Loading...
Riverside Church-CS 940117 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 January 17, 1994 Ms. Betsy Del Monte Urban Architecture 7001 Preston Road//210 Dallas, TX 75205 RE: Riverside Church of Christ Development Fee Assessment Dear Ms. Del Monte: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Riverside Church of Christ. Please provide a check made payable to the City of Coppell in the amount of $15,625.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer cc: Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: January 17, 1994 Project: Riverside Church of Christ TOTAL AMOUNT DUE ASSESSMENT PRIOR TO COUNCIL APPROVAL Water Impact Fee $ 12,025.00 $ 12,025.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 300.00 -0- (100%due at Issuance of Building Permi0 Wastewater Impact Fee $ 3,600.00 $ 3,600.00 (100% due prior to Council Approval) Utility Final Inspection Fee $ 50.00 -0- (100%due at Issuance of Building Permit) Water Meter Fee (Lots) $ 2,034.11 -0- (100%due at Issuance of Building Permi0 Water Meter Deposit $ 105.00 -0- (100%due at Issuance of Building Permit) TOTAL $18,114.11 TOTAL AMOUNT DUE PRIOR TO $15,625.00 COUNCIL APPROVAL + Construction Inspection Fen~ (2% of Project Cost due prior to preconstruction meeting) * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: January 11, 1994 TO: Ken Griffin, P.E., City Engineer FROM: Howard n. Pafford, Utilities Superintendent RE: Development Fees for Riverside church of Christ' The following fees should be assessed on the above referenced project: Water Impact Fee: 1 - 2" Domestic Meter/s = 8 ESU's 1 - 2" Irrigation Meter/s = 8 ESU's 1 - 6" Fireline Meter = 2.5 ESU's Total 18.5 ESU's ~ $650.00 ea = S12.025.00 100% due prior to Council approval of final plat. Wastewater Impact Fee: 1 - 2" Domestic Meter = 8 ESU's Total 8 ESU's @ $450.00 ea = $ 3,600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections @ $100.00 each = $ 300.00 100% due prior to issuance of building permit. Utility Final Inspection Fee 1 lots @ $50.00/lot = $50.00 100% due prior issuance of building permit. Development Fees Page 2 Water Meter Fee 1 - 2" Domestic Meters @ $205.10 ea = $ 205.10 1 - 2" Irrigation Meter @ $296.84 ea = $ 296.84 1 - 6" Fireline Meter @ $1,532.17 ea = $1,532.17 Total = $2,034.11 100% due prior to issuance of water meters. Water Meter Deposit 3 meters @ $35.00 ea = $105.00 100% due prior to issuance of water meters. cc: Steven G. Goram, Director of Public Works Riverside Church of Christ File Building Inspections FEES.CHURCHCH.HLP