Riverside Church-LR 941118REPORT OF EXCAVATION OBSERVATION
ENGLNEERING, INC.
Date of Service: 11/18/94 Report No. 941837
Clienl No. 74767500 Project No. 43-1069-94
Client: Jones-Buie Construction Co. Project: Riverside Church of Christ
17000 Dallas Pkwy., Suite 200 Coppell, Texas
Dallas, Texas 75248
On this date, HBC Engineering technician arrived at above jobsite as scheduled to veri~ the
excavated area under slab (see attached drawing).
The contractor had removed the required 12 inches of soil, plus extra depth.
Technician: T. Morgan Time: 7:30 a.m. - 9:30 a.m.
Report Distribution: H~ Engineering, Inc.
{1) Riverside Church of Christ
(2) Jones-Buie Construction Company