Riverside Church-LR 940509REPORT OF SOIL-LIME PULVERIZATION TESTS
ENGINEERRqG, INC.
4747 Iv,'ing Boulevard, Suite 206
Dallas. Texas 75247
Client: Riverside Church of Christ Date: 05/09/94
Project No. 43-1069-94
Project: Riverside Church of Christ Report No. 940200
Coppell, Texas Client No.
Test Location: East side paving area
Specification Requirements:
Minimum Passing 100 Sieve: 1 1/2"
Minimum Passing 60 Sieve: ~f4
Sample Condition: Field moisture
Total Sieve Size: I 112" Sieve Size: ~4
Test Sample Weight Percent Percent Weight Percent Percent
No. Test Location Weight Retained Retained Passing Retained Retained Passing
1 West side of drive at south end of
building. 10 lbs. 1 10 90*
2 Retest of#l, this report. 10 lbs. 0 0 100 4 lbs. 40 60
3 Center of drive at north end of
building. 10 lbs. 0 0 100 3.0 lbs. 30 70
Complies except ~vhere noted (*).
Technician: Dennis Taylor
Start: 10:00 am Stop: 11:30 am
12:30 pm 1:30 pm HBC ENGINEERING, INC.
Report Dis, ri bution: ~~Dx~, ..~
(1) Riverside Church of Chdst
(2) Jones-Buie Construction Co.
(1) Urban Architecture ·
(1) City of Coppell E. Eugene Harbour
303KG This report ~s exc~us~','e!y fo' l".e use of the cl,er', ma:ca:ed al.eve and shah not be reproducecJ except m fu;I w~thout the wr~len approval of HBC Engineering. Inc.