Loading...
SC-Coppell HS-LR 991021 (2)FUGRO SOUTH, INC. / 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 21, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 DATE PERFORMED: October 15, 1999 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Slab Area F following location: Time placement began: 12:00 noon Time placement ended: 5:00 p.m. Total cubic yards placed: 160 Slump range (inches): 4.0 to 5.0 Slump required (inches): 5.0 Concrete supplier and plant: Lattimore - Plant No. 7 Concrete temperature range (°F): 85 - 88°F Strength required (psi/days): 3000/28 Number of cylinders made: 12 Superplasticizer used: No Greg Forsythe Fugro South Technician FUGRO SOUTH, INC. Reviewed By: SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis C0ppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford