Loading...
SC-Coppell HS-LR 990830 (2) FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: August 30, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 DRILLING CONTRACTOR: Wylie Drilling Page 1 DATE PERFORMED: August 27, 1999 Location: Depth Shaft to Plan Actual Total Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing Number in. Material tion ft. tion ft. ft. Alignment Presentm Used Remarks ft. 108 18 16.1 8.0 8.0 24.1 Yes Yes Yes GC-G4 109 18 16.7 11.0 11.1 27.8 Yes Yes Yes GD-G4 110 18 17.0 8.0 8.0 25.0 Yes Yes Yes GE-G4 111 18 16.2 12.0 12.1 28.3 Yes Yes Yes GG-G4 Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Beadng Material: Gray Shale m During drilling operations; however, piers were dry prior to placement of concrete. Thomas L. Cranford Fugro Technician FUGRO SOUTH INC. Reviewed By: -'>"-'-- [~'--~-' ,, SMH/bg Distribution: DaI-Mac Construction- Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford