SC-Coppell HS-LR 991004FUGRO SOUTH, INC.
2880 Virgo Lane: Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 4, 1999
PROJECT: Coppell HiGh School, Coppeil, Texas PROJECT NO: 0791-2208
I SAMPLE DATE: September 23, 1999 I
CONTRACTOR: Dal - Mac
TICKET NO.: 7077483 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 64 PLANT/TRUCK: 7/958
CONCRETE TEMP. (°F) (ASTM C.10S4): 80 MIX ID NUMBER: 16
TIME BATCHED: 10:14 AIR (%) (ASTM C-231):
TIME SAMPLED: 10:40 WATER ADDED (gal): 15
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5.0
LOCATION OF PLACEMENT: Slab, 10 feet east, 10 feet south from northwest corner of freshman
center
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYUNDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 165 7 9-30-99 94000 3330 3000/28 days
CHC 166 28 10-21-99
CHC 167 28 10-21-99
CHC 168 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~] [~] [~-"] ~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By: -'- I
SMH/mv
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 4, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September 23, 1999 I
CONTRACTOR: Dal - Mac
TICKET NO.: 7077480 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 64 PLANT/TRUCK: 7/786
CONCRETE TEMP. (°F) (ASTM C-1064): 79 MIX ID NUMBER: 16
TIME BATCHED: 9:52 AIR (%) (ASTM C.231):
TIME SAMPLED: 10:25 WATER ADDED (gal): 10
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5.0
LOCATION OF PLACEMENT: Slab, 20 feet east, 5 feet north from southwest corner of freshman
center
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 161 7 9-30-99 95000 3360 3000~28 days
CHC 162 28 10-21-99
CHC 163 28 10-21-99
CHC 164 Hold
Fracture mode is (A) unless other,vise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ ~] ~ E~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed
SMH/mv
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JP, J Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. REPORT DATE: October 4, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September 23, 1999
CONTRACTOR: Dal - Mac
TICKET NO.: 7077466 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 59 PLANT/TRUCK: 7/785
CONCRETE TEMP. (°F) (ASTM C.1064): 76 MIX ID NUMBER: 16
TIME BATCHED: 7:50 AIR (%) (ASTM C-231):
TIME SAMPLED: 8:50 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143) .' 5.0
LOCATION OF PLACEMENT: Slab, 50 feet east, 30 feet south from northwest corner of freshman
center
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYMNDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 157 7 9-30-99 98000 3470 3000~28 days
CHC 158 28 10-21-99
CHC 159 28 10-21-99
CHC 160 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] [~ ~-";] ~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By: ~'~ /'
SMH/mv
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, r./o Dal- Mac Construction Co. REPORT DATE: October 4, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September23, 1999
CONTRACTOR: Dal - Mac
TICKET NO.: 7077452 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 50 PLANT/TRUCK: 7/752
CONCRETE TEMP. (°F) (ASTM C-10~4): 73 MIX ID NUMBER: 16
TIME BATCHED: 6:31 AIR (%) (As*ha c-231):
TIME SAMPLED: 7:10 WATER ADDED (gal): 10
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-~43): 5.0
LOCATION OF PLACEMENT: Slab, 80 feet east, 10 feet south from northwest corner of freshman
center
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYUNDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 153 7 9-30-99 103000 3640 3000/28 days
CHC 154 28 10-21-99
CHC 155 28 10-21-99
CHC 156 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~] ~ ~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By: "- ~
SMH/mv
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 4, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September 23, 1999
CONTRACTOR: Dal - Mac
TICKET NO.: 7077444 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 50 PLANT/TRUCK: 7/955
CONCRETE TEMP. (°F) (ASTM C-10S4): 72 MIX ID NUMBER: 16
TIME BATCHED: 5:44 AIR (%) (ASTM C-231):
TIME SAMPLED: 6:10 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C.143) .' 5.0
LOCATION OF PLACEMENT: Slab, 40 feet west, 20 feet south from northeast comer of freshman
center
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 149 7 9-30-99 108000 3820 3000~28 days
CHC 150 28 10-21-99
CHC 151 28 10-21-99
CHC 152 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] [~ ~ ~]
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By: - /
SMH/mv
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, cio Dal - Mac Construction Co. REPORT DATE: October 4, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September 23, 1999
CONTRACTOR: Dal - Mac
TICKET NO.: 7077429 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 50 PLANT/TRUCK: 7/755
CONCRETE TEMP. (°F) (ASTM C.t064): 70 MIX ID NUMBER: 16
TIME BATCHED: 4:19 AIR (%) (ASTM C-231):
TIME SAMPLED: 5:00 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTra C-143): 5.0
LOCATION OF PLACEMENT: Slab, 20 feet west, 10 feet north from southeast corner of freshman
center
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYUNDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 145 7 9-30-99 110000 3890 3000/28 days
CHC 146 28 10-21-99
CHC 147 28 10-21-99
CHC 148 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ ~-'-~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By: ,""-/' ~
SMH/mv
Distribution.' DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
--r-~n.-,~
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. REPORT DATE: October 4, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September 23, 1999
CONTRACTOR: Dal - Mac
TICKET NO.: 7077418 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 60 PLANT/TRUCK: 7/947
CONCRETE TEMP. (°F) (ASTM C.1064): 80 MIX ID NUMBER: 16
TIME BATCHED: 3:02 AIR (%) (ASTM C-231):
TIME SAMPLED: 3:30 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5.0
LOCATION OF PLACEMENT: Slab, 10 feet south, 5 feet west from northeast corner of freshman
center
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 141 7 9-30-99 100000 3540 3000/28 days
CHC 142 28 10-21-99
CHC 143 28 10-21-99
CHC 144 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM 0-31 Testing ASTM C-143. Typesof [~ [~ ~ ~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Greg Forsythe FUGRO SOUTH INC.
Reviewed By:~'~ I ------
SMH/mv
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Goppell lSD - Mickey Harper
SHW Group - Joe Craddock
$HW Group - Mike Elmore
.JR,J Paving - .left WJllJford
sou ., -"
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: October 4, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September 2, 1999
CONTRACTOR: The Cortez Group
TICKET NO.: 70765000 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 99 PLANT/TRUCK: 71785
CONCRETE TEMP. (°F) (ASl~a C.1OS4): 92 MIX ID NUMBER: (16) 300 PSI W/R
-TIME BATCHED: 3:05 AIR (%) (ASTM C-231):
TIME SAMPLED: 4:05 WATER ADDED (gal): 10
WEATHER CONDITION: Cloudy SLUMP (in.) (ASTM C-143) · 7.50
LOCATION OF PLACEMENT: Piers: DA-D6, DC.2-D5, and DC.2-D4.4
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (pal) (psi)
CHC 89 7 09/09/99 86000 2330 3000/28 days
CHC 90 28 09/30/99 90000 3180
CHC 91 28 09/30/99 88000 3110
CHC 92 Hold
Fracture mode is (A) unless otherwise noted
Specifica§ons: Making & ASTM 0-31 Testing ASTM C-143, Typesof ~] [~ ~---'~ ~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: D. Gallaway, Jr. FUGRO SOUTH INC.
Reviewed By: - !
SMH/mv
Distribution: DaI-Mac Construction- Damgn Norman
City of Coppell - Larry Davis"
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane: Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell lSD, cio Dal - Mac Construction Co. REPORT DATE: October 4, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
DATE PERFORMED: September 30, 1999
General Contractor: The Cortez Group
Method of Test: Applicable ACI Recommendations and ASTM Standards
Results ! Remarks:
Concrete placement observation was performed at the Slab - All of Building "B" slab on grade
following location:
Time placement began: 4:45
Time placement ended: 10:30
Total cubic yards placed: 340
Slump range (inches): 5.0 to 6.0
Slump required (inches): 5.0
Concrete supplier and plant: Lattimore - Plant No. 3, 6, 7
Concrete temperature range (°F): 65 - 67°F
Strength required (psi/days): 3000/28
Number of cylinders made: 28
Superplasticizer used: No
Julio Perez
Fugro South Technician
FUGRO SOUTH, INC.
Reviewed By:
SMH/bg
Distribution: DaI-Mac Construction - Dampen Norman
City of Coppell - Larry Davis--
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane: Dallas, Texas 75229
Ph (972) 484-8301: Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. REPORT DATE: October 4, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
DATE PERFORMED: September 30, 1999
General Contractor: The Cortez Group
Method of Test: Applicable ACl Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the Grade Beams - On Building "D"
following location:
Time placement began: 2:00 p.m.
Time placement ended: 4:30 p.m.
Total cubic yards placed: 100
Slump range (inches): 5.0 to 4.5
Slump required (inches): 5.0
Concrete supplier and plant: Lattimore - Plant No. 3
Concrete temperature range (°F): 65 - 67°F
Strength required (psi/days): 3000~28
Number of cylinders made:
Superplasticizer used: No
Julio Perez
Fugro South Technician
FUGRO SOUTH, INC.
Reviewed By: /'- ' '
SMH/t~J
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford