Loading...
SC-Coppell HS-LR000526FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 26, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 18, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 2002529 87 81 9:40 am 11:45 am Cloudy Paving: CONCRETE SUPPLIER: LMC PLANT/TRUCK: 2/1105 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): WATER ADDED (gal): 15 SLUMP (in.) (ASTM C-143): 6 Parking lot, station 560 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTEO (pounds) (psi) (psi) CHC 1154 7 05/25/00 91300 3230 3000/28 days CHC 1155 28 06/15/00 CHC 1156 28 06/15/00 CHC 1157 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f ~ ~ ~ G Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Yancey Bivings FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis ~- Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vk~;~ Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: May 26, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 18, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-~1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087232 81 82 8:36 am 10:30 am Cloudy CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/1042 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-143): 6.50 Paving: Parking lot, station 583 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1150 7 05/25/00 90900 3220 3000/28 days CHC 1151 28 06/15/00 CHC 1152 28 05/15/00 CHC 1152 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°' [~ ~X~ ~u Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Tex~-~ 75P~9 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 26, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 18, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 3104789 71 82 7:21 am 8:05 am Cloudy Paving: CONCRETE SUPPLIER: LMC PLANT/TRUCK: 3/821 MIX ID NUMBER: 38 AIR (%) (AS?M C.231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C.143): 6 Parking lot, station 659 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1146 7 05/25/00 86300 3050 3000/28 days CHC 1147 28 06/15/00 CHC 1148 28 06/15/00 CHC 1149 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C'143, Types°f ~ [~ [~ 0 Curing: Methods: ASTM Co39 Fracture: A B C D REMARKS: Technician: Yancey Bivings FUGRO SOUTH INC. Reviewed By:~:::~~---~ SMH/rm Distribution: OaI-Mac Construction - Damon Norman City of Coppeil - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo ~ne; Dallas, Texas Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: Uay 26, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 18, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064); TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087210 70 81 6:15 am 7:05 am Cloudy CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/1054 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): 5.2 WATER ADDED (gal): 0 SLUMP (in.) (AS?M C.143): 5.50 Paving: Parking lot station 642 ' CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTEO (pounds) (psi) (psi) CHC 1142 7 05/25/00 86800 3070 3000/28 days CHC 1143 28 06/15/00 CHC 1144 28 06/15/00 C HC 1145 Hold Fracture mode is (A) unless otherwise noted Speci,ca,ons: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ~ ~ ~ Curing: Me~_nd_~: ASTM C-39 Fracture: A B C D REMARKS: Unit Weight: 144.2 lbs/cu, ft. Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ - DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike EImore JRJ Paving - Jeff Williford