SC-Coppell HS-LR000413 (2)FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
CLIENT:
PROJECT:
OBSERVATION OF CONCRETE PLACEMENT
Coppell lSD, c/o Dal- Mac Construction Co. Report Date: April 13, 2000
Coppell High School, Tennis Court/Parking Lot Project No.: 0791-2208
Coppell, Texas
DATE PERFORMED: April 10, 2000
General Contractor: DaI-Mac
Method of Test:
Applicable ACI Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observat'ion was performed at the Tennis Court #2 and #4
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
12:10 p.m.
3:55 p.m.
242
5.5 to 6.5
5.0
TXI - Plant No. 41
61.9 - 77.1°F
3500/28
25
No
Phillip L. Forrest
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Damon Norman
City of Coppell - Larry Davis
Coppell lSD - Mickey Harper
SHW Group - Joe Craddock
SHW Group - Mike Elmore
JRJ Paving - Jeff Williford