Riverside Church-LR 940603
FIELD REPORT OF CONCRETE MIX INSPECTION AND TESTS Page 1 of REPORT NO. 940328 DATE OF PLACEMENT: 6/3/94 PROJECT NO. 43- ] 069-94 PROJECT NAME: Riverside Church of Christ CLIENT NO. 747675000 CLIENT NAME: Riverside Church of Christ CONTRACTOR: Jones-Buie Construction CONCRETE SUPPLIER: P~CEMENTtOC^T~O,: East half of north parking area (see drawing for sampling locations). MIX DESIGN INFORMATION Design Slmngth: ._X_ Compressive __ Flexural 3000 psi at 28 days Cement Factor: sacks/cubic yard Design Mix No. MATERIALS USED: SSD WEIGHT & QUANTITIES / CU. YD. * CementJFly Ash: lbs. * Fine Aggregate: lbs. * Coarse Aggregate: lbs. * Admixture: /yard * Admixture: /yard Total Water: gallons Water/Cement Ratio: gallons/sack Slump (Design): 4" *As reported by batch plant. PLACEMENT INFORMATION Air Content: 2 % Temperature: 80° Ambient/92° Concrete Concrete Placed: 3 10 cubic yards Weather: Partly Cloudy ............. Placement Time: Started: 9: ] 5 air .......... Stopped: 4:3 0 ~ITI Cylinders Made: 4 lime Sampled: 10220 am CYLINDER ACTUAL TOTAL COMPJFLEX. OR SEAM AGE DATE SLUMP LOAD STRENGTH LOCATION/REMARKS MARK (DAYS) TESTED (inches) (pounds) (psi) 1- l 7 06/10/94 4.0 76,380 2,700 1-2 28 07/01/94 4.0 115,050 ._ 4,070 ......... 1-3 28 07/01/94 4.0 .... 120,730 .... 4,270 .... Average 28 _d~.~:s_-_ 4 ! '(!) ........ 1-_.4__ ..... Hold Hold .......... 4.0 .......... ~.../ ~ Technician: David H_a_mm_~tt .._ Time: Started: 7200 am Stopped: 5230 pm FIELD REPORT OF CONCRETE MIX INSPECTION AND TESTS Page 2 of 3 REPORT NO. 940328 DATE OF PLACEMENT: 6/3/94 PROJECT NO. 43-1069-94 PROJECT NAME: Riverside Church of Christ CLIENT NO. 747675000 CLIENT NAME: Riverside Church of Christ CONTRACTOR: Jones-Buie Construction CONCRETE SUPPLIER: TXI P~CEME,X'OC^T,O.: See drawing MIX DESIGN INFORMATION Design Strenglh: _X_ Compressive __ Flexural 3000 psi at 28 days Cement Factor: sacks/cubic yard Design Mix No. MATERIALS USED: SSD WEIGHT & QUANTITIES / CU. YD. * Cement/Fly Ash: lbs. * Fine Aggregate: lbs. * Coarse Aggregate: lbs. * Admixture: /yard * Admixture: /yard Total Water: gallons Water/Cement Ratio: gallons/sack Slump (Design): 4" * As reported by batch plant. PLACEMENT INFORMATION Air Content: ) % Temperature: 83° Ambient/94° Concrete Concrete Placed: cubic yards Weather: Partly Cloudy Placement Time: Started: 9; 15 am Stopped: 4:30 pm Cylinders Made: 4 Time Sampled: __ ]2;0~0_ pm CYLINDER ACTUAL TOTAL COMP./FLEX. OR BEAM AGE DATE SLUMP LOAD STRENGTH LOCATION/REMARKS MARK (DAYS) TESTED (inches) (pounds) (psi) 2- ] 7 06/10/94 4.0 67,290 2,380 ...... 2-2 28 07/01/94 4.0 93.730 3,320 2-3 28 07/01/94 4.0 96,340 3,410. Average 28 days - 3370 __ 2-4_ Hold Hold 4.0 Technician: David Hammett Time: Started: 7:00 am Stopped: ....5:_3_0 pm FIELD REPORT OF OONORETE MIX INSPEOTION AND TESTS Page 3 of 3 REPORT NO. 940328 DATE OF PLACEMENT: 6/3/94 PROJECT NO. 43-1069-94 PROJECT NAME: Riverside Church of Christ CUENT NO. 747675000 CUENT NAME: Riverside Church of Christ ............... CONTRACTOR: Jones-Buie Construction CONCRETE SUPPLIER: TXI PLACEMENT LOCATION: __ .See drawing __ _ ......... MIX DESIGN INFORMATION Design Strength: _.X_ Compressive __ Flexural __ ____ 3000 psi at 28 days Cement Factor: sacks/cubic yard Design Mix No. _._ MATERIALS USED: SSD WEIGHT & QUANTITIES / CU. YD. * Cement/Fly Ash: lbs. * Fine Aggregate: lbs. * Coarse Aggregate: lbs. * Admixture; /yard * Admixture: /yard Total Water: __gallons Water/Cement Ratio: gallons/sack Slump (Design): *As reported by batch plant. PLACEMENT INFORMATION Air Content: ] % Temperature: 85° Ambient/96° Concrete Concrete Placed: cubic yards Weather: Partly Clpudy Placement Time: Started: 9:15 am Stopped: 4:30 p_m Cylinders Made: 4 Time Sampled: 2:30 pm CYLINDER ACTUAL TOTAL COMP./FLEX, OR BEAM AGE DATE SLUMP LOAD STRENGTH LOCATION/REMARKS MARK (DAYS) TESTED (inches) (pounds) (psi) 3-1 7 06/10/94 4.0 69,490 _ _2,.4_60 ........ 3-2 28 07/01/94 4.0 l 01,660 3,600 3-3 28 07/01/94 410 10~.,~)0 ~,630 Average 28 days - .)6,0 3-4 Hold Hold 4.0 ....... . __~__.~__ Technician: David Hammett _ --_~~---' Time: Started: 7:00 am Stopped: 5:30 pm