Loading...
SC-Coppell HS-LR 990816 FUGRO SOUTH, INC. ---~--'~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: August 16, 1999 PROJECT: Coppeli High School, Coppell, Texas PROJECT NO: 0791-2208 DRILLING CONTRACTOR: Page 1 DATE PERFORMED: August 9,1999 I Location: PAD A Depth Shaft to Plan Actual Total Pier Number Diameter Bearing Penetra- Penetra- Depth Proper Water Casing in. Material tion ft. tion ft. ft. Alignment Present~) Used Remarks ft. (A-9-AA) 16 18 14.1 10.0 11.0 25.1 Yes Yes Yes A-9-CA) 17 18 14.8 8.0 8.0 22.8 Yes Yes Yes (A-9-AB) 23 18 15.6 10.0 10.2 25.8 Yes Yes Yes (A-9-18.5) 18 15.1 8.0 8.0 23.1 Yes Yes Yes 30 (A-9-AE-5) 18 15.3 8.0 8,0 23.3 Yes Yes Yes 53 (A9-AC) 8 24 14.2 14.0 14.1 28.3 Yes Yes Yes (A9-AE) 45 24 16.0 14.0 14.3 30.3 Yes Yes Yes (A9-AG) 63 24 14.0 14.0 15.3 29.3 Yes Yes Yes (A9-AH) 75 24 15.5 13.0 13.1 28.6 Yes Yes Yes A7-AA 2 18 15.0 10.0 10.0 25.0 Yes Yes Yes A7-AA.3 4 18 15.0 6.0 6.0 21.0 Yes Yes Yes (A7.5-CA) 27 18 15.0 6.0 6.0 21.0 Yes Yes Yes (A7.5-AB) 24 18 14.5 6.0 6.0 20.5 Yes Yes Yes A9.5Ab.5 18 16.2 8.0 8.3 24.5 Yes Yes Yes (37) (A9.8-HB) 22 24 13.7 10,0 10.3 24.0 Yes Yes Yes (A9.8-AC) 37 24 16.3 10.0 10.0 26.3 Yes Yes Yes (A9.8-AE) 44 24 16.1 10.0 10.0 26.1 Yes Yes Yes (Ag.8-AE.5) 18 15.0 8.0 8.1 23.1 Yes Yes Yes 52 (A9-AC) 6 18 16.0 8.0 8.1 24.1 Yes Yes Yes FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, cJo Dal- Mac Construction Co. REPORT DATE: August 16, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 DRILLING CONTRACTOR: Page 2 I DATE PERFORMED: August 9, 1999 I Location: PADA Depth Shaft to Plan Actual Total Pier Number Diameter Bearing Penetra- Penetra- Depth Proper Water Casing in. Material tion ft. tion ft. ft. Alignment Present(i) Used Remarks ft. (A7.5-AK. 5) 18 15.7 6.0 6.0 21.7 Yes Yes Yes 97 (A7.5-AK) 18 15.0 8.0 8.0 23.0 Yes Yes Yes 109 Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Shale m During drilling operations; however, piers were dry prior to placement of concrete. Thomas Cranford Fugro Technician FUGRO SOUTH INC. SMH/br Distribution: DaI-Mac Construction- Damon Norman City of Coppell - Larry Davis-- Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. ~ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 FIELD DENSITY REPORT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. REPORT DATE: August 16, 1999 PROJECT: Coppell High School, Coppell, Texas PROJECT NO: 0791-2208 DATE PERFORMED: August 12, 1999 Density Test Method: ASTM D-2922 & 3017 Method of Compaction: ASTM D-698 MOISTURE/DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture (%) I Tan silty sandy clay with limestone fragments and 102.3 17.1 calcareous nodules TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 39 1 Building G & H subgrade, southeast 103.1 16.1 100.7 comer of Area G, 1st lift 40 1 Building G & H subgrade, southwest 102.0 17.1 99.7 corner of Area G, 1st lift 41 1 Building G & H subgrade, northeast 101.8 16.9 99.5 corner of Area H, 1 st lift 42 I Building G & H subgrade, northwest 103.1 17.8 101.0 corner of Area H, 1st lift 43 1 Building G & H subgrade, middle of pad, 102.8 18.5 100.4 1st lift Remark: Densities meet project specifications unless otherwise noted. Mike Flute Fugro South Technician FUGRO SOUTH INC. Reviewed By: SMH/bg Distribution: DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Terry Hoyle JRJ Paving - Jeff Williford