SC-Coppell HS-LR000420'-ma
FUGRO SOUTH, INC.
2880 Virgo Lane, Dallas, Texas 75_~_~9
CLIENT:
PROJECT:
Ph (972) 484-8301; Fax (972) 620-7328
ELONGATION OF POST TENSION TENDONS REPORT
Coppell lSD, c/o Dal- Mac Construction Co. PROJECT NO: 0791-2208
Coppell High School, Tennis Court/Parking Lot, Coppell, Texas Page 1 of 3
STRESSING DATE:
April 20, 2000
On this date, a representative of Fugro South, Inc. monitored gauge readings and recorded elongations of post tension tendons at the above referenced
project.
Stressing operations were performed at the following locations
Equipment used: Ram # 98-318 Gauge # 318
The machines were calibrated on 11-30-00 with
Tennis Courts 6 and 8 and Tennis Court 2
7800
Pump # 354021
psi being the equivalent of
33 kips.
Gauge readings and elongations are given on the following pages:
Skip Martin
Fugro South Technician
FUGRO SOUTH, INC.
Reviewed By:
SMH/bg
Distribution:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis -~
City of Coppell - Lee Stone
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
CLIENT:
PROJECT:
2880 Virgo Lane, Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
ELONGATION OF POST TENSION TENDONS REPORT
PROJECT NO:
Page' I of
STRESSING DATE: z-I....Z..,o *- -Z.,c~
On this date, a representative of Fugro South Inc. monitored gauge readings and recorded elongations of post tension tendons at the above referenced
project.
Stressing operations were performed at the following locations
Equipment used: Ram #
The machines were calibrated on I
with "7~::)4~ psi being the equivalent of ~ kips.
All stressing procedures appear to meet applicable specifications. There were no discrepancies unless noted othen~ise. Gauge readings and
elongations are given on the following pages:
Fugro-McClelland Technician
Hours:
ELONGATION OF POST TENSION TENDONS REPORT
CLIENT: Co?iol~. [, ~. p. ~_/'~ I~x~F/x~: PROJECT NO:
PROJECT: ~~L-L- ~ Page ~-
STRESSING ~DATE=
of .~
S md
No. Type of Tendon Req'd Lilt-Off Final Elong (In) Lilt-Off Final Einng (in) Total Elong Elong % Rereads
Cable Descdplion Elong (in) Pressure Pressure Pressure Pressure (in) ~:
Color ...... (*1 ~
' (:1)
FUGRO SOUTH INC.
ELONGATION OF POST TENSION TENDONS REPORT
CLIENT: ~-z~PI~E~- I, 5, P. .c~/o D~LkXI~. PROJECT NO:
PROJECT: c~p~ I~I~H _~--~'_~L. Page ~
STRESSING 'DATE:
of
LOCAllON: ,,
First Second
No. Type o! Tendon Req'd Uft~3ff Final EIo~l (In) Lift-Off Final Elong (in) To~; E~or~ Ebng % Rem~m
Cable Descdplion Elong (in) Pressure Pressure Pressure Pressure (in)
FUGRO SOUTH INC.