Loading...
SC-Coppell HS-LR000706FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo L~ne; D~llas, Tax~ 75229 Ph (972) 484-8301; Fax (972) 820-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: July 6, 2000 Project No.: 0791-2208 DATE PERFORMED: June 29, 2000 General Contractor: Cortez Group Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days):. Number of cylinders made: Superplasticizer used: Paving - 300 feet from fire lane north, 50 feet east off of west end of tennis court, 100 feet from southwest comer of tennis court east 6:30 a.m. 10:30 a.m. 200 4.5 to 5.0 3±1 Lattimore - Plant No. 7 85 - 89°F 3000/28 8 No Sammy Roberts Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484,.8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: July 6, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: June 28, 2000 CONTRACTOR: TICKET NO.: 106792 AMBIENT TEMP. (°F): 87 CONCRETE TEMP. (°F) (ASTM C.1064): 89 TIME BATCHED: 11:47 TIME SAMPLED: 12:20 WEATHER CONDITION: Partly cloudy LOCATION OF PLACEMENT: The Cortez Group CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3~966 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): 5 WATER ADDED (gal): 0 SLUMP (in.) (ASWa C-143): 4 Furthest west parking lot, 60 feet north of fire lane, and 10 feet west curb line CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1286 7 07/05/00 70700 2500 3000/28 days CHC 1287 28 07/26/00 CHC 1288 28 07/26100 CHC 1289 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ~"1 ['~ I""'l Curing: Methods: ASTM C-39 Fracture: AI/XJ [/%J [/~ L_JB C D REMARKS: Unit Weight: 144.1 lbs/cu, f. Technician: Sammy Roberts FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: July 6, 2ooo Project No.: 0791-2208 SAMPLE DATE: June 28, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-'1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 106749 88 91 7:08 8:30 Partly cloudy CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 3/966 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): 4.5 WATER ADDED (gal): 15 SLUMP (in.) (AS?M C-143): 3 Furthest west parking lot, 200 feet north of fire lane leave out and curb CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYMNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1282 7 07/05/00 83600 2960 3000/28 days CHC 1283 28 07/26/00 CHC 1284 28 07/26/00 CHC 1285 Hold Fracture mode is (A) unless othenvise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ ~'-~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Unit Weight: 148 lbs/cu, f. Technician: Sammy Roberts FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Taxa~ 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: July 6, 2000 Project No.: 0791-2208 SAMPLE DATE: June 28, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 106747 CONCRETE SUPPLIER: LMC 84 PLANT/TRUCK: 3/968 86 MIX ID NUMBER: 6:08 AIR (%) (ASTM C-231): 7:00 WATER ADDED (gal): 5 Warm SLUMP (in.) (ASTM C-t43): 4 Northwest comer of bleachers 2"d column grade beam, 3"~ grade beam 4m and 5~ grade beam CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1278 7 07/05/00 84400 2990 3000/28 days CHC 1279 28 07/26/00 CHC 1280 28 07/26/00 CHC 1281 Hold FraCtUre mode is (A) unless otherwise noted Speci§cafions: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: , Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Sammy Roberts FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By:~-- DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike EIm0re JRJ Paving - Jeff Williford