Loading...
SC-Coppell HS-LR000524FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: May 24, 2000 Project No.: 0791-2208 SAMPLE DATE: May 15, 2000 CONTRACTOR: TICKET NO.: 3104515 AMBIENT TEMP. (°F): 73 CONCRETE TEMP. (°F) (ASTM C.10S4): 71 TIME BATCHED: 7:41 am TIME S.~,MPLEDi 8:20 am WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: Paving: The Cortez Group CONCRETE SUPPLIER: LMC PLANT/TRUCK: 3/746 MIX ID NUMBER: 38 AIR (%) (ASTM C-23'I): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 7.50 Parking lot. station 399 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da~/s) TESTED (pounds) (psi) (psi) CHC 1098 7 05/22/00 81000 2870 3000/28 days CHC 1099 28 06/12/00 CHC 1100 28 06/12/00 CHC 1101 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~] ~ ['"] Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Yancey Bivings FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~"~," DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: May 24, 2000 Project No.: 0791-2208 SAMPLE DATE: May 15, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: The Cortez Group 3104502 61 73 6:31 am 7:00 am Sunny CONCRETE SUPPLIER: LMC PLANT/TRUCK: 3/821 MIX ID NUMBER: 38 AIR (%) (ASTM Co231): 5.1 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 5.50 Paving: Parking lot, station 409 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6"x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da~) TESTED (pounds) (psi) (psi) CHC 1094 7 05/22/00 78200 2770 3000/28 days CHC 1095 28 06/12/00 CHC 1096 28 06/12/00 CHC 1097 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ p~] 0~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Unit Weight: 142.4 lbs/cu, f. Technician: Yancey Bivings FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ,~ Dal-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: May 24, 2000 Project No.: 0791-2208 DATE PERFORMED: May 23, 2000 General Contractor: The Cortez Group Method of Test: Applicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Paving - Parking Lot, north side lot following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 6:30 a.m. 11:40 a.m. 380 3.5 to 5.5 5.0 LMC - Plant.No. 7 80 - 82°F 3000/28 20 No Yancey Bivings Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford