Loading...
SC-Coppell HS-LR000525FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75_~_9 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 25, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: May 16, 2000 CONTRACTOR: The Cortez Group TICKET NO.: 7087110 AMBIENT TEMP. (°F): 87 CONCRETE TEMP. (°F) (ASTM C.1064): 82 TIME BATCHED: 1:10 TIME SAMPLED: 2:00 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTt~ C-231): WATER ADDED (gal): SLUMP (in.) (ASTM C.143): Paving: Parking lot, station 629 TXI 7/1092 38 5.1 2O 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1130 7 05/23/00 73700 2610 3000/28 days CHC 1131 28 06/13100 CHC 1132 28 06/13/00 CHC 1133 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Types°f ~ ~ ~ r~ curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 25, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 16, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087095 79 81 9:08 am 10:00 am Sunny Paving: CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/1039 MIX ID NUMBER: 38 AIR (%) (ASTM C-231): WATER ADDED (gal): 15 SLUMP (in.) (ASTM C.t43): 6 Parking lot, station 479 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1118 7 05/23/00 702000 2480 3000/28 days CHC 1119 28 06/13/00 CHC 1120 28 06/13/00 CHC 1121 Hold Fracture mode is '(A) unless otherwise noted .... Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~ [~ E] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Tex_=~_ 75'~ Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 25, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No,: 0791-2208 Coppell, Texas SAMPLE DATE: May 16, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087102 80 82 10:00 am 11:10 am Sunny CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7958 MIX ID NUMBER: 38 AIR (%) (ASTM C-251): WATER ADDED (gal): 15 SLUMP (in.) (ASTM C-143): 6 3/4 Paving: Parking lot, station 487 CONCRETE CYLINDER COMPRESSIVE STRENGTH I I=STS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1122 7 05/23/00 66300 2350 3000/28 days CHC 1123 28 06/13/00 CHC 1124 28 06/13/00 CHC 1125 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof ~ [~ [~ ~--'~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo lane; Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: May 25, 200o PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: May 16, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Trans Texas Tennis 1502260 CONCRETE SUPPLIER: TXI 80 PLANT/TRU C K: 41/474 82 MIX ID NUMBER: 8272 9:29 am AIR (%) (ASTM C-231): 10:30 am WATER ADDED (gal): 0 Sunny SLUMP (in.) (ASTM C-143): 5 Leaveout slab for Tennis Court 2 feet wide between Courts 1 and 3 and 2 and 4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYMNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) crc 1126 7 05/23/00 109900 3890 3500/28 days CHC 1127 28 06/13/00 crc 1128 28 06/13/00 CHC 1129 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A. B C D REMARKS: Technician: Yancey Bivings FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vtrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 25, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: May 16, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 7087085 73 80 8:10 am 8:45 am Sunny Paving: CONCRETE SUPPLIER: LMC PLANT/TRUCK: 7/958 MIX ID NUMBER: 38 AIR (%) (ASTM C-23'1): 4.8 WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-t43): 5.50 Parking lot, station 446 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 1114 7 05/23/00 79800 2820 3000/28 days CHC 1115 28 06/13/00 CHC 1116 28 06/13/00 CHC 1117 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Unit Weight: 144.4 lbs/cu, ft. Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford