SC-Coppell HS-LR 991021 (2)FUGRO SOUTH, INC. /
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 21, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
DATE PERFORMED: October 15, 1999
General Contractor: DaI-Mac
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Slab Area F
following location:
Time placement began: 12:00 noon
Time placement ended: 5:00 p.m.
Total cubic yards placed: 160
Slump range (inches): 4.0 to 5.0
Slump required (inches): 5.0
Concrete supplier and plant: Lattimore - Plant No. 7
Concrete temperature range (°F): 85 - 88°F
Strength required (psi/days): 3000/28
Number of cylinders made: 12
Superplasticizer used: No
Greg Forsythe
Fugro South Technician
FUGRO SOUTH, INC.
Reviewed By:
SMH/bg
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
C0ppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford