Loading...
Riverside Church-LR 940509REPORT OF SOIL-LIME PULVERIZATION TESTS ENGINEERRqG, INC. 4747 Iv,'ing Boulevard, Suite 206 Dallas. Texas 75247 Client: Riverside Church of Christ Date: 05/09/94 Project No. 43-1069-94 Project: Riverside Church of Christ Report No. 940200 Coppell, Texas Client No. Test Location: East side paving area Specification Requirements: Minimum Passing 100 Sieve: 1 1/2" Minimum Passing 60 Sieve: ~f4 Sample Condition: Field moisture Total Sieve Size: I 112" Sieve Size: ~4 Test Sample Weight Percent Percent Weight Percent Percent No. Test Location Weight Retained Retained Passing Retained Retained Passing 1 West side of drive at south end of building. 10 lbs. 1 10 90* 2 Retest of#l, this report. 10 lbs. 0 0 100 4 lbs. 40 60 3 Center of drive at north end of building. 10 lbs. 0 0 100 3.0 lbs. 30 70 Complies except ~vhere noted (*). Technician: Dennis Taylor Start: 10:00 am Stop: 11:30 am 12:30 pm 1:30 pm HBC ENGINEERING, INC. Report Dis, ri bution: ~~Dx~, ..~ (1) Riverside Church of Chdst (2) Jones-Buie Construction Co. (1) Urban Architecture · (1) City of Coppell E. Eugene Harbour 303KG This report ~s exc~us~','e!y fo' l".e use of the cl,er', ma:ca:ed al.eve and shah not be reproducecJ except m fu;I w~thout the wr~len approval of HBC Engineering. Inc.