Loading...
Riverside Church-CS 950217 COPPELL UTILITIES MEMORANDUM DATE: February 17, 1995 /~. ........ . TO: Larry Davis, Construction Inspector '"~..~// FROM: Howard L. Pafford, Utilities 8uper~ntendent~.~__%~ RE: Walk-Through for Riverside Church of Christ A water/sewer walk-thru was conducted at the above referenced development this morning and the following items were found to be deficient. * There needs to be a locking hasp welded on the vault lid. * The sanitary sewer cleanout needs a cleanout shoe casted in concrete over the top of it. * Uncover the fire hydrant valve and repour the pad around it. * Mark the curb (W)for water meters,(V) for water valves and (CO) for sewer cleanout. * The valve for the fire vault should be raised and the pad repoured. Please ensure that these items are corrected prior to final acceptance of this project. If you have any questions,please advise. HLP/hp COPPELL PUBLIC WORKS MEMORANDUM DATE: February 17, 1995 TO: Larry Davis, Construction Inspector FROM: Rey Gonzales, Streets Superintendent~ RE: Riverside Church of Christ Walk Through 2/17/95 The following deficiencies were noted during our above referenced walk through. Please insure that the contractor receives a copy of this punch list. - ALL THREE(3) DRIVE APPROACHES NEED TO BE CLEANED AND SEALED INCLUDING THE REDWOOD HEADERS - NORTH OF SOUTH DRIVE - CURB NEEDS TO BE REPAIRED - HEADWALLS NEED TO BE INCORPORATED AT THE RCP DISCHARGE AND INLET ON BELT LINE RD. CURRENTLY SHOWING SIGNS OF EROSION. IT WOULD BE OUR RECOMMENDATION TO INCORPORATE A CONNECTING FLUME BETWEEN THE DISCHARGE AND THE WYE INLET. Please let me know when a follow up walk through is needed. Thank you. /rg CHURCHWT.RG