Loading...
SC-Coppell HS-LR000508FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: May 8, 2000 Project No.: 0791-2208 SAMPLE DATE: April 10, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis 1552017 CONCRETE SUPPLIER: TXI 70.1 PLANT/TRUCK: 41/456 77.1 MIX ID NUMBER: 8204 1:47 pm AIR (%) (ASTM C-231): 2:18 pm WATER ADDED (gal): 5 Cloudy/windy SLUMP (in.) (ASTM C-'143): 6.50 Court #2, 25 feet south of north end, 20 feet east of west side CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da~/s) TESTED (pounds) (psi) (psi) CHC 888 3 04/13/00 61000 2160 3500/28 days CHC 889 7 04/17/00 96000 3400 CHC 890 28 05/08/00 136200 4820 CHC 891 28 05/08/00 134400 4750 CHC 892 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ ~ D Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMHlrm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: DaloMac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: May 8, 2000 Project No.: 0791-2208 SAMPLE DATE: April 10, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis 1551923 62.5 74.1 1:07 pm 1:32 pm Cloudy/windy CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/39 MIX ID NUMBER: 8204 AIR (%) (ASTM C-231): WATER ADDED (gal): 5 SLUMP (in.) (ASTM C-143): 5.50 Tennis Court #.4, 30 feet west of east side, 35 feet south of north end CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 883 3 04/13/00 58000 2050 3500t28 days CHC 884 7 04/17/00 94000 3330 CHC 885 28 05/08/00 138800 4910 CHC 886 28 05/08/00 141600 5010 CHC 887 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~;;1 ~-~ r-~ r-] Curing: Methods: ASTM C-39 Fracture: AV",J [/XJ VI I lB C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: '~"'~- ~~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: May 8, 2000 Project No.: 0791-2208 SAMPLE DATE: April 10, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis 1551738 CONCRETE SUPPLIER: TXI 61.9 PLANT/TRUCK: 41/456 71.5 MIX ID NUMBER: 8204 11:00 AIR (%) (ASTM C-231): 12:25 WATER ADDED (gal): 0 Cloudy/windy SLUMP (in.) (ASTM C-143): 6.50 Tennis Court #4, 8 feet west of east side, 30 feet north of south end CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYMNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 873 3 04/13/00 58000 2050 3500/28 days CHC 874 7 04/17/00 97000 3430 CHC 875 28 05/08/00 136200 4820 CHC 876 28 05/08/00 134500 4780 CHC 877 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] [~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: . ~'~- ~-~-/_~,.~..- DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD -Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 7529 Ph (972)484-8301; Fax (972)620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, ~o Dai- Mac Construction Co. Report Date: May 8, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 10, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.'1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis 1551834 CONCRETE SUPPLIER: TXI 67.8 PLANT/TRUCK: 41/453 75.6 MIX ID NUMBER: 8204 12:33 pm AIR (%) (ASTM C-231): 12:58 pm WATER ADDED (gal): 5 Cloudy/windy SLUMP (in.) (ASTM C-143): 5.50 Court #.4, 15 feet north of south end, 5 feet east of west side CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 878 3 04/13/00 60000 2120 3500/28 days CHC 879 7 04/17/00 99000 3500 CHC 880 28 05/08/00 139200 4920 CHC 881 28 05/08/00 140700 4950 CHC 882 Hold Fracture mode is (A) unless otherwise noted Making & ASTM C-31 Testing ASTM C-143, Typesof ~ ['~ ~'--~ r- Specifications: Curing: Methods: ASTM C-39 Fracture: AI~1 Y__~ Y__l I__JB C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: May 8, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 10, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trane Tex Tennis 1552115 CONCRETE SUPPLIER: TXI 70.6 PLANT/TRUCK: 41/453 75.6 MIX ID NUMBER: 8204 2:36 pm AIR (%) (ASTM C.231): 3:00 pm WATER ADDED (gal): 0 Cloudy/windy SLUMP (in.) (ASTM C-'143): 6.50 Court #2, 35 feet east of west side, 45 feet north of south end CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYMNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER Idays) TESTED (pounds) (psi) (psi) CHC 893 3 04/13/00 67000 2370 3500/28 days CHC 894 7 04/17/00 100000 3540 CHC 895 28 05/08/00 145200 5140 CHC 896 28 05/08/00 143200 5070 CHC 897 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ [~ [~ [-"~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: -~' DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford