Loading...
Riverside Church-LR011022 TRINITY ENGINEERING / KLEINFELDER 2211 Century Center Bivd, Suite 101, irving, Texas 7.~062 972-870.0808 Metro 972-953-0398 Fax 972~870-0802 TO: Riverside Church of Christ PROJECT: Riverside Church of Christ 150 E. Beltline Road Coppell, Texas Coppell, Texas 75019 Project No.: 10645 RI=PORT DATE: 10t2212001 REPORT NO.: 1001243 Page 1 of_ 2 ..... Test date: 10/18/2001 Technician: C. Miller Trinity Engineering t Klelnfelder's representative was on the job site to perform the following work: 4 Piers: 2-24", and 2-18" Depth to primary: 1. Depth to primary - original 2. Depth at which casing set. Penatratlon staffed at this point. COPIES TO: 2- Client, Attn: Greg McGahey TRINITY ENGINEERING i KLEINFELDER 1- K.B. Alexander, Attn: David Turner Attn: La~ Davie - ( Affn: Lee Stone 1- V. Aubmy Helium ~chitec~, Affn: Bob Bandy Wm. Duane Harreit, P.E. 1- MIIleff Englne~ng Group, Affn: John Mlileff, P.E. ~e rea~ ~o~ on I~ m~o~ ere for t~e exclusive uae ~ the dlenl for ~om ~ey were ~tain~ ~d a~y ~ly to t~ s~s lesled a~o¢ Inspe~ed. Th~ a~ n~ inl~eea to be 10/24/200! 12:12 9728?00802 TRINITY ENGR-DALLAS PAGE 03 ,~ 2211 Cerl[ury Center Blvd., Suite 101, Irving, Texas 75052 97:2-870-0808 Metro 972-953-0398 Fax 972-870-0802 STRAIGHT SHAFT PIER REPO~ TO: Riverside Church of Christ PROJEC'~' Riverside Church of Chr~t 150 E. Beitline Road (' _Cop, pe. IIL.Tex.a.s /' Coppel], Texas 75019 ~Project No,: 10~1~ Test Date: 10/18/2001 Report Date: 10/22/2001 Technician: C. Miller Report No: 1001243 Page 2 of 2 , 'iDE. NTiFiCATiON ...... MARK 26 33 35 34 SHAFT DIAMETER PLAN/ACTUAL 24"/28" 18"/22" 24"/28" 18"/22" TOP OF 3' BELOW 3' BELOW 3' BELO-W ..... :~"BELOW PIER ELEVATION ' FLOOR FINISH FLOOR FINISH FLOOR FINISH FLOOR FINISH DEPTH TO PRIMARY 31.0'/30.0' 33.3'/30.5' 32.6'/30.5' 32.7?30.5' TOTAL DEPTH OF PIER 36.4' 38.4' 38.0' 38.2' PRIMARY PENETRATION PLAN/ACTUAL 5,0'/5.4' 5.0'/5.1' 5.0'/5.1' 5.0'/5.5' STEEL CASING DIAMETER / DEPTH 24"/28' 18"/31' 24"/29' 18"/29' PLUMBNESS VARIATION WITHIN WITHIN WITHIN WITHIN TOLERANCE TOLERANCE TOLERANCE TOLERANCE TIME DRILLING COMPLETED 9:45 AM 12:05 PM 1:40 PM 3:15 PM STEEL CAGE LENGTH 35.0' 37.6' 37.0' 37.0' REBAR QUAN,/SIZE 35/~3 25/~3 3'~/~3 25/#3 HORIZONTALNERTICAL 6/#5 6,~4 $/#~ CONDIT[ON OF PIER CLEAN CLEAN CLEAN CLEAN BEFORE CONCRETE DRY DRY DRY DRY TIME CONCRETE PLACEMENT 10:15 AM 3:55 PM 3:25 PM 4:10 PM Remarks: ' - Top of pier elevation obtained from construction drawings Reports to: 2- Client, Attn: Greg McGahey 1- K.B, Alexander, Attn; David Turner TRINITY ENGINEERING I KLEINFELDER Attn: Lam/Davis At'tn: Lee Stone 1- V. Aubrey Hallum ,-%'~hite~s, Attn; BeD Bandy 1- Millett Engineering Group, Attn: John Millett, P.E. Wm. Duane Harrell, P.E. TRINITY ENGINEERING I