Loading...
SC-Coppell HS-LR000410FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal- Mac Construction Co. Coppell High School, Tennis Cou~Parking Lot Coppell, Texas Report Date: April 10, 2000 Project No.: 0791-2208 DATE PERFORMED: April 6, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACl Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Tennis Court fi6 and fl8 Slab following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 7:00 a.m. 11:15 a.m. 243.5 5.0 to 7.0 5.0 TXI - Plant No. 43 69.8 - 75.6°F 3500128 25 No Phillip L. Forrest Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppeli - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppetl lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: Apd~ 10, 2000 Project No.: 0791-2208 DATE PERFORMED: April 7, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Tennis Court #5 and #7 following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 7:12 a.m. 11:00 a.m. 230 5-1/4- 6.5 5.0 TXI - Plant No. 41 62.8 - 80.2°F 3500/28 25 No Phillip L. Forrest Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell. Larry Davis~---- Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford