Loading...
SC-Coppell HS-LR000608FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: June 8, 2000 Project No.: 0791-2208 SAMPLE DATE: May 10, 2000 CONTRACTOR: Cortez TICKET NO.: 7086747 AMBIENT TEMP. (°F): 71 CONCRETE TEMP. (°F) (ASTM C-1064): 85 TIME BATCHED: 12:57 TIME SAMPLED: 1:10 WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/956 MIX ID NUMBER: 38 AIR (%) (ASTM C-23'1): 4.8 WATER ADDED (gal): 15 SLUMP (in.) (ASTM C-'143): 4 3/4 Tennis parking pavement east of Courts 11-12 150 feet east CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1038 7 05/17/00 78500 2780 3000/28 days CHC 1039 28 06/07/00 95300 3370 CHC 1040 28 06/07/00 99400 3520 CHC 1041 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ D Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Thomas Cranford FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: June 8, 2000 Project No.: 0791-2208 SAMPLE DATE: May 10, 2000 CONTRACTOR: TICKET NO.: 3104212 AMBIENT TEMP. (°F): 67 CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: 9:54 TIME SAMPLED: 10:45 WEATHER CONDITION: Overcast LOCATION OF PLACEMENT: CONCRETE SUPPLIER: PLANT/TRUCK: 3/1096 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): 4.9 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 5 Parking, east of Courts11 & 12, 30 feet east CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1024 7 05/17/00 81100 2870 3000/28 days CHC 1025 28 06/07/00 88200 3120 CHC 1026 28 06/07/00 95700 3390 CHC 1027 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~] ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 4848301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: June 8, 2000 Project No.: 0791-2208 SAMPLE DATE: May 10, 2000 CONTRACTOR: Cortez Group TICKET NO.: 7086735 AMBIENT TEMP. (°F): 70 CONCRETE TEMP. (°F) (ASTM C-1064): 85 TIME BATCHED: 11:33 TIME SAMPLED: 12:45 WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/757 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): 4.7 WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-14~): 5 Parking east of Courts 11 & 12, 90 feet east CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches .TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1028 7 05/17/00 71800 2540 3000~28 days CHC 1029 28 06107/00 95000 3360 CHC 1030 28 06/07/00 92600 3280 CHC 1031 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof ~] ~] ~ r-'] curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By:~-~ ? DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: June 8, 2000 Project No.: 0791-2208 SAMPLE DATE: May 10, 2000 CONTRACTOR: Cortez Group TICKET NO.: 7086759 AMBIENT TEMP. (°F): 79 CONCRETE TEMP. (°F) (ASTM C-10S4): 83 TIME BATCHED: 2:22 TIME SAMPLED: 3:15 WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7/757 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): 4.7 WATER ADDED (gal): 10 SLUMP (in.) (ASTra C-143): 5 Parking: Tennis Court, east of court, station 11 +12, east 190 feet CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12,, 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1042 7 05/17/00 65300 2310 3000/28 days CHC 1043 28 06/07/00 86000 3040 CHC 1044 28 06/07/00 86200 3050 CHC 1045 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f ~ ~ D D Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Thomas Cranford FUGRO SOUTH INC. SMH/rm Distribu~tion: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford