Loading...
Riverside Church-LR 940601 FIELD REPORT OF CONCRETE MIX INSPECTION AND TESTS Page I of 4 REPORT NO. 940302 DATE OF PLACEMENT: 6/1/94 PROJECT NO. 43-1069-94 PROJECT NAME: Riverside Church of Christ CLIENT NO. 7476?5000 CLIENT NAME: Riverside Church of Christ CONTRACTOR: Jones-Buie Construction CONCRETE SUP~m~: TXI PLACI=MENT LOCATION:West half of north parking area MIX DESIGN INFORMATION Design Strenglh: _X_ Compressive ~ Flexural 3000 psi at 28 days Cement Factor: sacks/cubic yard Design Mix No. 8203 MATERIALS USED: SSD WEIGHT & QUANTITIES / CU. YD. * Cement/Fly Ash: lbs. * Fine Aggregate: lbs. ° Coarse Aggregate: lbs. * Admixture: /yard * Admixture: /yard Total Water: gallons Water/Cement Ratio: gallons/sack Slump (Design): 4 * As reported by batch plant. PLACEMENT INFORMATION Air Content: 5.0 % Temperature: 70° Ambient/85° Concrete Concrete Placed: 400 cubic yards Weather: Partly' Cloudy Placement Time: Started: 7507 am Stopped: ] :5 ] pm Cylinders Made: ] 6 Time Sampled: 7:4] am CYLINDER ACTUAL TOTAL COMP./FLEX. OR BEAM AGE DATE SLUMP LOAD STRENGTH LOCATiON/REMARKS MARK (DAYS) TESTED (inches) (pounds) (psi) 1-1 7 06/08/94 4.0 66,480 2,350 1-2 28 06/29/94 4.0 95.760 3,390 1-3 28 06/29/94 4.0 87.920 3,110 Average 28 day - 3250 1-4 Hold Hold __. 4.0 /Q ~./.._~/~ Technician: Tracv Morgan ....... Time: Started: 7:00 am~ Stepped: 2:00 pm F_'q ~, D,-C. FIELD REPORT OF CONCRETE MIX INSPECTION AND TESTS Page 2 of 4 REPORT NO. 940302 DATE OF PLACEMENT: 6/]/94 PROJECT NO. 43-1069-94 PROJECT NAME: Riverside Church of Christ CUENT NO. 747675000 CLIENT NAME: Riverside Church of Christ CONTRACTOR: Jones-BuJe Construction CONCRETE SUPPLIER: TXI PLACEMENT LOCATION: West half of north p.a~king area MIX DESIGN INFORMATION Design Strength: _X_ Compressive __ Flexuml 3000 psi at 28 days Cement Factor: sacks/cubic yard Design Mix No. 8203 MATERIALS USED: SSD WEIGHT & QUANTITIES / CU. YD. * Cement/Fly Ash: lbs. * Fine Aggregate: lbs. * Coarse Aggregate: lbs. * Admixture: /yard * Admixture: /yard Total Water: gallons Water/Cement Ratio: gallons/sack Slump (Design): 4 *As reported by batch plant. PLACEMENT INFORMATION Air Content: 5.0 % Temperature: 74° Ambient/86° Concrete Concrete Placed: cubic yards Weather: Partly Cloudy Placement Time: Started: 7:07 &m Stopped: ] :$ ! Dm Cylinders Made: ] 6 l~me Sampled: 8:45 am CYLINDER ACTUAL TOTAL COMP./FLEX. OR eEAM AGE DATE SLUMP LOAD STRENGT,'4 LOCATION/REMARKS MARK (DAYS) TESTED (inches) (pounds) (psi) 2-1 7 06/08/94 4.0 84:010 2,970 2-2 28 06/29/94 4.0 111,250 3,940 2-3 28 06/29/94 4.0 111,430 3,940 Average 28 day- 3940 2-4 Hold Itold 4.0 lechnician: Tracv Mor~,an Timo: Started: 7:00 am Stopped: 2:00 pm FIELD REPORT OF CONCRETE MIX INSPECTION AND TESTS Page REPORT NO. 940302 DATE OF PLACEMENT: 6/1/94 PROJECT NO. 43-1069-94 PROJECT NAME: Riverside Church of Christ CUENT NO. 747675000 CUENT NAME: Riverside Church of Christ CONTRACTOR: Jones-Buie Construction CONCRETE SUPPLIER: TXI PL~CEaE.T LOC^nON: _. West half_o_f north parking area ..... MIX DESIGN INFORMATION Design Strength: _X_ Compressive __ Flexural 3000 psi at 28 days Cement Factor: sacks/cubic yard Design Mix No. 8203 MATERIALS USED: SSD WEIGHT & QUANTITIES / CU. YD. * Cement/Fly Ash: lbs. ' Fine Aggregate: lbs. * Coarse Aggregate: lbs. * Admixture: /yard * Admixture: /yard Total Water: gallons Water/Cement Ratio: gallons/sack Slump (Design): 4 *As reported by batch plant. PLACEMENT INFORMATION Air Content: 5. ] % Temperature: 78© Ambient/87© Concrete Concrete Placed: cubic yards Weather: Partly Cloudy Placement ~me: Started: 7:07 am Stopped: ]: 51 pm Cylinders Made: 16 Time Sampled: ] CYLINDER ACTUAL TOTAL COMP./FLEX. OR SEAM AGE DATE SLUMP LOAD STRENGTH LOCATiON/REMARKS MARK (DAYS) TESTED (inches) (pounds) (psi) 3-1 7 06/08/94 4.0 79,800 2,820__ 3-2 28 06/29/94 4.0 113,1 O0 4,000 3-3 28 06/29/94 4.0 113,510 4,020 Averag? 28 day - 4010 Technician: Tracv Mo_r. gan _ Time: Started: 7:00 am Stopped: 2:00 pm___.. FIELD REPORT OF CONCRETE MIX INSPECTION AND TESTS Page 4 of 4 REPORT NO. 940302 DATE OF PLACEMENT: 6/1/94 PROJECT NO. 43-1069-94 PROJECT NAME: Riverside Church of Christ CUENT NO. 747675000 CUENT NAME: Kiverside Church of Christ CONmACTOR: Jones-Buie Construction CONCRETE SUPPLIER: TXI PLACEMENT LOCATION: West half of north parking area MIX DESIGN INFORMATION Design Strength: _.X_ Compressive __ Flexural 3000 psi at 28 days Cement Factor: sacks/cubic yard Design Mix No. 8203 MATERIALS USED: SSD WEIGHT & QUANTITIES / CU. YD. ' Cement/Fly Ash: _ lbs. * Fine Aggregate: lbs. ' Coarse Aggregate: lbs. * Admixture: /yard ° Admixture: /yard Total Water: gallons Water/Cement Ratio: gallons/sack_ Slump (Design): 4 *As reported by batch plant. PLACEMENT INFORMATION Air Content: 5.0 % Temperature: 80° Ambient/86° Concrete Concrete Placed: _ _ cubic yard. s__ Weather: Partly__.C_loudy ......... Placement Time: Started: 7:07 am Stopped: 1:51 _pm Cylinders Made: 16 Time Sampled: 12:34 pm CYLINDER ACTUAL TOTAL COMP ,/FLEX. OR BEAM AGE DATE SLUMP LOAD STRENGTH LOCATION/REMARKS MARK (DAYS) TESTED (inches) (pounds) (psi) 4-1 7 06/08/94 4.0 81,080 2,870 4-2 28 06/29/94 4.0 .... 123,65.0 4,370 4-3 28 06/29/94 4.0 116.510 4,120 Avcyage 28 day - 4250 __~-4 Hold Hold .......... -_4.0 __ ~/7,,~_~ Technician: Tr_acy_.~-!p_rgan ........ Time: Started: 7:00 am Stopped: 2:00 pm