KLEINFELDER 2211 Century Center Blvd. Suite 101, Irving, Texas 7'5062 972-870-0808 Metro 972-953-0398 Fax 972-870-0802 TO: Riverside Church of Christ PROJECT; Riverside Church of Christ 150 E. Beltline Road Coppell, Texas Coppell, Texas 75019 Project No.: 10645 REPORT DATE: 10/22/2001 REPORT NO.: 1001234 Test date: 10/16/2001 Technician: C. Miller Trinity Engineering / Kleinfelder's representative was on the job site to drill piers. Started work on pier ~f48, plans call for 30" pier but the casing diameter was 32". Water was encountered in a sand and gravel layer just above the bearing strata. The casing was set into the top of the bearing strata and the pier was finished with a 30" hole. After cleaning the pier steel was set and the pier was filled with concrete. Test cylinders were made for the concrete in pier ff47. COPIES TO: 2- Client, Attn; Greg McGahey TRINITY ENGINEERING i KLElNFELDER 2- City of Co~pell (fax) Attn; Larry Davis ...... A~: Lee Sto~e 1- V. Aubmy Helium Archl~c~, A~: ~b Bandy W~, Duane Harrell, P.E. 1- MIIleff Englneeflng Group. A~n: J~n Milleff, TRl ll¥ E GINI=£RI G I 2211 Century Center Blvd,, Suite 101, Irving, Texas 75062 972-870-0808 Metro 972-953-0398 Fax 972.870-0802 STRAIGHT SHAFT PIER REPORT TO: Riverside Church of Christ PROJECT: Riverside Church of Christ 150 E Beltline Road Coppe[I, Texas Coppell, Texas 75019 Project No.' 10645 Test Date: 10/16/2001 Report Date; 10t22/2001 Technician: C. Miller Report No: 1001234 Page 2 of 2 IDENTiFIGAT'IC~ ..... ' MARK 48 47 SHAFT DIAMETER P LAN/ACT UAL 30"/32" 30"/32" ...... TOP OF' ........ 2,$, BELOw 2.6' BELOW - PIER ELEVATION ~ FINISH FLOOR FINISH FLO~)R DEPTH TO PRIMARY 32.1'/28.0' 32.1'/30.0' TOTAL DEPTH OF PIER 37.5' 38.2' PRIMARYPENETRATION PLAN/ACTUAL 5.0'/5.4' 5.0'/6.1' STEEL CASING DIAMETER / DEPTH 30"/30.0' 30"/30.0' PLUMBNES$ VARIATION WITHIN WITHIN TOLERANCE TOLERANCE TIME DRILLING COMPLETED 11:45 AM 2:24 PM STEEL CAGE LENGTH 33.5' 38.0' REBAR QUAN./SIZE 35/~3 3e/~:~ .... HORIZONTAL/VERTICAL g/~ g/#$ CO~blTI'ON OF PIER CLEAN CLEAN ..... BEFORE CONCRETE DRY DRY TIME CONCRETE PLACEMENT 1:20 PM 3:25 PM Remarks: - Top of pier elevation obtained from construction drawings Reporte to: 2- C~ient, Attn; Greg MFGahey 1- K.B. Alexander, Affn: David Turner TRINITY ENGINEERING I KLEINFELDER Attn: Larry Davis Attn: Lee Stone 1- V. Aubrey Hallum Architects, Attn: Bob Bandy ........... 1- MIIlett Engine®ring Group, Attn: John M[llett, P.E. Will, Duane Harrell, P.E. 10/24/2001 12:12 9728700802 TRINITY ENGR-DALL~S PAGE A TRINITY ENGINEERING / KLEINFELDER 2211 Century Center Blvd, Suite 101, Irving, Texas 75062 ~ 972-870-0508 Metro 972-953-0398 Fax 972-870-0802 TO: Riverside Church of Christ PROJECT: Riverside Church of Christ 150 E. Beltline Road Coppell, Texas Coppell0 Texas 75019 Project No.: 10645 REPORT DATE: 10/22/2001 REPORT NO,: 1001233 ............ . .... , .......... Pa~e 1 of 2 Test date: 10/17/2001 Technician: C, Miller Trinity Engineering / Kleinfelder's representative was on the job site to perform the following work: 4 - Piers: 2 - 30", and 2 - 18" Depth to primary: 1. Initial depth to primary. 2. Depth casing set - penetration of primary started at this point. The following is a brief account of the days events. Drilling sump hole for pier #37, pier driller hit andJ'uptured the new gas line. The line was not charged but will have to be repaired, Drilling sump hole for pier #39, pier driller hi.~t and broke the phone line for R.C,C. Drilling pier ~40, pier drilIer hit a water line. Drilling pier ~v, 1 pier driller hit but did not dama~le an electrical line. COPIES TO: 2- Client, Attn: Greg McGahey TRINITY ENGINEERING I KLEINFELDER 1- K.B. Alexander, Attn: David Turner Attn: Larry Davis · Attn: Lee Stone 1-V. Aubrey Helium ArChitect~, ^ttn: BOI~ Bandy Wm. Duane Ha~rell0 P.E. 1. MIIlett Engineering Group. Attn; John MIIlett, P,E. A TRINITY ENGINEERING / KLEINFELDER 2211 Century Canter Blvcl., Suite 10"1, Irving, Texas 75062  97~-870~0808 Metro 972-~53-0398 Fax 972-870-0802 STRAIGHT SHAFT PIER REPORT TO: Riverside Church of Christ PROJECT: Riverside Church of Ctlrist 150 E. Beltline Road Coppell, Texas Coppell, Texas 75019 Project No.: 10645 Test Date: 10/17/2001 Report Date: Technician: C. Miller Report No: 1001233 Page 2 of 2 IDi~i~ITi't~iC'A~-'i'bN .............. .. ..... ,. ,,.. ,. MARK 37 36 40 41 SHAFT DIAMETER " PLAN/ACTUAL 30"/32" 30"/32" 18"122" 18"I22" TOPOF '3. o' BEL'~W 3.0' BELOW" 3.0' BELOW 3.0' BELOW PIER ELEVATION ' FLOOR FINISH FLOOR FINISH FLOOR FINISH FLOOR FINISH DEPTH TO PRIMARY 32,5731.5' 31.8'/30,0' 32.4'/30.4' 32,4731.2' TOTAL DEPTH OF PIER 37,5' 37,6' 38.1' 38.5' PRIMARY PENETRATION ....... PLAN/ACTUAL 5.0'/5,0' 5,0'/5,8' 5.0?5.7' 5.0'/6,1' STEEL CASING DIAMETER / DEPTH 30'/30.0' 30?30.0' 30'I30.0' 30'/30.0' PLUMBNESS VARIATION WITHIN WITHIN WITHIN WITHIN TOLERANCE TOLERANCE TOLERANCE TOLERANCE TIME DRILLING COMPLETED 8:50 AM 9:55 AM 12:05 PM 2:33 PM STEEL ' ' CAGE LENGTH 34.6' 38,0' 360' 360' REBAR (~iJ~N.)SIZE 37/~3 38//~3 25/~3 24/#3 .... HORIZONTALNERTICAL CONDITION OF PIER CLEAN CLEAN CLEAN '" CLEAN BEFORE CONCRETE DRY DRY DRY DRY TIME CONCRETE PLACEMENT 11:35 AM 10:12 AM 4:00 PM 3:10 PM ~emarks: - Top of pier elevation obtained from construction drawings Reports to: 2- Client, At[n: Gceg McGahey 1- K.R. Alexander, Attn: David Turner TRINITY ENGINEERING / KLEINFELDER Attn: Larry Davis Attn: Lee Stone 1 - V. Aubrey Helium Architects, A~tn: Bob Bandy "' 1- Millett Engineering Group, Attn: John Mtltett, P.E. WITh Duane Harrell, P.E. II