Loading...
SC-Coppell HS-LR000531FUGRO SOUTH, INC. i 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: May 31,2000 Project No.: 0791-2208 SAMPLE DATE: May 23, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-'1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 087286 CONCRETE SUPPLIER: LMC 90 PLANT/TRUCK: 7 / 1045 81 MIX ID NUMBER: 38 10:25 a.m. AIR (%) (ASTM C-231): 4.9 11:20 a.m. WATER ADDED (gal): 10 Sunny SLUMP (in.) (ASTM C-143): 5 1/2 Paving - parking lot, station 594 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1192 7 5-30-00 66300 2350 3000/28 days CHC 1193 28 6-20-00 CHC 1194 28 6-20-00 CHC 1195 H Hold Fracture mode is (A) unless Otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ ~ [~ ["'~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Yancey Bivings FUGRO SOUTH INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 31, 2000 Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 23, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 087279 CONCRETE SUPPLIER: LMC 89 PLANT/TRUCK: 7 / 955 82 MIX ID NUMBER: 38 9:15 a.m. AIR (%) (ASTM C-231): 10:00 a.m. WATER ADDED (gal): 10 Sunny SLUMP (in.) (ASTM C-143): 5 1 /4 Paving - parking lot, station 643 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1188 7 5-30-00 75400 2670 3000/28 days CHC 1189 28 6-20-00 CHC 1190 28 6-20-00 CHC 1191 H Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ~] ~ ~ , Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Yancey Bivings FUGRO SOUTH INC. SMH/bg Distribution: Reviewed By: ~'~ / DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. i 2880 Vi'go Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: May 31,2000 Project No.: 0791-2208 SAMPLE DATE: May 23, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 087268 CONCRETE SUPPLIER: LMC 87 PLANT/TRUCK: 7 / 958 81 MIX ID NUMBER: 38 7:55 a.m. AIR (%) (ASTM C-231): - 9:00 a.m. WATER ADDED (gal): 10 Sunny SLUMP (in.) (ASTM C-143): 5 1/4 Paving - parking lot, station 634 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1184 7 5-30-00 74900 2650 3000/28 days CHC 1185 28 6-20-00 CHC 1186 28 6-20-00 CHC 1187 H Hold Fracture mode is (A) unless other'wise noted Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/bg Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. i 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972)620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: May 31,2000 Project No.: 0791-2208 SAMPLE DATE: May 23, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 087255 CONCRETE SUPPLIER: LMC 71 PLANT/TRUCK: 7 / 755 80 MIX ID NUMBER: 38 6:32 a.m. AIR (%) (ASTM C-231): 5.2 6:55 a.m. WATER ADDED (gal): - Sunny SLUMP (in.) (ASTM C-143): 3 1/2 Paving - parking lot, station 490 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1176 7 5-30-00 78200 2770 3000/28 days CHC t177 28 6-20-00 CHC 1178 28 6-20-00 CHC 1179 Hold Fracture mode is (A) unless otherwise noted ' Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] [~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Yancey Bivings FUGRO SOUTH INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 31,2000 Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 23, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 087259 CONCRETE SUPPLIER: LMC 73 PLANT/TRUCK: 7 / 1042 81 MIX ID NUMBER: 38 7:05 a.m. AIR (%) (ASTM C-231) .' 7:35 a.m. WATER ADDED (gal): 5 Sunny SLUMP (in.) (ASTM C-143): 4.0 Paving - parking lot, station 504 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1180 7 5-30-00 87500 3100 3000/28 days CHC 1181 28 6-20-00 CHC 1182 28 6-20-00 CHC 1183 H Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ~ ~ ~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Yancey Bivings FUGRO SOUTH INC. SMH/bg Distribution: Reviewed By:_~_____________.~_/-- Dal-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford