMED: October 20, 1999
General Contractor: The Co~ez Group
Method of Test: Applicable ACl Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the Grade Beam - Area C1 from D1 to C4 and on
following location: DA to DB, also Area D on Building D - D-1 to D-6 on
Lane DA to Db.
Time placement began: 12:00 noon
Time placement ended:
Total cubic yards placed: 81
Slump range (inches): 4.5 to 5.0
Slump required (inches): 5.0
Concrete supplier and plant: Lattimore - Plant No. 7
Concrete temperature range (°F): 72°F
Strength required (psi/days): 3000/28
Number of cylinders made: 4
Superplasticizer used: No
Julio Perez
Fugro South Technician
FUGRO SOUTH, INC.
Reviewed By:
SMH/bg
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis,
/
Copl3ell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford