Loading...
Riverside Church-LR 940623 ~'qGIN~, ~,'C. FIELD REPORT OF CONCRETE MIX INSPECTION AND TESTS REPORT NO. 940453 DATE OF PLACEMENT: 6/2.3/94 PROJECT NO. 43 = 1069=94 PROJECT NAME: Riverside Church of Christ CUENT NO. 74767500 CUENT NAME: Riverside Church of Christ CONTRACTOR: Jo~cs-B[/ic CONCRETE SUPPLIER: PLACEMENT LOCATION: MIX DESIGN INFORMATION Design Strenglh: _X_. Compressive Flexural 3000 psi at 28 days Cement Factor: sacks/cubic yard Design Mix No. 8203 MATERIALS USED: SSD WEIGHT & QUANTITIES / CU. YD. ° Cement/Fly Ash: lbs. * Fine Aggregate: lbs. * Coarse Aggregate: lbs. * Admixture: /yard * Admixture: /yard Total Water: 9allons Water/Cement Ratio: gallons/sack Slump (Design): 4" * As reported by batch plant. PLACEMENT INFORMATION Air Content: 5.0 % Temperature: 92° Ambient/94° Concrete Concrete Placed: 30 cubic yards Weather: Partly cloudy Placement Time: Started: ]2:03 pm __ Stopped: ] :39 pm __ Cylinders Made: 4 Time Sampled: CYLINDER ACTUAL TOTAL COMP./FLEX. OR BEAM AGE OATE SLUMP LOAD STRENGTH LOCATiON/REMARKS MARK (DAYS) TESTED (inches) (pounds) (psi) I - I 7 06/30/94 4.0 84,070 2,970 1-2 28 07/21/94 4.0 I-3 28 07/21/94 4.0__. Aver_age 28 days - 1-4 Hold Hold 4.0 Technician: Tracv Morgan / .. Time: Started: 11:30 am Stopped: 2:00 pm REPORT OF IN-PLACE DENSITY TESTS I'"BC 474?. Irving Boulevard, Su::¢ 206 Dallas, Texas 7524~ Client: Riverside Church of Christ Date: 06/23/94 Coppell, Texas Project No. 43-1069-94 Project: Riverside Church of Christ Report No. 940449 Client No. 74767500 Laboratory Test Method: ASTM D-698 Moisture Optimum Density Require_m~nt M/D No. Material Description % (PCF) '-Moisture Density 1 Medium tan clay 23.2 96.4 at or about 92% 2 Dark gray clay 21.0 100.3 at or about 92°/6 Field Test Method: ASTM D-2922 / D-3017 FIELD DENSITY TEST MID Moisture Dry Density Density Test No. Test Location No. % (PCF) __ % Location: Grade Beam, Backfill 1 South side, final 2 18.4 98.7 98.4 2 West side, final 2 17.0 101.7 101.3 3 North side, final 1 21.4 89.3 92.6 Complies except where noted (*). Technician: Dennis Taylor Start: 11:00 am Stop: 12:30pm HBC ENGINEERING, INC. Report Distribution: (1) Riverside Church of Christ ~i~ (2) Jones-Buie Construction (1) Urban Architecture . (1) City of Coppell 302KG Th.$ repc~ is exclusively f=-r '.Ce use of the Cllen! indlcat, e-3 above anc stla'l r,o! be reproduced exceD! ir- fuU w,fl'cu! lhe Written aFproval cf HEC Engineeqng. !nc.