Loading...
Riverside Church-CS 931216 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE #: Riverside Church of Christ, Final Plat P & Z HEARING DATE: December 16, 1993 C. C. HEARING DATE: January 11, 1994 LOCATION: At the northwest corner of Belt Line Road and North Lake Drive (east of Denton Tap Road). SIZE OF AREA: 6.50 acres of land CURRENT (C) Commercial and (LI) Light Industrial ZONING: REQUEST: Approval of a final plat to allow the construction of a church. APPLICANT: Riverside Church of Christ John C. Hawkins & Associates, Inc. 150 S. Denton Tap Road Tom Belt #117 1600 Redbud Boulevard Coppell, TX 75019 Suite 207, Box 10 McKinney, TX 75069 (214) 548-2678 HISTORY: No history on this parcel. TRANSPORTATION: Subject site is served by Beltline Road along the southern border. Beltline Road at this location, is presently a substandard 2-lane asphalt roadway. Future plans call for a six-lane divided thoroughfare (P6D). Item 20 SURROUNDING LAND USE & ZONING: North - Mini-warehouses; Light Industrial zoning. South - Northlake Power Plant East Light manufacturing; Light Industrial zoning. West Light manufacturing; Light Industrial zoning. COMPREHENSIVE PLAN: A commercial designation has been assigned to this area since it is one of the "gateways" into the City. ANALYSIS: The building's front orientation is along North Lake Drive. Landscape plans reflect the requirements of the Street Scape plan. The structure is proposed to be a two-story building at this time. Future expansion is an option for the development, for this site will still have ample space to construct another building as the church expands its membership. Coppell's city limit boundary, runs along Beltline Road, just south of the future church site, and the boundary should be indicated on the plat and plans. In accordance with the regulations of the Subdivision ordinance, escrow should be provided for Beltline Road. The escrow is $160 per foot of frontage. The applicant wishes to appeal the escrow requirement, and a request has been made to the City Council, in order to waive the requirement. Staff recommends approval of the final plat. ALTERNATIVES: 1) Approve the final plat 2) Deny the final plat 3) Modify the final plat ATTACHMENTS: 1) Final plat 2) Landscape plans rivcofc.pp