Loading...
SC-Coppell HS-LR000807FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: August 7, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: July 5, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-t064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 089185 85 86 7:10 8:10 CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C.231): WATER ADDED (gal): Lattimore Materials 7 / 755 38 15 Sunny SLUMP (in.) (ASTM C-143); 5.0 5 feet offfire lane north, 118 feet off tennis court south and 300 feet off of curb line further west CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 squ~re inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1314 7 07-12-00 77900 2760 3000/28 days CHC 1315 28 08-02-00 108700 3850 CHC 1316 28 08-02-00 106900 3780 CHC 1317 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ [~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Sammy Roberts FUGRO SOUTH INC. Reviewed By~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone // City of Coppell Larry Davis-~' Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: August 7, 2000 PROJECT: Coppell High School, Tennis CourtJParking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: July 5, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 107148 87 87 9:32 10:00 CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): Lattimore Materials 3 / 975 38 Sunny SLUMP (in.) (ASTM C-143): 4.0 100 feet off of northeast corner of stadium, 6 foot fence, 5 feet off of firelane, 13th parking lot entrance CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1318 7 07-12-00 69800 2470 3000/28 days CHC 1319 28 08-02-00 101300 3580 CHC 1320 28 08-02-00 104100 3680 CHC 1321 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Types of ~ [~ [~ [~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMHlrm Distribution: Sammy Roberts FUGRO SOUTH INC~ Reviewed By: ~----/c- DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, cio Dal - Mac Construction Co. Report Date: August 7, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: July 5, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 107168 89 88 12:52 1:30 CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): Lattimore Materials 3 / 1050 38 10 Sunny SLUMP (in.) (ASTM C-143): 5.0 5 feet off firelane, #2 driveway to the north, 2 feet off curb line CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1322 7 07-12-00 61500 2180 3000/28 days CHC 1323 28 08-02-00 100400 3550 CHC 1324 28 08-02-00 98300 3480 CHC 1325 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f ~ [~ [~;1 ~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Sammy Roberts FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford