SC-Coppell HS-LR 990914 -I~. ~_-.-,.,,
FUGRO SOUTH, INC. ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972)484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 14, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: August 17, 1999
CONTRACTOR: Cortez Group
TICKET NO.: 075736 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 98 PLANT/TRUCK: 7 / 956
CONCRETE TEMP. (°F) (ASTM C-10S4): 89 MIX ID NUMBER: 16
TIME BATCHED: 3:56 AIR (%) (ASTM C-231):
TIME SAMPLED: 4:45 WATER ADDED (gal): 10
WEATHER CONDITION: Hot SLUMP (in.) (ASTM C-143) .' 4-1/4
LOCATION OF PLACEMENT: Piers - Pier #193
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x '12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 29 7 8-24-99 73000 2580 3000/28 days
CHC 30 28 9-14-99 98000 3470
CHC 31 28 9-14-99 100000 3540
CHC 32 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ rm'~ r~ (--i
Cudng: Methods: ASTM C-39 Fracture: A[/XJ [/~ ~_J [_.]B C D
REMARKS:
Technician: Tom Cypert FUGRO SOUTH INC.
Reviewed By: f ~
SMH/rm
Distribution: DaI-MacConstruction- Damo/n Norman
City of Coppell - Larry Davis"
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Viroo Lane: Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 14, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September 3, 1999 I
CONTRACTOR: The Cortez Group
TICKET NO.: 7076619 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): 99 PLANT/TRUCK: 7/755
CONCRETE TEMP. (°F) (ASTM C-1064): 95 MIX ID NUMBER: (16) 3000 PSI W/R
TIME BATCHED: 2:58 pm AIR (%) (ASTM C-231):
TIME SAMPLED: 3:45 pm WATER ADDED (gal): 15
WEATHER CONDITION: Partly cloudy SLUMP (in.) (ASTM C-143): 6
LOCATION OF PLACEMENT: Grade beam between Lines B4 and B5 on Line BH, Area B
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 101 7 09/10/99 80000 2830 3000/28 days
CHC 102 28 10/01/99
CHC 103 28 10/01/99
CHC 104 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof [~ ~ ~ ~]
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: D. Gallaway, Jr. FUGRO SOUTH INC.
Reviewed By: " ~/
SMH/rm
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. ~
2880 Vino lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. REPORT DATE: September 14, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
SAMPLE DATE: September 3, 1999
CONTRACTOR: Cortez Group
TICKET NO.: 3091401 CONCRETE SUPPLIER: Lattimore
AMBIENT TEMP. (°F): PLANT/TRUCK: 3/761
CONCRETE TEMP. (°F) (ASTM C-t064): 92 MIX ID NUMBER: (16) 3000 PSI W/R
TIME BATCHED: 11:21 am AIR (%) (ASTM C-231):
TIME SAMPLED: 12:36 pm WATER ADDED (gal): 0
WEATHER CONDITION: Partly cloudy SLUMP (in.) (ASTM C-143): 8.50
LOCATION OF PLACEMENT: Between AH and AJ on Line A1 (grade beam), Area B
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYUNDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 97 7 09/10/99 73000 2580 3000/28 days
CHC 98 28 10/01/99
CHC 99 28 10/01/99
CHC 100 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143. Types°f B [~ [~ J-'l
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: D. Gallaway. Jr. FUGRO SOUTH INC.
Reviewed By: ,,- l
SMH/rm
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 14, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO.' 0791-2208
SAMPLE DATE: September 3, 1999 I
CONTRACTOR: Cortez Group
TICKET NO.: 3091419 CONCRETE SUPPLIER:
AMBIENT TEMP. (°F): 92 PLANT/TRUCK: 3/975
CONCRETE TEMP. (°F) (Aswa c-t0e4): 87 MIX ID NUMBER: 16
TIME BATCHED: 3:06 AIR (%) (Aswa c.231):
TIME SAMPLED: 4:00 WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (in.) (ASTM C.143): 4 1/4
LOCATION OF PLACEMENT: Piers: Pier #21
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CHC 93 7 09/10/99 94000 3330 3000/28 days
CHC 94 28 10/01/99
CHC 95 28 10/01/99
CHC 96 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM 0-143, Typesof ~] [~ [~ 0
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS:
Technician: Thomas L. Cranford FUGRO SOUTH INC.
Reviewed By: .- J -
SMH/rm
Distribution: DaI-Mac Construction- Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH, INC. /
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
DRILLED PIER OBSERVATION REPORT
CLIENT: Coppell lSD, c/o DaI-Mac Construction Co. REPORT DATE: September 14, 1999
PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208
DRILLING CONTRACTOR: Wylie Drilling Page 1
I DATE PERFORMED: September 10, 1999 I
Location: AREA D
Depth to
Shaft Bearing Plan Actual Total
Pier Number Diameter Material Penetra. Penetra- Depth Proper Water Casing
in. ft. tion ft. tion ft. ft. Alignment Present Used Remarks
80 24 5.5 13.0 13.1 18.6 Yes No Yes DG/D6
88 24 7.0 11.0 11.0 18.0 Yes No Yes D2/DG.7
93 18 6.0 10.0 10.6 16.6 Yes No Yes D1.9/DF.5
140 18 6.0 11.0 11.3 17.3 Yes No Yes D4/DF.5
92 18 5.7 8.0 9.5 15.2 Yes No Yes D4.5/D F. 5
94 18 6.0 8.0 9.6 15.6 Yes No Yes D5.1/D F.5
89 24 6.0 14.0 15.0 21.0 Yes No Yes D2/DG
153 18 5.0 9.0 11.8 16.8 Yes No Yes D5.4/D F. 1
152 18 7.6 10.0 10.8 18.4 Yes No Yes DE.I/D5.1
81 18 6.5 7.0 8.4 14.9 Yes No Yes D.5/DE.5
142 18 6.0 9.0 9.6 15.6 Yes No Yes D4/DF. 1
82 18 5.7 7.0 8.3 14.0 Yes No Yes D5/DF.1
151 18 5.0 6.0 6.5 11.5 Yes No Yes D5.5/DC.2
Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless
otherwise noted.
Bearing Material: Dark Gray Shale
Note: Casing used to prevent sandy soil from caving in.
Phillip Forrest
Fugro Technician FUGRO SOUTH INC.
Reviewed By: ' -f-'~.
SMH/bg
Distribution: DaI-Mac Construction - Damon Norman SHW Group - Mike Elmore
City of Coppell - Larry Davis JRJ Paving - Jeff Williford
Coppeil lSD - Mickey Harper
SHW Group - Joe Craddock