Loading...
Riverside Church-LR0110151(~,/16,,,'20~1 ~9:~:2 9728788882 TRINITY ENGR-DALLA$ PAGE 02 A TRINITY ENGINEERING / KLEINFELDER 221 ~ Century Center Blvd. Suite 101. Irving,' Texas 75062 ~ 972-870.0805 Metro 972-953.0398 Fax 972-870-0802 TO: Riverside Church of Christ PROJECT: Riverside Church of Christ 150 E. Belt[ina Road Coppell, Texas Coppell, Texas 75019 Project No,: 10645 REPORT DATE: 10/15/2001 REPORT NO.: 1001053 Test dete: 10/9/2001 Technician: M. Escalante Trinity EngineerJng/Kleinfelder's representative was on site on this date as scheduled. However, drilling was cancelled. COPIES TO.' 2- Client, Attn: Greg McGahey TRINITY ENGINEERING I KLEINFELDER 1- K.B. Arexander. Attn: Dav;~d Turner 2- City of Coppell (fax) Affn: Larry Davis Attn: Lee $~one 1- V_ Aubrey Hailum Architects, Attn: Bob Bandy Wm. Duane Harrell, P.E. 1- Mlllett Englneedng Group, Attn; Joi~n Millet't. P,E. The reSulm Se~,,'n on Ihla eepOr~ are for tl~e ex¢lualve uae of 10/15/2001 03:42 9728700802 TRINITY ENGR-DALLAS PAGE 03 TRINITY ENGINEERING / KLEINFELDER 2211 Century Center Bird, Suite 101, Irving, Texas 75062 972-870-0808 Metro 9727953-0398 Fax 972.870-0802 Riverside ChurcJ~ of Christ PROJECT: Riverside Church of Christ 150 E. Re[tline Road Coppell, Texas Col3peI1, Texas 75019 Project No,: 10645 REPORT DATE; 10/16/2001 i~EPORT NO.: 1001052 Test date: 10/8/2001 Technician: M, Escalante Trinity Engineering / Kleinfetder*s represntatJve was oin the job site at 7:00 am, The drill rig arrived at 8:30 am. TE/K technician noticed first thing that the casing was not long enough. The teciqnician notified the job supertntendant of the problem, at this time It was also determined that the drill rig was to small to dig a 30' pier. The decision was made to use another drilling company, The scheduled work for the day was cancelled, COPIES TO: 2- Clienl, Attn: Greg McGahey TRINITY ENGINEERING / KLEINFELDER 1- K.B. Alexander. Attn: David Turner Attn: Larry Davis , Attn: Lea Stone 1- v. Aubrey Hallum Archltect~, At-tn: Bob Bandy Wm. Duane Harm[i, 1- Millet1 Engineering Group, Attn: Jol~n MJ[Jett, The reaulls sh~,~n ~n (hl~, ~eport are ¢o¢ the .x~l~slve u.~e of the Client l~' whom ~ey were obtained end apply only {o {he sampl.~, teeteO and/o¢ i~p~cte{I. T~t~y ere riot in{ended {o b~