Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
SC-Coppell HS-LR 990901
FUGRO SOUTH, INC. ~ 2880 Virgo Lane: Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 1, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 DRILLING CONTRACTOR: Wylie Drilling Page 1 DATE PERFORMED: August 31, 1999 I Location: Depth Shaft to Plan Actual Total Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing Number in. Material flon ft. tion ft. ft. Alignment Presentm Used Remarks ff. 171 18.0 14.1 4.0 4.6 18.7 Yes Yes Yes G-G1 64 18.0 15.4 4.0 4.3 19.7 Yes Yes Yes G-G2 66 18.0 14.7 4.0 4.2 18.9 Yes Yes Yes G-G1.5 76 18.0 14.5 8.0 8.5 23.0 Yes Yes Yes GK-G.5 77 18.0 12.0 6.0 6.0 18.0 Yes Yes Yes GK.7-G.5 78 18.0 13.0 4.0 5.0 18.0 Yes Yes Yes GM-G.5 102 24.0 18.8 11.0 11.2 29.0 Yes Yes Yes GN-G2 63 18.0 14.0 4.0 4.0 18.0 Yes Yes Yes GA-Gl.5 120 24.0 15.0 11.0 11.0 26.0 Yes Yes Yes GN-G4 136 24.0 16.0 11.0 11.8 27.8 Yes Yes Yes GN-G5 145 24.0 17.0 13.0 13.0 30.0 Yes Yes Yes GN-G7 89 18.0 17.0 11.0 14.0 31.0 Yes Yes Yes GP-G1 88 18.0 19.0 10.0 10.0 29.0 Yes Yes Yes GN-G1 FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: September 1,199~' PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 DRILLING CONTRACTOR: Page 2 DATE PERFORMED: August 31, 1999 Location: Depth Shaft to Plan Actual Total Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing Number in. Material tion ft. tion ft. ft. Alignment Present(~ Used Remarks fl. 87 18.0 18.0 6.0 6.0 24.0 Yes Yes Yes ! GM-G1 Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Shale (~) Dudng ddlling operations; however, piers were dr,/pdor to .placement of conc.~ete. Thomas Cranford Fugro Technician FUGRO SOUTH INC. Reviewed By: --3'~...~..~.,.,_....,_ SMH/bg Distribution: DaI-Mac Construction- Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford