Loading...
SC-Coppell HS-LR000313FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Coppell lSD, c/o Dal - Mac Construction Co. REPORT DATE: March 13, 2000 Coppell High School, Tennis Court/Parking Lot, Coppell, Texas PROJECT NO: 0791-2208 DATE PERFORMED: March 8, 2000 Density Test Method: Number 1 2 ASTM D-2922 & 3017 MOISTURE/DENSITY RELATIONS Material Description Medium brown silty sandy clay with some gravel Medium brown silty clayey sand with gravel (select) TEST PROCTOR NO. NO. 172 1 173 1 174 2 175 2 TEST RESULTS LOCATION Method of Compaction: ASTM D-698 Borrow Pit at north end of parking, center lane, 1st lift Borrow Pit at south end of parking, center lane, 2"d lift Proctor Results Maximum Dry Density (pcf) Optimum Moisture (%) 91.7 25.7 123.0 11.0 Borrow Pit at Pad #6 Court, final Borrow Pit, Court #7, final UNIT DRY MOISTURE PERCENT OF WEIGHT CONTENT PERCENT MAXIMUM DENSITY 88.3 24.3 96.3 89.2 28.3 97.3 118.2 10.5 96.1 117.0 12.4 95.1 Remarks: All densities meet project specifications unless otherwise noted. Thomas Cranford Fugro South Technician FUGRO SOUTH INC. SMH/bg Distribution: DaI-Mac Construction - Damon Norman City of Coppell - Larry Davis Coppell lSD - Mickey Harper SHW Group - Joe Craddock SHW Group - Mike Elmore JRJ Paving - Jeff Williford Reviewed By: