Loading...
SC-Coppell HS-LR 990924FUGRO SOUTH, INC. 2880 Vi~go Lane; Dallas, Texas 75229 Ph (972) 484-830t; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 24, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 DATE PERFORMED: September 23, 1999 General Contractor: DaI-Mac Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Slab on Grade - Freshman Center following location: Time placement began: 3:00 a.m. Time placement ended: 12:00 noon Total cubic yards placed: 690 Slump range (inches): 4.5 - 5.0 Slump required (inches): 5.0 Concrete supplier and plant: Lattimore - Plant No. 7 Concrete temperature range (°F): 72 - 80°F Strength required (psi/days): 3000/28 Number of cylinders made: 28 Superplasticizer used: No Grag Forsythe Fugro South Technician FUGRO SOUTH, INC. Reviewed By: '~ ~'"'~.., ~ SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. ~ 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c./o Dal - Mac Construction Co. REPORT DATE: September 24, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 SAMPLE DATE: Sepember 16, 1999 CONTRACTOR: Cortez Group TICKET NO.: 3091954 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 86 PLANT/TRUCK: 3/968 CONCRETE TEMP. (°F) (ASTM C.10S4): 89 MIX ID NUMBER: 16 TIME BATCHED: 2:46 AIR (%) (ASTU C-231): TIME SAMPLED: 4:00 WATER ADDED (gal): 5 WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 3 3/4 LOCATION OF PLACEMENT: Piers: Pier #249 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 137 7 09123199 81000 2870 3000/28 days CHC 138 28 10/14/99 CHC 139 28 10/14/99 CHC 140 Hold Fracture mode is (A) unless othenvise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ["~ ~--~ ~"~ Cudng: Methods: ASTM C-39 Fracture: AI/XI I/XJ VI I lB C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. Reviewed By: ,,~ ~ SMH/rm Distribution: DaI-Mac Construction- Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford