Loading...
SC-Coppell HS-LR000421ilo FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 7522,3 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 21,2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 13, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Treans Tex Tennis 1553502 CONCRETE SUPPLIER: TXI 69 PLANTrrRUCK: 41/642 70 MIX ID NUMBER: 8204 10:02 am AIR (%) (ASTM C-23'1): 10:35 am WATER ADDED (gal): 0 Sunny SLUMP (in.) (ASTM C-143): 6 Slab southeast corner, 10 feet north, 3 feet west, Tennis Court #3 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 930 5 04/18/00 69000 2440 3500/28 days CHC 931 7 04120/00 85000 3010 CHC 932 28 05/11/00 CHC 933 28 05tl 1/00 CHC 934 Hold CHC 935 Hold Fracture mode is (A) unless otherwise noted SpecJflcafions: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~[~] ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: April 21, 2000 Project No.: 0791-2208 SAMPLE DATE: April 13, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis 1553588 CONCRETE SUPPLIER: TXI 70 PLANT/TRUCK: 41/462 71 MIX ID NUMBER: 8204 10:43 am AIR (%) (ASTM C-231): 11:10 am WATER ADDED (gal): 0 Sunny SLUMP (in.) (ASTM C-'143): 6.50 Slab, southwest corner, 4 feet north, 7 feet east, Tennis Court #3 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 936 5 04/18/00 68000 2410 3500/28 days CHC 937 7 04/20/00 91000 3220 CHC 938 28 05/11/00 CHC 939 28 05/11/00 CHC 940 Hold CHC 941 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ [-'~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 21, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project NO.: 0791-2208 Coppell, Texas SAMPLE DATE: April 13, 2000 CONTRACTOR: TICKET NO.: 1553655 AMBIENT TEMP. (°F): 69 CONCRETE TEMP. (°F) (ASTM C-1064): 71 TIME BATCHED: 11:45 am TIME SAMPLED: 12:10 pm WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/64 MIX ID NUMBER: 8204 AIR (%) (ASTM C-23t): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-t43): 5.50 Slab, northwest corner, 10 feet south, 2 feet east Tennis Court #3 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 942 5 04/18/00 23000 2230 3500/28 days CHC 943 7 04/20/00 87000 3080 CHC 944 28 05/11/00 CHC 945 28 05/11/00 CHC 946 Hold CHC 947 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~] ~ ~ ~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Viq;~o Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal- Mac Construction Co. Report Date: April 21, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 13, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis 1553746 CONCRETE SUPPLIER: TXI 69 PLANT/TRUCK: 41/713 71 MIX ID NUMBER: 8204 1:10 pm AIR (%) (ASTM C-251): 1:35 pm WATER ADDED (gal): 5 Sunny SLUMP (in.) (ASTM C-'143): 5.50 Slab, northwest comer 4 feet east, 7 feet south Tennis Court #1 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 954 5 04/18/00 66000 2340 3500/28 days CHC 955 7 04/20/00 81000 2860 CHC 956 28 05/11/00 CHC 957 28 05/11/00 CHC 958 Hold CHC 959 Hold Fracture mode is (A) unless other,vise no~eG Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] [~ [~ ["~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 21, 2000 PROJECT: coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 13, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis 1553686 CONCRETE SUPPLIER: TXI 68 PLANT/TRUCK: 41/70 72 MIX ID NUMBER: 8204 12:17 pm AIR (%) (ASTM C-231): 12:35 pm WATER ADDED (gal): 0 Sunny SLUMP (in.) (ASTM C-143): 6 1/4 Slab, southeast corner 4 feet west, 5 feet north Tennis Court #1 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYENDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 948 5 04/18/00 88000 3110 3500/28 days CHC 949 7 04/20/00 114000 4030 CHC 950 28 05/11/00 CHC 951 28 05/11/00 CHC 952 Hold CHC 953 Hold Fracture mode is (A) unless otherWise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ [~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Yancey Bivings FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Lee Stone City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford