Loading...
SC-Coppell HS-LR000331FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 FIELD DENSITY REPORT Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: March 31, 2000 Coppetl High School, Tennis Court/Parking Lot, Coppell, Texas PROJECT NO: 0791-2208 DATE PERFORMED: March 28, 2000 Density Test Method: Number 1 ASTM D-2922 & 3017 MOISTURE/DENSITY RELATIONS Material Description Dark gray clay with some gravel TEST PROCTOR NO. NO. 211 1 212 1 213 1 214 1 215 1 LOCATION Method of Compaction: ASTM D-698 Proctor Results Maximum Dry Density (pcf) 107.4 TEST RESULTS UNIT DRY MOISTURE WEIGHT CONTENT PERCENT Tennis Court Parking Lot Fill Area tested 107.6 at 100 feet east of tennis court and 150 feet south of north end, 9th lift Tennis Court Parking Lot Fill Area tested 103.9 at 200 feet east of tennis court and 250 feet north of south end, 9u' lift Tennis Court Parking Lot Fill Area tested 101.7 at 300 feet east of tennis court and 300 feet north of south end, 9u~ lift Tennis Court Parking Lot Fill Area tested 101.7 at 400 feet east of tennis court and 150 feet north of south end, 9th lift Tennis Court Parking Lot Fill Area tested 103.0 at 400 feet east of tennis court and 250 feet north of south end, 9th lift 17.8 Optimum Moisture (%) 17.0 PERCENT OF MAXIMUM DENSITY 100.2 20.0 96.7 22.0 95.0 16.8 95.0 16.7 95.9 Remarks: All densities meet project specifications unless otherwise noted. Jose Rivera Fugro South Technician FUGRO SOUTH INC. SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Coppell lSD, c/o Dal - Mac Construction Co. Coppell High School, Tennis Court/Parking Lot Coppell, Texas Report Date: March 31,200 Project No.: 0791-2208 DATE PERFORMED: March 28, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Tennis Courts #10 and 12 following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 11:00 a.m. 2:30 p.m. 230 5.5 to 6.5 5.0 TXI - Plant No. 41 75 - 85°F 3500/28 20 No Jose Rivera Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 DRILLED PIER OBSERVATION REPORT CLIENT: Coppell lSD, c,/o Dal - Mac Construction Co. PROJECT: Coppell High School, Tennis CourtJParking Lot, Coppell, Texas DRILLING CONTRACTOR: Street Foundation Report Date: March 31,2000 Project No,: 0791-2208 Page 1 DATE PERFORMED: March 28, 2000 Location: Storage Shed North Side of Court Depth Shaft to Plan Actual Total Pier Diameter Bearing Penetra- Penetra- Depth Proper Water Casing Number in. Material tion ft. tion ft. ft. Alignment Present(~) Used Remarks ff. 3 18 27.8 9.0 9.3 37.1 Yes Yes(z) Yes 4 18 31.5 9.0 10.2 41.7 Yes No No 2 18 28.7 9.0 9.0 37.9 Yes Yes Yes 1 18 29.5 9.0 9.1 38.6 Yes Yes Yes Reinforcing steel checked in all piers and found to be in accordance with project requirements, unless otherwise noted. Bearing Material: Gray Shale (1) During drilling operations; however, piers were dry prior to placement of concrete. (2) Used casing to seal off water Phillip Forrest Fugro Technician SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford FUGRO SOUTH INC. Reviewed By: _"'~.-'~'~. ~./~--~ _ FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Coppell lSD, c/o Dal- Mac Construction Co. REPORT DATE: March 31,2000 Coppell High School, Tennis CourtJParking Lot, Coppell, Texas PROJECT NO: 0791-2208 DATE PERFORMED: March 29, 2000 Density Test Method: Number 1 2 TEST NO. 216 ASTM D-2922 & 3017 MOISTURE/DENSITY RELATIONS Material Description Maximum Dry Density (pct} Dark brown silty clay with some organics 96.1 Dark gray clay with some gravel 107.4 218 2 103.3 TEST RESULTS PROCTOR' LOCATION UNIT DRY NO. WEIGHT 1 Borrow Pit, 15 feet north and 20 feet 97.6 east of parking lot, 10t~ lift 217 2 Borrow Pit, 20 feet north and 125 feet 106.3 east of parking lot, 10t~ lift Borrow Pit, 12 feet north and 100 feet west of parking lot, 10"' lift All densities meet project specifications unless otherwise noted, Remarks: Method of Compaction: ASTM D-698 Proctor Results Optimum Moisture (%) 18.9 17.0 MOISTURE PERCENT OF CONTENT PERCENT MAXIMUM DENSITY 20.2 101.5 16.0 98.9 17.8 96.2 Thomas Cranford Fugro South Technician FUGRO SOUTH INC. SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: