Loading...
Riverside Church-LR 940425REPORT OF IN-PLACE DENSITY TESTS H~ ENGINF_ZR[I~, INC. 4747 l~'ing Boule,-ard, Suite 206 Dallas, Texas 75247 Client: Riverside Church of Christ Date: 04/25/94 Prelect No. 43-1069-94 Project: Riverside Church of Christ Report No. 940154 Client No. 74767500 Laboratory Test Method: ASTM D-698 Moisture Optimum Density Requirement M/D No. Material Description % (PCF) _ Moisture Density 940125 Medium brown clay, lime treated 28.1 88.5 -2/+3 95% Field Test Method: ASTM D-2922 / D-3017 FIELD DENSITY TEST M/D Moisture Dry Density Density Test No. Test Location No. % __ _ (PCF) % Test Of: General Fill 1 North side parking ares final lift, at west I 26.5 88.6 100.1 building line. 2 Final lift, north parking area at north 1 28.3 81.0 91.5' east comer. 3 Final lift, east parking area at north 1 29.0 89.9 101.5 building line. 4 Retest of#2, this report I 28.8 84.2 95.1 Complies except where noted (*). Technician: Dennis Taylor Start: 12:30 pm Stop: 2:00 pm HBC ENGINEERING, INC. Report Distribution: ~ (1) Westdale Asset Management . (2) Corgan Associates (1) Urban Architecture (1) City of Coppell 302KG Th.s repot, Is exclusively for the use of the erie", indicatec aucve snd s~.a!, not ce reproduced except :n fagl w;t~eb; -',he '~Te.',ep a=p-cval of HBC E'~G neer~'~_e. Inc.