SC-Coppell HS-LR000413FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane, Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
ELONGATION OF POST TENSION TENDONS REPORT
Coppell lSD, c/o Dal - Mac Construction Co.
Coppell High School, Tennis CourtJParking Lot, Coppell, Texas
STRESSING DATE: April 13, 2000
PROJECT NO: 0791-2208
Page 1 of 9
On this date, a representative of Fugro South, Inc. monitored gauge readings and recorded elongations of post tension tendons at the above referenced
project.
Stressing operations were performed at the following locations
Equipment used:
Tennis Courts 6 and 8 and 5 and 7
Ram # 97-218
The machines were calibrated on
Gauge # 218
Pump # 388610
3-24-00
with 7600 psi being the equivalent of
Gauge readings and elongations are given on the following pages:
33000 kips.
Mike Flute
Fugro South Technician
SMH/bg
Distribution:
FUGRO SOUTH, INC.
DaI-Mac Construction - Damon N.~orman
City of Coppell - Larry Davis '~
City of Coppell - Lee Stone
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford
FUGRO SOUTH INC.
2880 Virgo Lane, Dallas, Texas 7522;';
Ph (972) 484-8301; Fax (972) 620-7328
ELONGATION OF POST TENSION TENDONS REPORT
CLIENT: ,.~.~//,,.~_-.~. /£~./:~.,d~// _~'S~ PROJECT NO: ~7~/'~~
~ ~, .~ ~ Page I of ~
PROJECT: ~~// /~ S,
STRESSING DA~E:
On this date, a representative of Fugro South Inc. monitored gauge readings and recorded elongations of post tension tendons at the above referenced
project.
Stressing operations were performed at the following locations
Equipment used: Ram # C-1 '~ -- o~ t '~
The machines were calibrated on e~/,~ ~ /
,'/
Gauge fi o'~ [ ~' Pump fi
with '?~. c~O psi being the equivalent of ~ "~ ~..)¢.Y.~ kips.
All stressing procedures appear to meet applicable specifications. There were no discrepancies unless noted otherwise. Gauge readings and
elongations are given on the following pages:
Fugro South Technician
Hours :.
ELONGAT/ION OF POST TENSION TENDONS REPORT
CLIENT: ~(~¢1:;). ~z.~ ~. -~: %,~'~ /"Z'~[,.~.,-/f,~_ ~ PROJECTNO:
PROJECT: ~P/')L~({ '~r, ~-.-, -- T'"(~,.)rd ~ ~ cT'. Page
LOCATION: "/--¢',~w/~( .S ¢.~' ~ 1~ ~"
of
STRESSING DATE:
First Second
No, lylm el Tendon Roq'd Lilt-Oil Final Elong (In) LilI-OII Final Elono (in) Tolal Etono Elong % Remarks
Cable Description ElonII (in) Pressure Pressure Pressure Pressure
Color
~ ,.
ELONGAT, I_O.N OF POST TENSION TENDONS REPORT
CLIENT: Cc, ,~P .~ ~ [. -~ %' ~'P ./ ~-'~.//'~"//q' ~
PROJECT: ~c3D/2~([ ~r. c_..~. -- '["<:~), rtJ; ~; cT'. Page _.~
PROJECT NO: ~"~/*- ~'Z c~
STRESSING DATE:
No. lylm el Tendon Rml'd LI[I-OII Final Elong (in) LilI-OII Final Elong (in) Tolal Elontl Elonu % I{ummks
Calfla Description Eb~ll (in) Pressure Pressure Pressure Pfossuro
Color ,,,
~ ....... '1 .... _ . , , , .....
~ -
5~ ...... .__ ~,,,
I:.U[;I[tt:.h.I~('I,F.I,I,/~11E/$.O-U'I'IIWI~-'~l-'),.Iit£:,
CLIENT:
PROJECT:
ELONGATION OF POST TENSION TENDONS REPORT
PROJECT NO:
Page '~/
of ?
LOCATION:
STRESSING DATE: ~
Firsl Second
lylm el Tendon Rnq'd LifI-Ol!
CaMo Doscriplion Elmql (in) Pressure
Color
Final Elong (in) LiII-OI! Final
Pressure Pressure Pressure
Elong (bt)
Tolal Elonu
(i.)
Elony %
-.I.
Rommks
I.'U(j I{(.~:.M t ('!,1,:1.1,6 HIL~$f).UTIIW I~.~T),. IU C ....
ELONGATION OF POST TENSION TENDONS REPORT
CLIENT: Co f~ ~- ~ [ ~Z_' ~ ~'~ /"T~. {r~/~ ~ PROJECT NO:
PROJECT: ~O/')~([ ~-¥. ~-~, '- '{-~'~C~J; ~ cT. Page .~
ol
STRESSING DATE: ~ . 4./.~/~- 0 ~
- ' Firsl SecOnd
No. lylm al l'ondon Rml'd LiII-OII Final Elong (in} LIII.OII Finnl Elong (ill) Tolal Elonu Elong % Romalks
Calde Doscripllon Elontl (in) Pressure Pressure Pressure Pressure (iii)
Color
l![IGIl(.):.H (C hl~.l,l,6 NI~($[I. UTIIW ILST).. !~ f.:,
ELONGATION OF POST TENSION TENDONS REPORT
CLIENT: C_~ ?J) ~- ~ [, '~ %, ~') //"T~//'~'/~-/- ~ PROJECT NO:
PROJECT: C~D~([ ~. ~, -- ~~0; ~. C.T. Pago ~ al ~
Firsl Second
No. lypn al Tomlon Rml'd LtfI-Ol! Final Elong (in) LIII.OII Flnnl Llano (in) Total Elon[I Elonu % Remarks
Cnhle Descripllon Elon[I (in) Pressuro Pressure Pressure Pressure
Color
I ~ ~~ ~,ve~ .
I~ .._ ,,.
I~.gt;l[i.l~.hl~( '1,1':1,1,6 M ILlS .0. Lr r! I'W 1~..5'!.'h I~f.:,
ELONGATION OF POST TENSION TENDONS REPORT
CLIENT:
PROJECT: ~c~P~([ 'rjr. %, -- '~-~r~r~; 5; cT'.
L STRESSING DATE: ~
LOCATION: "'7~/'~, ' <::: "'- '~--~ 5 S nd
Ne. 'lypn el Tendon Re(I'd Lilt-OIl Final Elong {In) LilI.OII Final Einng (In) Total Elon~ Elonu % ~toma[ks
Cai)lo Doscriplinn Elonll (in) Pressure Pressure Pressure Pressure (in)
Color
~o .. 7~o~ _
F.t.I[;I[~3.-.~l~(.,I,I';I,I·6111L~$[i-iJl'IIWI~-'51-'),. II1
ELONGAT)ON OF POST TENSION TENDONS REPORT
CLIENT: (___o~:;~p.~'~ [ ~ ~'> /"('~.[r~/~- ~ PROJECTNO:
PROJECT: ~ -' T-~ ¢~'- Page
of
Ho. lylm of Tendon Roq'd Uti-Oil Final Ek~ (in) LllI-OII Flnnl EMnD (in) Tolal E~ Elong % Remarks
Cable Doscdplion Eb~ (in) Pressure Pressure Press~e Pressure (in)
Color ,
I~ ,, j ,,.
)~ .___ .... I ..
1~ ' .~ '
17 ,
~---- ~ I
I~.UIj II_().-.hl~ (~1,1';I ,I,6. I'1 IL(,5.0. Lrl'!l W 1~.,5 Ti,.
CLIENT:
PROJECT:
LOCATION:
ELONGATION OF POST TENSION TENDONS REPORT
First Soconil
No. lypo of Tendon Rntl'd Lift-Oil Final Elong (in} LIII-OII Final Elong (in) Tolal Elong Elong % Remarks
Cable DascdplDn E~ng (tn) Pressure Pressure Pressure Pmsswe (hr) t
Co~r
~ ...... ~ ~, ....