Loading...
SC-Coppell HS-LR 990902FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppel! )SD, c,/o Dal - Mac Construction Co, REPORT DATE: September 2, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 SAMPLE DATE: August 24, 1999 CONTRACTOR: Dal Mac TICKET NO.: 76037 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 105 PLANT/TRUCK: 976/7 CONCRETE TEMP. (°F) (ASTM C.1064): 92 MIX ID NUMBER: 16 TIME BATCHED: 3:48 AIR (%) (ASTM C-231): TIME SAMPLED: 4:30 WATER ADDED (gal): 10 WEATHER CONDITION: PartJy cloudy SLUMP (in.) (ASTra C.143,~: 5 LOCATION OF PLACEMENT: Grade beams at A6 and AE CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 49 7 08/31/99 92000 3250 3000/28 days CHC 50 28 09/21/99 CHC 51 28 09/21/99 CHC 52 Hold ~ Fracture mo~e is (A) unless otherv.,ise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof [~] [~ [~ U Curing: Melhods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. Reviewed By: '~ J ' SMH/rm Distribution: DaI-Mac Construction- Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Oalias, Texas 75229 Ph (972)484-8301; Fax (972) 820-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 2, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 SAMPLE DATE: August 24, 1999 CONTRACTOR: Dal Mac TICKET NO.: 76002 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 103 PLANT/TRUCK: 7/802 CONCRETE TEMP. (°F) (ASTM C.t0S4): 90 MIX ID NUMBER: 16 TIME BATCHED: 2:47 AIR (%) (ASTM C-231): TIME SAMPLED: 3:15 WATER ADDED (gal): 0 WEATHER CONDITION: Hot SLUMP (in.) (ASTM C-143): 5 LOCATION OF PLACEMENT: Grade beam at grid line A7.3 at AJ CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 45 7 08/31/99 77000 2720 3000/28 days CHC 46 28 09/21/99 CHC 47 28 09/21/99 CHC 48 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 TeslJng ASTM C-143, Typesof ~7l [-I-I I--/I r'-i Curing: Methods: ASTM C-39 Fracture: A[/~J [/~ ~.J L._JB C D REMARKS: Technician: David Putman FUGRO SOUTH INC. Reviewed By: SMH/rm Distribution: DaI-Mac Construction- Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. M 2880 Virgo Lane; Dallas. Texas 75229 Ph (972)484-8301: Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 2, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 SAMPLE DATE: August 24, 1999 CONTRACTOR: Dal Mac TICKET NO.: 76001 CONCRETE SUPPLIER: Lattimore AMBIENT TEMP. (°F): 98 PLANT/TRUCK: 757/8 CONCRETE TEMP. (°F) (ASTM C-1064): 87 MIX ID NUMBER: 16 TIME BATCHED: 12:23 AIR (%) (ASTM C-231): TIME SAMPLED: 1:10 WATER ADDED (gal): 5 WEATHER CONDITION: Partly cloudy SLUMP (in.) (ASTM C-143): 4.5 LOCATION OF PLACEMENT: Grade beam at grid line Al0 and AE CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 41 7 08/31/99 88000 3110 3000/28 days CHC 42 28 09/21/99 CHC 43 28 09/21/99 CHC 44 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, TYpes°f B ~]~] [~ r-~ curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. Reviewed By: ~ ~, ------" SMH/rm Distribution: DaI-Mac Construction- Damon Norman City of Coppell - Larry Davis Coppeil lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford