Loading...
SC-Coppell HS-LR000414 (2)FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: April 14, 2000 Project No.: 0791-2208 SAMPLE DATE: April 6, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis 1548302 CONCRETE SUPPLIER: TXI 59.6 PLANT/TRUCK: 41/462 70.5 MIX ID NUMBER: 8204 8:27 am AIR (%) (ASTM C-231): 3.0 8:52 am WATER ADDED (gal): 5 Clear/windy SLUMP (in.) (ASTM C-'143): 6 3/4 Court #6, 10 feet west of east side, 25 feet south of north end CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 828 4 04/10/00 66000 2340 3500/28 days CHC 829 7 04/13/00 83000 2940 CHC 830 28 05/04100 CHC 831 28 05/04/00 CHC 832 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM 0-31 Testing ASTM C-143, Typesof [~ ~] ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By:~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis "'"- Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Vtrgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: Apdl 14, 2000 Project No.: 0791-2208 SAMPLE DATE: April 6, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.t064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis 1548264 59.9 70 7:40 am 8:16 am Clear/windy CONCRETE SUPPLIER: TXi PLANT/TRUCK: 41/640 MIX ID NUMBER: 8204 AIR (%) (ASTM C-231): 2 3/4 WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-'143): 6 Court ~8, 70 feet north of south end, 20 feet west of east side CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 823 4 04/10/00 68000 2410 3500/28 days CHC 824 7 04/13/00 87000 3080 CHC 825 28 05/04/00 CHC 826 28 05/04~00 CHC 827 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Tesling ASTM C-143, Types°f ~] [~ [~ E Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell lSD, c/o Dal - Mac Construction Co. Report Date: April 14, 2000 PROJECT: Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 6, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Max / Trans Tex Tennis 1548126 54.1 69.8 6:42 am 7:17 am Clear/Windy CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/837 MIX ID NUMBER: 8204 AIR (%) (ASTM C-231): 2 3/4 WATER ADDED (gal): 0 SLUMP (in.) (ASWa C-'143): 5 Court #8, 5 feet west of east side, 40 feet north of south end CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYMNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 818 4 04/10/00 81000 2870 3500/28 days CHC 819 7 04/13/00 93000 3290 CHC 820 28 05/04/00 CHC 821 28 05/04~00 CHC 822 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C.31 Testing ASTM C-143. Typesof [~] [~] ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 VIrgo Lane; Dallas, Texas 75229 Ph (972) 4648301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT Coppell lSD, c/o Dal - Mac Construction Co. Report Date: Apdl 14, 2000 Coppell High School, Tennis CourtJParking Lot Project No.: 0791-2208 Coppell, Texas SAMPLE DATE: April 6, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Cortez Group 7085369 78.2 74.3 11:23 am 12:20 pm Clear/windy CONCRETE SUPPLIER: Lattimore PLANT/TRUCK: 7-757 MIX ID NUMBER: 42 AIR (%) (ASTM C.23~1): 4 WATER ADDED (gal): 5 SLUMP (in.) (ASTM C-'143): 5 3/4 Vomitory wall, 0.5-15.1 to 17.3 0.5 to Line B bottom half wall CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da}is) TESTED (pounds) (psi) (psi) CHC 843 7 04/13/00 89000 3150 4000/28 days CHC 844 28 05/04/00 CHC 845 28 05/04/00 CHC 846 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ ~ ~ r-1 curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By:~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Tennis CourtJParking Lot Coppell, Texas Report Date: April 14, 2000 Project No.: 0791-2208 SAMPLE DATE: April 6, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac / Trans Tex Tennis 1548592 70.2 75.6 10:04 am 10:40 am Clear/windy Tennis Court #6 CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/464 MIX ID NUMBER: 8204 AIR (%) (ASWa C-231): 4 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-'143): 5 1/4 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYENDER AGE DATE LOAD STRENGTH STRENGTH ,,NUMBER (days) TESTED (pounds) (psi) (psi) CHC 838 4 04/10/00 67000 2370 3500/28 days CHC 839 7 04/13/00 88000 3110 CHC 840 28 05/04/00 CHC 841 28 05/04/00 CHC 842 Hold Fracture mode is (A) unless othmwise noted Specificafl°ns: Making & ASTM C'31 Testing ASTM C'143, Typesof [~] [~ D D Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Phillip Forrest FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ ! DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301: Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: April 14, 2000 Project No.: 0791-2208 SAMPLE DATE: April 6, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac/Trans Tex Tennis 1548443 61.3 71.0 9:03 am 9:26 am Clear/windy CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/837 MIX ID NUMBER: 8204 AIR (%) (Aswa c.231): 3 WATER ADDED (gal): 5 SLUMP (in.) (ASTM C-143): 7 Tennis court ~t~, 40 feet south of north end, 20 feet east of west side CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CHC 833 4 04/10/00 74000 2620 3500/28 days CHC 834 7 04/13/00 87000 3080 CHC 835 28 05/04/00 CHC 836 28 05/04/00 CHC 837 Hold Fracture mode is (A) unless other,vise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/rm Distribution: Phillip Forrest FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford