SC-Coppell HS-LR000725FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Tennis Court/Parking Lot
Coppell, Texas
Report Date: July 25, 2000
Project No.: 0791-2208
DATE PERFORMED: July 20, 2000
General Contractor: Cortez Group
Method of Test:
Applicable ACI Recommendations and ^STM Standards
Results / Remarks:
Concrete placement observation was performed at the
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
Paving - Parking lot front section in front of all purpose
tennis court building
5:30 a.m.
2:00 p.m.
300
2.0 - 9.0
5.0
Lattimore Materials
80 - 100°F
3000/28
12
No
Plant No. 7
Sammy Roberts
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Lee Stone
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford