SC-Coppell HS-LR 990922FUGRO SOUTH, INC. ~'~~.
2880 Virgo ~ane: Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, cio Dal - Mac Construction Co. REPORT DATE: September 22, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
I SAMPLE DATE: August 24, 1999 I
CONTRACTOR: Dal Mac
TICKET NO.: 76001 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 98 PLANT/TRUCK: 75718
CONCRETE TEMP. (°F) (ASTM C.1064): 87 MIX ID NUMBER: 16
TIME BATCHED: 12:23 AIR (%) (ASTM C-251):
TIME SAMPLED: 1:10 WATER ADDED (gal): 5
WEATHER CONDITION: Partly cloudy SLUMP (in.) (ASTM C-143): 4.5
LOCATION OF PLACEMENT: Grade beam at grid line Al0 and AE
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 41 7 08/31/99 88000 3110 3000/28 days
CHC 42 28 09/21/99 113000 4000
CHC 43 28 09/21/99 115000 4070
CHC 44 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ ~ ~ ~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: David Putman FUGRO SOUTH INC.
Reviewed By:
SMH/rm
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis /
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Wiiliford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301: Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 22, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: August 24, 1999
CONTRACTOR: Dal Mac
TICKET NO.: 76002 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 103 PLANT/TRUCK: 7/802
CONCRETE TEMP. (°F) (AST¥ C-10~4): 90 MIX ID NUMBER: 16
TIME BATCHED: 2:47 AIR (%) (ASTM C-231):
TIME SAMPLED: 3:15 WATER ADDED (gal): 0
WEATHER CONDITION: Hot SLUMP (in.) (ASTM C-143): 5
LOCATION OF PLACEMENT: Grade beam at grid line A7.3 at AJ
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYENDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 45 7 08/31/99 77000 2720 3000/28 days
CHC 46 28 09/21/99 92000 3250
CHC 47 28 09121/99 89000 3150
CHC 48 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Tesling ASTM C-143. Typesof ~] ~ ~ ~
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: David Putman FUGRO SOUTH INC.
Reviewed By: ': /
SMH/rm
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas ?5229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 22, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO-' 0791-2208
SAMPLE DATE: August 24, 1999
CONTRACTOR: Dal Mac
TICKET NO.: 76037 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 105 PLANT/TRUCK: 976/7
CONCRETE TEMP. (°F) (ASTM C.1064): 92 MIX ID NUMBER: 16
TIME BATCHED: 3:48 AIR (%) (ASTM C.23'1):
TIME SAMPLED: 4:30 WATER ADDED (gal): 10
WEATHER CONDITION: Partly cloudy SLUMP (in.) (ASTM C-143): 5
LOCATION OF PLACEMENT: Grade beams at A6 and AE
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square Inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 49 7 08/31/99 92000 3250 3000/28 days
CHC 50 28 09/21/99 105000 3710
CHC 51 28 09/21/99 107000 3780
CHC 52 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~;~ m r-~ r--~
Cudng: Methods: ASTM C-39 Fracture: AVXJ [/~ V~ LJB c D
REMARKS:
Technician: David Putman FUGRO SOUTH INC.
Reviewed By: -'-
SMH/rm
Distribution: Dal-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
DRILLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o DaI-Mac Construction Co. REPORT DATE: September 22, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
DRILLING CONTRACTOR: Wylie Drilling Page 1
DATE PERFORMED: September 20, 1999
Depth
Shaft to Plan Actual Total
Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing
Number in. Material tion ft. tion ft. ft. Alignment Present(~) Used Remarks
ff.
AREA "C"
18 14.9 4.0 4.1 19.0 Yes Yes Yes H8.5-C.5
18 14.5 4.0 4.2 19.7 Yes Yes Yes H8.5-C.7
AREA "G"
1 18 N/A N/A -0- 10.2 Yes No No (2)
2 18 N/A N/A -0- 11.1 Yes No No (2)
3 18 N/A N/A -0- 10.6 Yes No No (2)
Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Beadng Material: Gray Shale
4) During drilling operations; however, piers were dry prior to placement of concrete.
2~ These piers were for light pole bases and there was no specified penetration, only a minimum depth
specification of 10 feet.
Thomas Cranford
Fugro Technician FUGRO SOUTH INC.
Reviewed By: ~ - ~_.,..-.---
SMH/bg
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group -Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 22, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September 14, 1999 I
CONTRACTOR: Cortez Group
TICKET NO.: 7077074 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 86 PLANT/TRUCK: 7/785
CONCRETE TEMP. (°F) (ASTM C-1064): 88 MIX ID NUMBER: 16
TIME BATCHED: 4:30 AIR (%) (ASTM C-231):
TIME SAMPLED: 5:35 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 5
LOCATION OF PLACEMENT: Piers: Pier #112
' CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 129 7 09/21/99 89000 3150 3000/28 days
CHC 130 28 10/12/99
CHC 131 28 10/12/99
CHC 132 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof [~] [~ ~ r'"]
curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: ThomasCmnford FUGRO SOUTH INC.
Reviewed By: f J
SMH/rm
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972)484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 22, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September 14, 1999 I
CONTRACTOR: Cortez Group
TICKET NO.: 7077054 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 84 PLANT/TRUCK: 7~938
CONCRETE TEMP. (°F) (ASTM C.1064): 87 MIX ID NUMBER: 16
TIME BATCHED: 1:25 AIR (%) (ASTM C-231):
TIME SAMPLED: 2:15 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C-143): 4
LOCATION OF PLACEMENT: Grade beam, Area B BQ-B5
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 125 7 09/21/99 67000 2370 3000/28 days
CHC 126 28 10/12/99
CHC 127 28 10/12/99
CHC 128 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof ~] ~ ~
Cudng: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Thomas Cranford FUGRO SOUTH INC.
Reviewed By: ~ !
SMH/rm
Distribution: DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford