Loading...
SC-Coppell HS-LR000420'-ma FUGRO SOUTH, INC. 2880 Virgo Lane, Dallas, Texas 75_~_~9 CLIENT: PROJECT: Ph (972) 484-8301; Fax (972) 620-7328 ELONGATION OF POST TENSION TENDONS REPORT Coppell lSD, c/o Dal- Mac Construction Co. PROJECT NO: 0791-2208 Coppell High School, Tennis Court/Parking Lot, Coppell, Texas Page 1 of 3 STRESSING DATE: April 20, 2000 On this date, a representative of Fugro South, Inc. monitored gauge readings and recorded elongations of post tension tendons at the above referenced project. Stressing operations were performed at the following locations Equipment used: Ram # 98-318 Gauge # 318 The machines were calibrated on 11-30-00 with Tennis Courts 6 and 8 and Tennis Court 2 7800 Pump # 354021 psi being the equivalent of 33 kips. Gauge readings and elongations are given on the following pages: Skip Martin Fugro South Technician FUGRO SOUTH, INC. Reviewed By: SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis -~ City of Coppell - Lee Stone Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford CLIENT: PROJECT: 2880 Virgo Lane, Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 ELONGATION OF POST TENSION TENDONS REPORT PROJECT NO: Page' I of STRESSING DATE: z-I....Z..,o *- -Z.,c~ On this date, a representative of Fugro South Inc. monitored gauge readings and recorded elongations of post tension tendons at the above referenced project. Stressing operations were performed at the following locations Equipment used: Ram # The machines were calibrated on I with "7~::)4~ psi being the equivalent of ~ kips. All stressing procedures appear to meet applicable specifications. There were no discrepancies unless noted othen~ise. Gauge readings and elongations are given on the following pages: Fugro-McClelland Technician Hours: ELONGATION OF POST TENSION TENDONS REPORT CLIENT: Co?iol~. [, ~. p. ~_/'~ I~x~F/x~: PROJECT NO: PROJECT: ~~L-L- ~ Page ~- STRESSING ~DATE= of .~ S md No. Type of Tendon Req'd Lilt-Off Final Elong (In) Lilt-Off Final Einng (in) Total Elong Elong % Rereads Cable Descdplion Elong (in) Pressure Pressure Pressure Pressure (in) ~: Color ...... (*1 ~ ' (:1) FUGRO SOUTH INC. ELONGATION OF POST TENSION TENDONS REPORT CLIENT: ~-z~PI~E~- I, 5, P. .c~/o D~LkXI~. PROJECT NO: PROJECT: c~p~ I~I~H _~--~'_~L. Page ~ STRESSING 'DATE: of LOCAllON: ,, First Second No. Type o! Tendon Req'd Uft~3ff Final EIo~l (In) Lift-Off Final Elong (in) To~; E~or~ Ebng % Rem~m Cable Descdplion Elong (in) Pressure Pressure Pressure Pressure (in) FUGRO SOUTH INC.