Loading...
Riverside Church-LR 941118REPORT OF EXCAVATION OBSERVATION ENGLNEERING, INC. Date of Service: 11/18/94 Report No. 941837 Clienl No. 74767500 Project No. 43-1069-94 Client: Jones-Buie Construction Co. Project: Riverside Church of Christ 17000 Dallas Pkwy., Suite 200 Coppell, Texas Dallas, Texas 75248 On this date, HBC Engineering technician arrived at above jobsite as scheduled to veri~ the excavated area under slab (see attached drawing). The contractor had removed the required 12 inches of soil, plus extra depth. Technician: T. Morgan Time: 7:30 a.m. - 9:30 a.m. Report Distribution: H~ Engineering, Inc. {1) Riverside Church of Christ (2) Jones-Buie Construction Company (1) Urban Architecture (1) City of Coppell arbour Vice President 309AK This report is exclusively for the use of the chent indicated above and shall not be reproduced except in fuli without the written approval of HBC Engineering. Inc.